Tahapan Proses Kontruksi PLTU Teluk Sirih 2 x 112 MW

Cumulative
Up to last month

Descriotio Weight
n
Factor

Plan

Actual

EOT 2

Cumulative

This month

Plan

Original
A

Increment

Plan

Plan

Original

Up to this month

Actual

Plan

EOT 2

Original

Plan

Actual

EOT 2

Actual
to

All
i=h*b

0.00% 0.00% 100.00%

100.00%

100.00%

63.67%

0.00%

0.00% 0.00% 100.00%

100.00%

100.00%

26.65%

100.00% 100.00%

0.00%

0.00% 0.00% 100.00%

100.00%

100.00%

5.16%

100.00% 100.00%

0.00%

0.00% 0.00% 100.00%

100.00%

100.00%

4.51%

Civil

63,67%

100.00%

100.00% 100.00%

0.00%

Mechanic

26,65%

100.00%

100.00% 100.00%

al
Electrical

5,16%

100.00%

I&C

4,51%

100.00%

Overall

100,00% 100.0%

100.00% 100.00% 0.00%

0.00% 0.00% 100.00% 100.00% 100.00% 100.00%

Civil Works
Civil Works
Steam Turbine Building
Boiler house & auxiliaries
administration buliding
Chimney
CW intake pump house
chlorination Building
waste water treatment facilities
building
fuel oil tank farm foundation
coal storage and handling
facilities
ash pond & ash handling
facilities and bottom & fly ash
silo
Substation of 150 kV switcyard
Jetty and access trestle
structures
site drainage
access road work
site development

Mechanical
Works
Mechanical Works
Boiler and auxiliary Plant
Pulverized Coal Firing (PC)
Boiler and auxiliary Plant
condenser and feed water
heating plant
Steam Turbine and Auxiliary
Plant
waste water treatment plant

Electrical and I & C Works


Works
Electrical Works
Transformer
Cabling
Cathodic Protection
Lighting
Communication System
150 kV Power Station Substation
Batteries and Battery charger
Emergency Diesel Generator

fire protection system


chemical feed system
coal handling System
chlorination system
elevator
crane and hoist
Plant Water System
Ash Handling System

I&C Works
Control Valve
Transmitters
Measurements
Panel Mounted Instruments
Central Control Room
Human Machine Interface
Plant Control Systems

First Year Inspection PLTU Teluk


Sirih
Sipil

Turbine

Continue Dewatering Fire fighting tank B after repair

Open trust bearing


disconnect lp and generator rotor

Boiler
Check Dumper for Air Duct

pull out hp rotor


cleaning diaphragma

repair drain line for boiler slag


repair expantion joint
repair hot insulation at steam drum
penetrant test

electrical

BOP & coal and ash handling

I&C instrument

Check and cleaning mechanical part ESP


adding new lubricant oil for vibrating feeder bottom
ash

pull out generator


check main transformer

check and repair actuator at


turbine area
check and repair motorized valve

Proteksi pada Turbin

Local Hand Trip


Remote emergency push buttons
Low bearing oil presssure trip
Loss of relay fluid pressure trip
Externally initiated electrical system trips
Overspeed protection
High turbine exhaust temperatures
High condenser pressure

Commissioning pada PLTU Teluk


Sirih

Start up unit commissioning


Fast cut back ( FCB )
Synchronizing
30 days realibility test run
Performance test

Boiler Foundation

Trestle Foundation

Coal Handling Facility

Access Road

Office Building

Turbine and Generator

Chlorination System

CWT System

Condenser

Pretreatment System

Main Transformers

Central Control

Switchyard
Equipment

Cable System

FYI Turbine

FYI Boiler

FYI I&C Instrument


FYI Electrical

FYI Sipil

TERIMA KASIH