Beruflich Dokumente
Kultur Dokumente
Solution Methods
The Initial
NW Corner
Solution
75
cost = $4,550.
- The minimum cell cost method will provide a solution
feasible
cell
with
transportation cost, and
remaining requirements.
minimum
adjust the
all
rim
The Second
VAM
Allocation
The Initial
VAM Solution