Beruflich Dokumente
Kultur Dokumente
AUSTRIA
Recycling of Worn Concrete Pavements into New Concrete Pavements
Mario Krmek
Austrian Motorway and Expressway Financing plc.
Content
Austria?
Key Figures
ASFINAG? Company Overview
How?
Regulations Concrete Pavements and Recycling
Experiences? Case Study
In Detail?
Steps of the Recycling Procedure
2
10/16/16
Austria
Source:
www.wikipedia.de
Ecuador - Austria
Highway Network
Source:
en.wikipedia.org
RELIABILITY ALL THE WAY.
> 35
age in [years]
<5
from 21 to 25
from 16 to 20
from 11 to 15
from 6 to 10
Main Regulations:
Pavement Design - Guidelines and Specifications for
Roads RVS 03.08.63
Pavement Construction - Guidelines and Specifications
for Roads RVS 08.17.02
Concrete Production - NORM B 4710-1 Concrete - Part
1: Specification, production, use and verification of
conformity (Austrian Rules for the implementation of
European Standard EN 206-1 for normal and heavy
concrete)
RELIABILITY ALL THE WAY.
10
concrete layer
HMA layer
unbound base course
relevant for
motorways
concrete layer
HMA layer
cement stabilised layer
11
Regulations Construction
Guidelines and Specifications for Roads RVS 08.17.02
cross section
22 cm (load class I)
h=
25 cm (load
class S)
12
Regulations Construction
Guidelines and Specifications for Roads RVS 08.17.02
tie bar
dowel
13
Regulations Construction
Guidelines and Specifications for Roads RVS 08.17.02
14
Regulations Construction
Surface: Exposed Aggregate Concrete
Upper concrete
layer (top lift
4 cm):
increased
requirements
concerning
aggregate
higher
quantity of
cement
no recycling
material
allowed
15
Regulations Construction
Austrian Standard NORM B 4710-1
a
pr
a
tic
ou
v
fa
bl
ra
grain size
> 4 mm:
recycling
material in
3 particle size
groups
16
Milestones
1990
recycling concept
1992
prove of concept
1996-1998
1998
1999-2011
general refurbishment
17
18
19
20
21
22
23
refurbishment in total:
5,700,000 m
230 km
costs in total:
approx. 1.3 bn. (appr. 50% for Pavement)
economical savings in construction:
approx. 1,85 /m
ecological savings appr.
- 1,700,000 km of transport
-1,445 tons CO2
RELIABILITY ALL THE WAY.
24
25
Demolishing:
Guillotine
26
Demolishing:
Pneumatic
hammer
Source: ASFINAG
RELIABILITY ALL THE WAY.
27
Source: ASFINAG
RELIABILITY ALL THE WAY.
28
Interim
storage
29
Recycling
facility
30
31
Crushing
machine
Source: Holding
ASFINAG
Source: Asamer
AG
RELIABILITY ALL THE WAY.
32
Dedusting
and
washing
33
Sieving
34
Mixing
plant
35
Two-lift
paving
36
37
Summary
Additional Attention
preparation of project ( preliminary investigations)
composition of reasonable sections (appr. 6-10 km)
quality control and assurance concrete production
Benefits
ecological
economical
Disadvantages
difficulties in urban sections
space for recycling facilities needed
RELIABILITY ALL THE WAY.
38