Beruflich Dokumente
Kultur Dokumente
NTT DoCoMo
Privileged and confidential. The information contained in this material is privileged and confidential, and is intended only for the use of the individual to whom it
is addressed and others who have been specifically authorized to receive it. If you are not the intended recipient, you are hereby notified that any
dissemination, distribution or copying of this material is strictly prohibited. If you have received this material in error, please destroy it immediately.
Table Of Contents
Team Structure
Project Approach RAN, TXN & CORE
Document Submission
Team Structure
Project
Manager
Back Office
Sr.
Specialist
Core
Specialist
Core
Jr.
Specialist
Core
Sr.
Specialist RAN
Specialist
RAN
Jr.
Specialist
RAN
Sr.
Specialist Tx
Specialist
Tx
Jr.
Specialist
Tx
Project Approach
RAN
Inputs From
ROBI
Propagation
Model
Smoothing
Nominal
Plan for year
1 and 5
Nominal
Plan
Validation
Node-B
Parameter
Selection
Documentati
on and
Report
Preperation
Simulations
UMTS
Strategy
BoQ
Reporting
Project Approach
TXN
Robi Existing
TX Review
Initial
Services /
Traffic Plan
Traffic Model
Report
Network
Migration
Report
Report on
Transport
solution
Design and
Dim.
Stretegy
Backbone
Connectivity
Report
Dimensionin
g Interfaces
Network
Arch. /
Topology
Report
IP planning
& reporting
Link
Capacity
Dim and
reporting
BoQ
preperation
Documentati
on
Validation of
TX planning
5
Project Approach
EPC
Customer
Requirement
Review
Existing PS Core
Network &
Design Analysis
Existing PS Core
Features &
Interface
Analysis
EPC NW
Planning and
Design strategy
Singaling
Network
Planning
EPC NW feature
planning
EPC NW
Interface
Design &
Dimensioning
EPC NW
Dimensioning
Design &
Dimension
Report
Submission &
Review
BoQ
Preparation
Final Plan
Acceptance
Final Plan
Submission &
Review
QOS Planning
Capacity/Coverage Planning
Thank You