Kazakhstan Caspian Offshore Industries LLP

Fare clic per modificare lo stile del


titolo
Rationale behind establishing KCOI facilities inside the bottle
Caspian Sea is a completely closed water body with only one access to it
through the Volga-Don Channel system and could be compared to a bottle
with a bottleneck. Based on the country origin of equipment and
processing facilities for an offshore field development, the concepts of field
development in the Caspian region can be defined as:
Outside the bottle means fabrication of the equipment and
processing facilities outside the Caspian region and their delivery to
the Caspian Sea.
Inside the bottle means fabrication of the equipment and
processing facilities inside the Caspian region
Supply and transportation of oil-field equipment, heavy modules through
the Volga-Don Channel involves significant project contingencies and
schedule risks associated with the DIMENSIONAL and SEASONAL
restrictions of Volga-Don channel, thus effecting timely supply of these
goods under strict delivery deadlines.

KCOI is one of the pioneers who realized the necessity and


advantage of developing permanently installed fabrication facility
"Inside the bottle means fabrication of the equipment and
processing facilities within the Caspian region.

Outline
KAZAKHSTAN
CASPIAN
OFFSHORE
INDUSTRIES LLP (KCOI) is an EPC contractor
established in the Mangystau Region. Ever
since its foundation in 2008, KCOI has been
been providing its contribution to the growth
of Kazakhstan economy and industry.

KCOI is a new production complex adequate to


service Kazakhstan programs for Oil & Gas industry
fast growth thus supporting governmental social and
economic policies;

It creates new local employment opportunities;

Through KCOI there is a transfer of sound industrial


knowledge and expertise to local staff and workforce;

KCOI is part of the efforts to produce more local


business content which contributes to Kazakhstan
national budget.

Corporate Information
Company
Name
Ownersh
ip

Kazakhstan Caspian Offshore Industries Limited


Liability Partnership (KCOI) is an independent
company established in July 2008 in the Republic of
Kazakhstan.
Registered in Aktau, Mangstau Region, Republic of
Kazakhstan, KCOI is owned and fully supported by the
following Kazakh companies:
10% Rosetti Marino S.p.A. in Italy

Missi
on

40% Rosetti Kazakhstan LLP, Aktau Rosetti Kazakhstan is


fully owned by
Rosetti Marino S.p.A. in
Italy
50% MART Machinery Plant LLP, Aktobe

Provide its Clients and stakeholders with the best


value by running safe
and environmentally responsible operations in strict
compliance with law and ethics
act as an EPC and/or construction contractor and
successfully serve the

Rosetti Marino provides:


Expertise in the offshore & onshore industry

Project management
Integrated engineering, procurement and
fabrication skills
Long standing references with top class oil
companies
Know-how transfer to local staff and work
force

Rosetti Marino is an Italian private EPC


Contractor with more than 35 years
experience in the offshore Oil & Gas
Industry

MMP provides:
Contribution to local staff and work force

Acquaintance with local business


environment

Local relations with in-country industrial


partners & subcontractors

Expertise for local logistics

We consider a strategic key to success to


merge international company know-how
with local partner understanding of
Kazakh stakeholders expectations

Fare clic per modificare lo stile del


titolo
Commitment for excellence in SAFETY and Best performance

KCOI operates according to QHSE principles, for the best


success of the company and for its full compliance with
International HSE rules and standards of the onshore and
offshore oil & gas industry and RoK laws requirements.
Certification for compliance with ISO 9000:2000, ISO
HSE Objectives
14001:2004,
BS OHSAS 18001:2007 obtained by Lloyds
Zero Injury
Accident Free
Register
in Apriland
2014.
HSE Management Principles
Top Management commitment
Accountability
Communication
Risk assessment and control
Training and competence
FREE
I
T
L
s
r
n- ho u
a
m
million
8
r
e
Ov

Fare clic per modificare lo stile del


titolo
Overview: Rosetti Group structure

BRANCHES AND REPRESENTATIVE OFFICES

Rosetti Marino Tunisia branch


Fores do Brasil Sistemas e Equipamentos Industriais Ltda (Brasil)

Rosetti General Contracting Costrucoes & Servicos LDA (Portugal)


Rosetti Mozambique Limitada (Mozambique)

Fare clic per modificare lo stile del


titolo
KCOIs Corporate structure and Management system
SHAREHOLDERS GENERAL ASSEMBLY
BOARD OF DIRECTORS

KCOI has implemented the


accredited Management system of
Rosetti Marino aimed to meet
Customer requirements and achieve
Customer satisfaction at 100%

Branch in Atyrau
In April 2011 KCOI established a
Branch in Atyrau to serve the
offshore projects either on
Kashagan field either in
Karabatan/ Eskene fields
The branch is currently engaged
in the following works:
PSN KAZSTROY JSC - Frame
Agreement for Fabrication &
Installation Works of Brownfield
Modifications Offshore & Onshore
NCOC N.V. - Modification of
2x28 inch Pig traps Offshore &
Onshore

Atyrau Branch organization chart


KCOI EXECUTIVE DIRECTOR, A.
HELTAI
BRANCH MANAGER
Rustem Aldiyarov

FINANCE & CONTROL


HUMAN RESOURCES
PROCUREMENT

Functionall
y report to
Operation

PROJECT
MANAGEMENT
TEAM

Fare clic per modificare lo stile del


titolo
KCOI Annual Turnover

Revenues (euro)
160
Company
was
established
targeting
Company
was
established
targeting
offshore
offshore projects
projects in
in Caspian
Caspian sea,
sea, mainly
mainly
Kashagan
Experimental
Development
Kashagan
Experimental
Development
program.
program.

140
120
100
80

Currently,
KCOI
is
exploring
other
Currently,
KCOI
is
exploring
other
opportunities
opportunities Onshore,
Onshore, aiming
aiming at
at giant
giant
projects
projects of
of TCO
TCO &
& KPO.
KPO.

60
40
20
0

Revenue (euro)

Human Resources
Manpower, August 2016
Local

699

Expats
(Italian)

21

Third Country

17

KCOI manpower is planned to be developed


according to the following guidelines:

73
7
421

217
188

193
122
1

30

70

Dec 09 Dec 10

Dec 11

Dec 12

Dec 13

Dec 14 Dec 15 Current

Priority assigned to recruitment and training


of Kazakh
nationals from Mangystau region and also
from other areas of Kazakhstan
KCOI staff will consist of a mix of local people,
expats
(mainly from Europe) and Third Country
Nationals (mainly from Asia)
The presence of expats and TCN will be
progressively
decreased during KCOI lifetime following the
company build-up of capabilities by local
resources for both managerial and direct
operations functions
Contribution to KCOI production capacity will
be given also by local subcontractors for
various work disciplines
A training centre for direct workers is
available in KCOI yard so as to develop the
necessary expertise and qualification

Our highest Recorded manpower, including subcontracted manpower is


over 1,000 personnel

FIELDS OF ACTIVITY
KCOI: A LONG TERM SOLID EPC CONTRACTOR
OFFSHORE

PLATFORMS
JACKETS
LIVING QUARTERS
PROCESS MODULES
COMPRESSION MODULES
SUBSEA MANIFOLDS/TEMPLATES
TEMPORARY UTILITY BARGES (TUB)

FIELDS OF ACTIVITY
KCOI: A LONG TERM SOLID EPC CONTRACTOR
ONSHORE
HYDROGEN AND SYNGAS PLANTS
DEHYDRATION UNITS
GAS SWEETENING
SOUR WATER STRIPPER
SULPHUR RECOVERY UNITS
WELLHEAD PACKAGES AND ENHANCED OIL
RECOVERY UNITS
WATER TREATMENT FACILITIES
POWER GENERATION PACKAGES
AIR AND GAS COMPRESSION PACKAGES
HEAVY WALL PRESSURE VESSELS
MAIN FRACTIONATOR COLUMNS
GAS LIQUID SEPARATION UNITS
SLUG CATCHERS
SKID MOUNTED PROCESS PACKAGES AND
PROCESS AUTOMATION&CONTROL

FIELDS OF ACTIVITY
KCOI: A LONG TERM SOLID EPC CONTRACTOR
SHIPBUILDING
HARBOUR TUGS
OCEAN GOING TUGS
SUPPLY VESSELS
ANCHOR HANDLING
FERRIES

Products & Services


Onshore
activitie
s

Logistic
Base

Development of logistic base


to support oil companies,
freight forwarders, service
companies that may need
facilities, warehouses and
storage areas with easy
access from sea, road and
even air.

KCOI

Ship
building

Offshore
activitie
s Temir
At yard

Kashagan field will require


approx 100 vessels to
provide services to oil
extraction and treatment
facilities

Temir At Yard

KCOI yard is located in a land


plot of 88 hectares. These
land plots are the property of
the company and are located
near the village of Akshukur,
less than 27 Km far from
Aktau city and at about 8 km
from
Aktau
international
airport, along the coast of
Mangystau Region.

Fare clic per modificare lo stile del


titolo
KCOI Yard - Temir At (I / V)

KCOIs Land
plot property
88 ha

Phase
3

Phase
2

Pre-Phase
2
Completed

in August 2014

Phase
1
Completed
in 2012

KCOIs Temir At yard is


located in a land plot of
88 hectares. These land
plots are the property of
the company and are
located near the village
of S.Shapagatov, circa
27 Km far from Aktau city
and at about 8 km from
EASY TO COMMUTE
Aktau
international
airport, along the coast of
Mangystau
NO ROTATION
- Our Region.
employees
benefit from close location of KCOI
Yard to Aktau city, thus enjoy
quality time with their families
after work hours

Fare clic per modificare lo stile del


titolo
KCOI Yard - Temir At (II / V)

CURRENT
LAYOUT

Fare clic per modificare lo stile del


titolo
KCOI Yard - Temir At (III / V)
Main Structural and Piping Workshops:
Dimensions : 102 m x 73 m x 21 m
2 bays for structures, 1 bay for piping;
No. 4 overhead cranes 20 tons
No. 2 overhead cranes 30 tons (Pre-Assembly)
Structures 400 tons/month
Piping 9.300 inches/month (1 st year)
Piping 12.500 inches/month (2 nd year)
Financed in 2013-2014 by KCOI
Possibility to customize Workshop layouts and
productivities

based

on

project

requirement

(Steel and Piping).


Capacity

can

means

subcontract

of

workshops.

be

significantly
to

improved

reliable

by

external

Fare clic per modificare lo stile del


titolo
KCOI Yard - Temir At (IV / V)

Phase
2

Fare clic per modificare lo stile del


titolo
KCOI Yard - Temir At (V / V)
Main covered areas, m2:

Today

Phase 2

Total

Structural steel fabrication and assembly workshop

4.900

4.900

Piping fabrication workshop

2.450

2.450

Sandblasting and painting workshop / shelters

502

4.600

4.600

Covered warehouses

770

1750

2.520

502

502

1612

1.496

3.108

Maintenance workshop
Offices
Canteen + kitchen

1.972

1.972

Changing Rooms

966

996

1.992

First aid/infirmary/gate security

356

356

TOTAL covered areas

13.558

9.344

22.902

Fare clic per modificare lo stile del


titolo
KCOIs Quay and Breakwater facilities
Description of main Facilities
Total length of yard sea front

~ 1.000 m

~ 120 m
Total length of the quay
220 m
Sheet-piled length
~2 m
Quay level above average sea level
Quay strength (load per linear meter on 15 metric tons / linear
m
quay edge)
20 Kg /cm2
Allowable pressure in quay area
Dredged to ~ 5 m
Water depth in front of the quay
Width of access channel (dredged on
~ 200 m
sea bed)
Length of access channel (dredged on
~ 300 m
sea bed)

The quay strengthening is provided by sheet piles.


The quay length set above may be increased to more than 300 m if KCOI undertakes also shipbuilding activities.
The water depth is dredged to ~ 5 m and the width of access channel in front of the quay is ~ 200 m.
These dimensions allow for access, manoeuvring and mooring of barges with total length of about 95-100 m (like transport barges TB95). The
yard is able to build and load-out modules in the range about 5.000-8.000 metric tons each

Yard Capabilities
Target products:

Jackets, Platforms Topsides, Modules (PAUs &


Piperacks) up to 4-5000 tons each, Platforms ,
Manifold assemblies, Bridges, Ice protection
structures Pig launchers and Receivers.
Yard capacity:
Target tonnage 7-8.000 tons/year
Phase 2:
Target tonnage 12-14.000 tons/year
Capacity
Capacity can
can be
be further
further increase
increase by
by using
using some
some of
of our
our sub-supplier
sub-supplier to
to
carry
carry out
out pre-fabrications.
pre-fabrications.

PAU = Pre Assembled Units

The Investment
In 2009, KCOI shareholders approved the
plans for the development of KCOI yard,
located in Akshukur (north of Aktau city)
to be implemented in 2 Phases (Ph.1 &
Ph.2).

The Investment
excess of

plans

are

in

EUR 50 million
for both Phase 1 and Phase 2.
These investments mainly covers:

purchase of land plot of about 88


hectares;
soil preparation at yard site;
construction of an access road connecting
KCOI yard
to the national road (3 km) between Aktau
City, Fort Shevchenko & Bautino;
installation of buildings, facilities, utilities
&
equipment required for yard operations;
construction of a load out quay, break
water facility

Ceremony with Kazakhstani and Italian


Authorities (2011)

Development Facts
The local content of capital expenditure at date
is 95%
All physical works completed at date
have been performed by local
subcontractors selected through
prequalification process and
competitive bidding
May 2011

July 2011
July 2011

July 2011

PROJECT REFERENCES
PROJECTS IN THE CASPIAN:

Ongoing Projects
Projects Completed by KCOI
Projects Executed in the Caspian Region by Rosetti Group
Projects Reference of Rosetti Group for the Caspian
Region

executed in Ravenna, Italy

Ongoing Projects
Early
EarlyWorks,
Works,Site
SitePreparation,
Preparation,Load-In,
Load-In,Installation,
Installation,Hook-Up,
Hook-Up,Mechanical
MechanicalCompletion,
Completion,
Pre-Commissioning
of
Topsides
For
EP
Clusters
3
and
4
(offshore)
Pre-Commissioning of Topsides For EP Clusters 3 and 4 (offshore)
Client:
JV
Client:
JVConsortium
ConsortiumENKA
ENKAMontazhspetstroy
Montazhspetstroy/ /Final
FinalClientNCOC
ClientNCOCN.V.
N.V.
Location:
North
Caspian
Sea,
Kazakhstan
Sector
Location:
North Caspian Sea, Kazakhstan Sector
Contracting
Entity:
Contracting Entity: KCOI
KCOI

WO

Date of Contract Award:


2016
Type of Contract:
Lump Sum and unit rates
Duration : 2017

RK
IN

PR
OG
RE

SS

Scope of Work description:

Marine Civil Works (Early Works and Site Preparation) are


done by ENKA;

Electrical and Instrumentation Works are done by JSC


Montazhspetsstroy;

Load-In and Onsite Installation of Topside Modules on EPC-3


Island (Load-In Engineering, Method of Statement, On-Site
Supervision);

Mechanical Hook-Up and Completion of Topside Facilities;

Pre-Commissioning and Commissioning Activities

Ongoing Projects
FRAME
FRAMEAGREEMNT
AGREEMNTFOR
FORFABRICATION
FABRICATION&&INSTALLATION
INSTALLATIONWORKS
WORKSOF
OFBROWNFIELD
BROWNFIELDMODIFICATIONS
MODIFICATIONS
OFFSHORE
&
ONSHORE
OFFSHORE & ONSHORE
Client:
Client:
Location:
Location:
Contracting
ContractingEntity:
Entity:

PSN
PSNKazstroy
Kazstroy/ /NCOC
NCOC
Offshore/Onshore
Offshore/OnshoreKarabatan/KCOI
Karabatan/KCOITemir
TemirAt
AtYard
Yard
KCOI
KCOI

Date
of
Contract
Award:
July 2015
Type of Contract:
Lump sums & Daily
rates
Duration : 1 years

Scope of Work description:


Plant modifications (Piping, Steel
structure, etc.)
Material grades CS , Low alloy steels
including F22 material , SS, Cu-Ni &
Incoloy.
Workshop Prefabrication
Hydrotest, Leak test, Mechanical
Completion

WO
RK
IN
PR
OG
RE
SS

Ongoing Projects
PROVISION
PROVISIONOF
OFCONSTRUCTION
CONSTRUCTIONENGINEERING
ENGINEERINGAND
ANDCONSTRUCTION
CONSTRUCTIONSERVICES
SERVICESFOR
FORBUILDINGS
BUILDINGS
Final
TCO
FinalClient:
Client:
TCO
Location:
KCOI
Location:
KCOIYard
Yard
Main
Contractor:
SKEMA
Main Contractor:
SKEMALER
LER
Contracting
Entity:
KCOI
Contracting Entity:
KCOI

WO
RK
I

Date of Contract Award:


November 2014
Type of Contract:
Lump Sum
Duration : (postponed)

NP
RO
GR
ES
S

Scope of Work description:


Engineering, Procurement and
Construction
Engineering
Procurement
Fabrication
E&I and HVAC

Ongoing Projects
CO
MP
LE

PROVISION
PROVISIONOF
OFFABRICATION
FABRICATIONAND
ANDWELDING
WELDINGSERVICES
SERVICESFOR
FOREPC
EPC2&3
2&3
Client:
Client:
Location:
Location:
Contracting
ContractingEntity:
Entity:

ER
ERSAI
SAICaspian
CaspianContractor
ContractorLLC
LLC
The
industrial
base
(ERSAI
Caspian
The industrial base (ERSAI CaspianYard)
Yard)
KCOI
KCOI

Date
of
Contract
Award:
November 2014
Type of Contract:
Unit Rates
Duration : 2016

Scope of Work description:


Prefabrication and erection of
Piping, piping supports
Pre-heating
Pressure Pipe Welding
Material grades CS , Low alloy
steels including F22 material , SS,
Cu-Ni & Incoloy.

TE
DP
RO
JE
CT

Ongoing Projects
CO
MP
LE

Modification
Modificationof
of2x28
2x28inch
inchPig
Pigtraps
traps(onshore)
(onshore)
Client:
NCOC
N.V.
Client:
NCOC N.V.
Location:
North
Caspian
Location:
North CaspianSea,
Sea,Kazakhstan
KazakhstanSector,
Sector,Karabatan
Karabatan
Contracting
Entity:
JV
Consortium
KCOI
LLP
and
JSC
Montazhspetstroy
Contracting Entity:
JV Consortium KCOI LLP and JSC Montazhspetstroy
Date of Contract Award:
2015
Type of Contract:
Lump Sum and unit rates
Duration : 2016

TE
DP
RO
JE
CT

Scope of Work description:

Construction engineering production and issuing of the


constructive schemes (i.e. structural shop drawings), and
red-line marked up shop drawing (as-builts) for structures.

Supply, procurement, fabrication of steel structure.

Inspection (visual checks / dimensional checks, nondestructive tests)

Painting

Installation

Final documentations

Electrical and Instrumentation Works onshore are done b


JSC Montazhspetsstroy.

Ongoing Projects
CO
MP
LE

Modification
Modificationof
of2x28
2x28inch
inchPig
Pigtraps
traps(offshore)
(offshore)
Client:
NCOC
Client:
NCOCN.V.
N.V.
Location:
North
Location:
NorthCaspian
CaspianSea,
Sea,Kazakhstan
KazakhstanSector,
Sector,Island
IslandDD
Contracting
ContractingEntity:
Entity: JV
JVConsortium
ConsortiumKCOI
KCOILLP
LLPJSC
JSCMontazhspetsstroy
Montazhspetsstroy

Date
of
Contract
Award:
2015
Type of Contract:
Lump Sum and unit rates
Duration : 2016

TE
DP
RO
JE
CT

Scope of Work description:

Construction engineering production and issuing of the


constructive schemes (i.e. structural shop drawings), and
red-line marked up shop drawing (as-builts) for structures.

Supply, procurement, fabrication of steel structure.

Inspection (visual checks / dimensional checks, nondestructive tests)

Painting

Installation

Final documentations

Completed Projects
CO
MP
LE
Caspian
CaspianMarine
Marine&&Dredging
Dredgingcontractors
contractors(Van
(VanOord)
Oord)LLP
LLP

Vessels
Vesselsmooring
mooringand
andrepairing
repairingservices
servicesin
inTemir
TemirAt
At
Oil
Oiland
andGas
GasOffshore
OffshoreFacilities
FacilitiesFabrication
FabricationYard.
Yard.
Client:
Client:
Location:
Location:
Contracting
ContractingEntity:
Entity:

KCOI
KCOIYard
Yard
KCOI
KCOI

Date of Contract Award:


November 2015
Type of Contract:
Lump Sum & Daily rates
Duration :1 years

TE
DP
RO
JE
CT

Scope of Work description:


Vessels mooring
Vessels repairing services

Completed Projects
Supply
Supplyof
ofopen
opendrain
draintanks
tanks
Client:
Maersk
Client:
MaerskOil
OilKazakhstan
Kazakhstan
Location:
Dunga
Field
Development
Location:
Dunga Field Development
Contracting
Entity:
Contracting Entity: KCOI
KCOI
Date of Contract Award:
December 2014
Type of Contract:
Lump Sum
Duration : 10 month

CO
MP
LET
ED
PR
OJE
C

Scope of Work description:


Engineering, Procurement and Construction
Engineering
Procurement
Fabrication
Hydro-Testing and Commissioning

Completed Projects
CO
MP
LET
ED

Fabrication
Fabricationof
ofA-frame
A-frame&&dredging
dredgingPlough
Ploughfor
forAfon
AfonWen
Wentug
tugboat
boat
Client:
Caspiisky
Client:
CaspiiskyBuksir
BuksirLLP
LLP
Location:
KCOI
yard
Temir
At
Location:
KCOI yard Temir At
Contracting
Entity:
Contracting Entity: KCOI
KCOI

Date
of
Contract
Award:
March 2015
Type of Contract:
Lump Sum
Duration : 2 month

PR
OJE
CT

Scope of Work description:

Construction engineering production and issuing of the


constructive schemes (i.e. structural shop drawings), and
red-line marked up shop drawing (as-builts) for structures.

Supply, procurement, fabrication of steel structure.

Inspection (visual checks / dimensional checks, nondestructive tests)

Painting

Installation

Final documentations

Completed Projects
Well
WellClean-up
Clean-upDouble
DoubleBasket
BasketStrainer
StrainerUnit
Unit
Client:
Maersk
Client:
MaerskOil
OilKazakhstan
Kazakhstan
Location:
Dunga
Field
Development
Location:
Dunga Field Development
Contracting
Entity:
Contracting Entity: KCOI
KCOI

Date
of
Contract
Award:
January 2014
Type of Contract:
Turn Key
Completion date: 2015

CO
MP
LET
ED
PR
OJ

Scope of Work description:


Engineering, Procurement and Construction
Engineering
Procurement
Fabrication
Hydro-Testing and Commissioning

EC
T

Completed Projects
OFFSHORE
OFFSHORE&&ONSHORE
ONSHORECOMMISSIONING
COMMISSIONING
KARABATAN
KARABATAN AND
ANDISLAND
ISLANDDDSITES
SITES- -KASHAGAN
KASHAGAN EXPERIMENTAL
EXPERIMENTALPROJECT
PROJECT
Final
FinalClient:
Client:
Location:
Location:
Main
MainContractor:
Contractor:
Contracting
ContractingEntity:
Entity:

CO
MP
LET
ED

AGIP
AGIPKCO
KCO
North
Caspian
North CaspianSea,
Sea,Kazakhstan
KazakhstanSector,
Sector,Atyrau
Atyrau
IMTECH-BOLASHAK
IMTECH-BOLASHAK
KCOI
KCOI

Date
of
Contract
Award:
January 2011
Type of Contract:
Preliminaries LS
daily Rates, unit Rate,
reimbursable services
Duration : 3 years

PR
OJE
CT

Scope of Work description:


Offshore & Onshore Commissioning
Assistance
provision of commissioning
personnel
procurement services
testing & repair services
finishing/modifications works

Completed Projects
Well
WellHook
HookUp
Upinstallation
installationworks
workson
onK-Line,
K-Line,on
onL-Lines
L-Lines
Client:
Maersk
Client:
MaerskOil
OilKazakhstan
Kazakhstan
Location:
Dunga
Field
Development
Location:
Dunga Field Development
Contracting
Entity:
Contracting Entity: KCOI
KCOI

CO
MP
LET
ED
PR
OJE
C

Date of Contract Award:


October 2013
Type of Contract:
Turn Key
Completion date: 2015

Scope of Work description:


Procurement and Construction
Procurement
Fabrication
Installation on site
Hydro-Testing and Commissioning

Completed Projects
CO
MP
LE
TE
DP
RO
JE
CT

REPAIR
REPAIRACTIVITIES
ACTIVITIESON
ONTHE
THE28"
28"RAW
RAWGAS
GASTRUNKLINE
TRUNKLINE
Client:
AGIP
KCO
NV
Client:
AGIP KCO NV
Main
Contractor:
KCOI
Main Contractor:
KCOI
Project:
Kashagan
Project:
KashaganExperimental
ExperimentalProgram
Program
Location:
North-East
area
of
the
Kazakhstan
Location:
North-East area of the KazakhstanSector
Sectorof
ofthe
theCaspian
CaspianSea,
Sea,Atyrau
Atyrau
Descrition:
CONTRACTOR scope consists in all the activities
necessary to repair the Raw Gas Trunkline
replacing the failed sections with new pipe
sections and perform welding.

Contract Award : January 2014


Delivery Date:
May 2014 - base Scope
Type of Contract: Preliminaries LS and unit
rates
epC Contract:
Construction engineering,
Procurement, Construction,
Welding, Mechanical Completion

Completed Projects
CO
MP
LET
ED
PR
OJE
C

OFFSHORE
OFFSHOREMECHANICAL
MECHANICALHOOK
HOOKUP
UP
Client:
AGIP
KCO
NV
Client:
AGIP KCO NV
Main
Contractor:
Main Contractor: Saipem
SaipemS.p.A
S.p.A
Project:
Kashagan
Project:
KashaganExperimental
ExperimentalProgram
Program
Location:
North
Caspian
Sea,
Kazakhstan
Location:
North Caspian Sea, KazakhstanSector,
Sector,Island
IslandDD(Hub
(Hub1)
1)
Contracting
Entity:
KCOI
Contracting Entity: KCOI
Preliminary data:
700.000 direct mhrs ( 350 workers and 60
indirects)
Descrition:
Structures, equipment, piping, painting, PFP,
insulation hook up works on Island D. Full
responsability , management and execution of
construction for Non-Process Buildings, Logistic
Support and Train 1 Bridges Areas.
Carry over, modifications and compeltion works in
other Island D Areas.
Contract Award : May 2011
Delivery Date:
July 2012 - Base Scope
Type of Contract: Preliminaries LS and unit rates
epC Contract:
Construction engineering,
Procurement of installation materials
Construction, Mechanical Completion
Assistance to Pre-Comm & Commissioning

Completed Projects
OFFSHORE
OFFSHOREELECTRICAL,
ELECTRICAL,INSTRUMENTAL
INSTRUMENTAL&&TELECOM
TELECOMHOOK-UP
HOOK-UP
Client:
AGIP
KCO
NV
Client:
AGIP KCO NV
Main
Contractor:
Tozzi
Main Contractor:
TozziKazakhstan
Kazakhstan/ /KCOI
KCOIpartnership
partnershipde
defacto
facto
Project:
Kashagan
Experimental
Program
Project:
Kashagan Experimental Program
Location:
North
Location:
NorthCaspian
CaspianSea,
Sea,Kazakhstan
KazakhstanSector,
Sector,Island
IslandDD(Hub
(Hub1)
1)
Contracting
Entity:
KCOI
Contracting Entity: KCOI
Preliminary data:
1.000.000 direct mhrs ( 450 workers and
110 indirects)
Descrition:
Electrical, Instrumentation and Telecom hook up
works on Island D including major cables pulling
and terminations.
Carry over , modifications and completion works.
Contract Award : May 2011
Delivery Date:
August 2012 for Base Scope
Type of Contract: Preliminaries LS and unit
rates
epC Contract:
Construction engineering,
Procurement of installation materials
Construciton, Mechanical Completion
Assistance
to
Pre-Comm
&
Commissioning

CO
MP
LET
ED
PR
OJ E
CT

Completed Projects
Fixed
FixedSkid
SkidMounted
MountedPig
PigLaunchers
Launchers/Receivers
/Receivers
Client:
Maersk
Client:
MaerskOil
OilKazakhstan
Kazakhstan
Location:
Dunga
Field
Development
Location:
Dunga Field Development
Contracting
Entity:
Contracting Entity: KCOI
KCOI

CO
MP
LET
ED
PR
OJ E
CT

Date of Contract Award:


May 2012
Type of Contract:
Turn Key
Duration : 1 year

Scope of Work description:


Engineering, Design and Construction
Engineering carried out in Ravenna
HQ
Procurement in Both Ravenna &
Aktau
Fabrication & Erection
Hydro-Testing and Commissioning
Delivery to FIELD

Completed Projects

CO
MP
MODIFICATION
OF
LIVING
QUARTER
BARGE
TO
TEMPORARY
REFUGE
LET
MODIFICATION OF LIVING QUARTER BARGE TO TEMPORARY REFUGE
ED
Final
AGIP
FinalClient:
Client:
AGIPKCO
KCO
PR
Location:
North
Location:
NorthCaspian
CaspianSea,
Sea,Kazakhstan
KazakhstanSector,
Sector,Atyrau
Atyrau
OJ E
Main
CASPIAN
MainContractor:
Contractor:
CASPIANOCEAN
OCEANLLP
LLP
Contracting
CT
ContractingEntity:
Entity: KCOI
KCOI
Date of Contract Award:
July 2012
Type of Contract:
Conversion
Duration : 9 months

Scope of Work description:


Offshore & Onshore Commissioning
Assistance
provision of commissioning
personnel
procurement services
testing & repair services
finishing/modifications works

Completed Projects

CO
MP
PIPELINE
PIPELINEOIL
OIL&&GAS
GASTRAPS
TRAPSSKIDS
SKIDSFOR
FOREPC
EPC2,3,4
2,3,4AND
ANDFFD
FFD
LET
ENGINEERING,
ENGINEERING,PROCUREMENT
PROCUREMENTAND
ANDFABRICATION
FABRICATIONACTIVITIES
ACTIVITIES
ED
Client:
AGIP
KCO
NV
Client:
AGIP KCO NV
P
Project:
Kashagan
Experimental
Program
RO
Project:
Kashagan Experimental Program
Location:
North
JEC
Location:
NorthCaspian
CaspianSea,
Sea,Kazakhstan
KazakhstanSector,
Sector,Temir
TemirAt
AtYard
Yard
Main
Contractor:
KCOI
T
Main Contractor:
KCOI
Preliminary data
Weight: approx. 800 tons
Description:
- Nr. 8 offshore traps skids (and associated
piping, instrumentation and electrical
equipment and wiring)

Date
of
Contract
Award:
May 2010
Type of Contract:
Preliminaries LS, P&C at
Unit Rate
EPC CONTRACT:
Procurement, Fabrication,
Testing, Load-out,
Sea-fastening and
Certification.

Completed Projects
Mooring
Mooringand
andQuay
Quayrental
rental
Client:
Cashman
Client:
CashmanCaspian
CaspianLLP
LLP
Location:
KCOI
Yard
Location:
KCOI Yard
Contracting
Entity:
Contracting Entity: KCOI
KCOILLP
LLP

CO
MP
LET
ED
PR
OJ E
CT

Date of Contract Award:


November 2012
Type of Contract:
Mooring and Rental of Quay
Duration : 5 month

Scope of Work description:


Mooring services
Logistics Support
Warehousing
Canteen for Crew
Minor Fabrication works

Completed Projects
Marine
MarineLogistics
Logistics
Client:
Caspian
Client:
CaspianOffshore
OffshoreConstruction
ConstructionLLP
LLP
Location:
KCOI
Yard
Location:
KCOI Yard
Contracting
Entity:
Contracting Entity: KCOI
KCOILLP
LLP

CO
MP
LET
ED
PR
OJ E
CT

Period of Contract:
April December 2012
Type of Contract:
Marine operations
Duration : 9 month

Scope of Work description:


Mooring services;
Vessel loading/unloading;
Waste Discharge.

References executed in Caspian Area


Modules, Packages
& Barges

Piperacks - 5.000 tons,


Astrakan (Russia)

Piperacks - 3.500 tons, Kuryk


(RoK)

Infill Decks 1.900


tons - Kuryk
Barge TB95, Astrakhan
(Russia)

References for Kashagan


Modules, Packages &
Barges

Production Manifolds - 6.100 tons


Karligash

Detailed Referen
ces

Temporary Utility Barge 1800 tons

The End
Thank you for your
attention!
Our contacts:
Legal Address: 130000 Microdistrict 29A,
Grand Nur Plaza Business Centre 3rd floor,
Aktau city, Republic of Kazakhstan
Tel: +7 (7292) 425 400
Email: info@kcoi.kz, commercial@kcoi.kz
Website: www.kcoi.kz