Beruflich Dokumente
Kultur Dokumente
OBSERVATION:
BEFORE MODIFICATION S-6112 TOP PRESSURE WAS
REMAIN 2.5 barg. AT 100% PLANT LOAD. IT WAS ONE
OF THE MAIN LOAD GOVERNING PARAMETER.
NOW TOP PRESSURE AT 100% PLAT LOAD IS
1.95 TO 2 barg.
ALSO WE CAN REGULATE S-6112 TOP PRESSURE BY
CHANGING C-6651 TOP PRESSURE. AT 110% PLANT
LOAD C-6651TOP PRESS.WAS 1.8 barg. S-6112 TOP
PRESS. WAS 2.4 barg.
OBSERVATIONS
P-6113 DISCHARGE FT-6165 IS NOT INDICATING
AFTER SHUT DOWN.
P-6113 Amp. INCREASED FROM 235 TO 250 amp.
FROM PUMP CHARACTERISTIC CURVE IT IS 920
M3/HR.
SECTION 63:
HIGHER CAPACITY FILTER F-6307 HAS BEEN
ORDERDED.
6303 CIRCULATION FLOW INCREASED FROM 56
TO 65 M/HR FOR BETTER STRIPPING.
OBSERVATION:
NO SIGNIFICANT IMPROVEMENT IN STRIPPING
WAS OBSERVED.
SECTION 71:
P 7112 AND P 7107 OF HIGH HEAD AND FLOW
ORDER GIVEN.(OCT01)
LCV 7105 OF HIGHER SIZE TO BE INSTALLED.
E 7109 ODCB-ODCB COOLER PROCUREMENT.
C 7101 WILL HANDLE MAX. LOAD UP TO 140%.
SECTION 66:
OPERATION OF C 6651 AT GREATER THAN 115% IS
DOUBT
FULL.(AS
PER
REPORT
OF
DR.
S.R.BHUTADA).