Sie sind auf Seite 1von 24

Designe of 20000 DWT Cargo Ship

NAME- 338

Objective : Design of 20000 dwt General Cargo

Prepared by :
1.Md. Maruf Billa
1312006
2.Md. Ashifur Rahaman 1312029
3.Md. Abdur Rahim
1312036

Under Supervision of :
Professor Dr. Md. Sahajada Tarafdar

Contents :

Requirements
Basis Ship
Principal Particulars Calculation
General Arrangement
Lines Plan
Offset Table
Hydrostatic Calculation
Graphs

Requirements
DWT : 20000 Tonnes.
Route : World Wide
Speed : 17 Nautical miles.

Route:

Distances : Chittagong Port to Keppel Harbor Port, Singapore 1863 Nautical mile
Distance from Bangladesh to China 3231
Distance from Bangladesh to Hong kong 3038
Distance from Bangladesh to Japan 4284
Distance from Bangladesh to Malaysia 2021
Average distance : 3500 Nautical mile
Speed
: 17 knots
Endurance
: 10 days

Basis Ship Data :

[Sourec : KoyoKuo Shipyard Corporation, Japan


Link
: http://www.kyokuyoshipyard.com/pdfs/a5626(1)r.pdf]

Calculation For New Ship:

General Arrangement Of Ship :


NAVIGATION DECK :
# OWNER 1
# CAPTAIN 1
# CHIEF & SECOND MATE 1
# CHIEF ENGR. 1
# DINING ROOM
# DECK MAINTENANCE
BRIDGE DECK :
# LIFE BOAT
# CREW DINING ROOM
# SEA MAN
# ELECTRIC STORAGE
# ELECTRICIAN
#GPS OPERATOR
# RADIO OPERATOR
#GANTY CRANE OPERATOR
#STORE ROOM
#EXTRA CABIN 1, 2, 3
#CHIEF & 1ST & 2nD ENGR
# DECK MAINTENENCE

MAIN DECK
# GARAGE STORAGE
#EXTRA CABIN
#ENG SHOP & STOREGE
# EMERGENCY GENERATOR ROOM
# CO2 BOTTLE ROOM
# DECK MAINTENANCE ROOM
# AC & REFREGERATION ROOM
#LAUNDRY

General Arrangement Of Ship :


Free Board Calculation:
Ship Length (Lbp)

Freeboard (mm)

245

3949

246

3965

By liniear inter pulation for length L = 145.28 FreeBoard Is 3953.48 mm


Sheer Calculation :

[source : Rules for Ships, January 2001 ; Pt.3 Ch.5 Sec.3 Page 17]

Wheel House Height:


[According to https: panama-canal-bridge-visibility-requirements]

Dimention for Bulbusbow:

Calculation of Determining the Distance of Cargo holds


from Collision Bulkhead:

Navigation In Ice:

[According to GL-2008 Chapter 1, page 15-4 , section -15A]

Length Of Cargo Hold :

Length remaining = L - (7% of L For Forcastle ) ( 15% of L/2 For Poop deck) Lf
= 145.28 ( .07145.28+.15(145.28/2)+3.53) m
= 145.28 25.59 m
=120.68 m
So Length of Cargo hold = 120/5 = 24 m (minimum)

Lines Plan :

Profile

Half-Breadth Plan

Offset Table :
L Water
s

Lines
0

0.5

Half Breadths
0.00
967.29
1202.79

1836.65
2266.92
2445.19

2119.46
2512.32
2818.24

1554.93
2134.87
2890.87

3.30
2462.80
4035.34

1421.78
4084.86
5659.60

3017.42
5325.06
6863.48

4439.20
6437.61
7884.70

1275.42
1492.21
1886.17
2406.68
3733.81
6104.18
8445.93
9428.63
9427.52
9426.42
9425.32
9423.12
9422.02
9420.92
9078.68
6083.27
3136.27
1941.19
1572.54
1378.86
0.00
0.00

2700.50
3077.95
4010.03
4994.93
6374.89
9214.04
10881.21
11478.76
11477.66
11476.56
11475.46
11474.35
11473.25
11471.05
11285.08
9648.71
6031.55
3882.38
3150.58
2808.34
1519.72
0.00

3293.64
3931.90
5366.88
7143.00
9296.57
10640.22
11603.11
12042.19
12041.08
12039.98
12037.78
12036.68
12035.58
12034.48
11921.14
10821.79
9405.52
7350.98
6071.16
5243.63
3386.07
0.00

3805.34
4731.92
6692.92
8767.26
10335.39
11320.29
12016.88
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12301.89
11633.92
10799.78
9764.26
9102.89
8358.99
6675.31
0.00

5246.93
6218.62
7939.72
9634.41
10825.09
11543.68
12065.29
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12273.28
11813.29
11253.17
10576.39
10124.11
9538.67
8374.40
0.00

6816.17
7725.13
9195.33
10395.92
11211.35
11748.37
12134.62
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12298.59
11993.77
11611.91
11148.62
10810.79
10318.89
9374.70
6422.21

8057.47
8987.35
10252.86
11012.17
11544.78
11934.34
12191.85
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12314.00
12145.63
11916.73
11625.12
11367.61
10929.63
10153.82
8520.76

9017.06
9873.21
10930.73
11474.35
11854.01
12113.71
12249.07
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12325.00
12318.40
12254.57
12139.02
11964.05
11753.87
11336.80
10652.32
9517.76

Offset Table : ( BTK distance From keel)

Results From Hydrostatic Calculation:


Water Lines

In Graph 1
Unit
Equivalent to

0.5

Displacement 150 t
(t)

1780

4034

9126

1443
6

200
61

258
63

2638
0

LCF from
Amitship (m)

0.05 m

3.62

4.56

5.84

5.31

4.37

3.50

2.77

BMt (m)

0.25 m

42.60

24.90

13.10

8.88

6.85

5.60

5.85

BML (m)

7.5 m

1303

774.2

407.2

285.2

232.
2

195.
6

202.
9

TPI (t)

0.02 t/in

5.39

6.28

6.87

7.16

7.51

7.77

7.97

MCTC

1.25 t/cm

133.8

179.2

213.2

236.3

267.
2

290.
4

307.
1

VCB (KB)

0.025 m

0.49

0.97

1.97

2.92

3.88

4.85

4.75

LCB

0.011 m

3.88

3.94

4.82

5.09

5.04

4.77

4.70

Hydrostatic Curves :

Thanks Everybody for being here..


You are welcome to throw any Question ..

Das könnte Ihnen auch gefallen