RWE NPower All Hands Meeting

Team Update

2011 IBM Corporation

IBM Mgt Team Meeting

Agenda:
Intro
Delivery Update
Hotspots
Gains
12.C2
13.C1

GW
HB
RM
HB
DC
AG

2011 IBM Corporation

2012 Atlas Release Plan On A Page


2012

Jan
Migrations

Feb
MT2

Mar

Apr
MT3

May

Jul

Jun

Aug

MT4
MT4
06/06
1.0M
06/06

10/04
1.0M

20/02
0.5M

2013

90K
Maintenance
Releases

12.M1
22/01

Gains
Npower.com

12.M2

12.M3

04/03

28/03

12.M4

24/04

12.M6

12.M5

27/06

16/05

12.M6

Sep

Oct

Nov

Dec

MT5

MT7

MT8*

27/08
1.0m
-1.25m

22/10
1.0M

19/11
1.0M

12.M8

12.M9

12.M7

05/09

25/07

17/10

Jan

21/11

Npower.com Go Live
Bus Sim
Test 22/01

Sales Pilot

Hotspot
RFCs

11/06

Sales Ramp up w/c 12/03

Gains full roll out

Define
Build, test & Implement

Release
12.C2

Blueprint

Detailed Design
Complete 13/07

Detailed Design

Integration Test
Complete Smart
Enabled 31/12

Build & Unit Test


Complete 12/10

Build & Unit Test


Test

UAT
Blueprint

Release
13.C1

AMS

IA Discovery
Comercials / Contract
Contract
sign

MPANs &
Greendeal

R12.C2 Go-Live
28/01

Transition
17/08

23/11
Blueprint

IA Discovery

AMS
commence

Atlas Migration T6 Timeline 23-28th August 2012


SAP Manual Config Pre
Selection
Pre-selection

BI Load Phase 1
Fin rec Pre

Extract

BI Load Phase 2
Transform

Load & Replicate


Verification

Wed 22nd &


earlier

Pre-selection
Npower.com
extract / load
Control Point
CP0a

Thurs 23rd

Restore
EPPS/PPMS to
Extract box
Restore IB/CPD to
Extract box
IB Ring fenced
balances report
Ring fence preselected sites
Control Point
CP0b
P-marker
exclusions
Site/Account
Selection
Extract (underway)

Fri 24th

Extract

Sat 25th

Transform
Control Points
1/2/3, 4/5
Financial
Reconciliation
(Pre) SAP
SAP IS/U CRM
backup (Off-line
Pre)
Configs for data
migration
Pre-load
transports
SAP Load (IS/U)
Replication (IS/U>CRM)

Sun 26th

SAP Load (IS/U)


& Replicate ongoing

SAP System backup (Pre)


KEY:
Complete
On target
At risk
Slipped
Now

Mon 27th

IS/U financial
verification (Post)
CIB financial
verification (Post)
Verify systems post
migration IS/U & CRM
Manual migration
tasks config. & SAP
batch jobs
SAP IS/U CRM
backup (Off-line
Post)Ring-fence
#1,#2,#3,#4
Control Points 6,7,8
SAP BI Load Phase 1
BI financial
verification (Post)
SAP BI Load Phase 2
Tallyman Load
Manual data updates
(business)
npower.com extract
(RFC1427 delta)
Business Verification
ARIB meeting (xx:00)

SAP System backup


(ISU/CRM)

Tues 28th & later

BI CCC
verification
(Post)
SAP BI backup
(Off-line Post)
MIA Extract
MIA Load

SAP System
backup (BI)

IBM Mgt Team Meeting

Agenda:
Intro
Delivery Update
Hotspots
Gains
12.C2
13.C1

GW
HB
RM
AA
DC
AG

2011 IBM Corporation

GCW

Hot Spots Summary

Key:
Grey Complete
Red Delivery Plan reforecast required
Amber Delivery Plan at risk
Green Delivery Plan on track

RWE npower 01/18/17

PAGE 6

RFC Assignment Process


IA Complete and
Commercialised

Soft booking of
RFC Team
resource on
Booking sheet with

RFC Approved

Matt Brandon
Work at Risk (IBM
Pre Contract Work
PCW) approval
gained and Code
created

Workstream Lead
informed and Code
provided with
updated RFC
Tracker

Confirm
assignment on
Booking Sheet
(Matt Brandon)

Individual
consultant
informed of
assignment, Code
and budgeted days

RFC Tracker
updated with actual
resource
assignment and
forecast days

Weekly forecast
update on RFC
Tracker and check
against Budget
(Queries: Rachel)

Workstream Lead

Commercial Team

RWE npower 01/18/17

PAGE 7

IBM Mgt Team Meeting

Agenda:
Intro
Delivery Update
Hotspots
Gains
12.C2
13.C1

GW
HB
RM
HB
DC
AG

2011 IBM Corporation

Objective of Gate 1
> To agree mitigation of Gains BI Interim solution
> To confirm re-alignment of sales to STS and Telesales
> To validate business is ready to take these volumes

RWE npower 01/18/17

PAGE 9

Current Volumes

RWE npower 01/18/17

PAGE 10

Defect Plan to Support Ramp Up

RWE npower 01/18/17

PAGE 11

IBM Mgt Team Meeting

Agenda:
Intro
Delivery Update
Hotspots
Gains
12.C2
13.C1

12

GW
HB
RM
AA
DC
AG

2011 IBM Corporation

Current focus and challenges of R12.C2


Current challenges
Facing a 3 week slippage to baseline project schedule through a delay in provision of working SAP
Development environments originally due on 9/7
ISU development started on 19/7 with EHP/SPS issues still to be fixed
CRM issue with web client fixed 7/8, development likely to start 13/8
Alignment of R12.C2 Plan against Smart Programme activities (e.g. Foundation Communications,
Deployment, Meter selection, Smart Model Office) which continue to move into the future
Achievements
27 SAP Functional Specifications for original scope completed, reviewed and approved on schedule
to finalise remaining 7 under RfC
Good progress on ISU configuration, development and retrofit since environment has been available
Good progress on MDMS configuration and unit test, developments due to arrive next week to date
this activity has not been impacted by SAP environment slippage
Current focus
Minimise impact of Development environment issue re-planning at development object level to
understand impact on each testing phase of delayed SAP build
Prepare for testing phases identifying scenarios, scripting, detailed dependency planning
Engage with Smart programme to support alignment of future activities

13

2011 IBM Corporation

Atlas 12.C2 (Delivery Plan on a Page)


2012

Jan
Blueprint

3/1

Feb

Mar

Apr

May

Jun

2013

Jul

Aug

Sept

Oct

Dec

Nov

Jan

Blueprint
30/3
31/1

19/3

Workshops

Blueprint
Complete 13/4
Detailed Design

2/4

29/06
Detailed Design
Complete 13/7

Detailed Design

Build & Unit Test

2/7

28/09
Build & Unit Test

Build & Unit Test


Complete 12/10
Integration Test
Complete 31/12

Testing

19/10
1/8

Functional Unit Test/Link Test


1/10

Integration Test
17/12
17/12

14/12

18/1

UA Test
Regression Test

18/1
Go-Live

Go Live 28/1

25/1
17/12

14

Final Prepn

2011 IBM Corporation

Potential Slippage of R12.C2 Against Baseline Plan

15

2011 IBM Corporation

12.C2 Key RAID Items

29/06/12

Stephen Bradley

R39849
16

Organisation
High-level design of the Smart Model
Design - Smart Office has not yet been defined which
Model Office
presents a risk to solution design,
resulting in a requirement for the Release
to raise assumptions on the scope and
capabilities of the Smart Model Office.

To be assessed alongside
WRICEF V1.1 review

Risk to delivery schedule

Closely monitor with DA

Solution design will be based on


approved assumptions, but
there is a risk of re-design work
and potential delivery impact if
the Smart Model Office
composition is different to the
assumptions made by the
Release.

Any change to TOR for Smart


Model Office could impact
requirements. Current position
is that all assumptions made
in 12.C2 relating to Smart
Model Office have been
approved in Design Authority

30/06/12

Known - RCoA and Deployment

Action

Risk to delivery schedule


09/07/12

There is a risk that new requirements


and/or the original capabilities which are
currently out of scope may be raised as
RFCs.

Target Resolution

Changing
Scope

Impact

R39205

There is an issue that the Development


Environment is not available for
development until the 09/07/12 when the
current plan was expecting it to be
available on 02/07/12

Stephen Bradley Stephen Bradley

I39855

Detail Design
Development
Environment

Probability

Description

Owner

Ref

Title

Business Impact

2011 IBM Corporation

IBM Mgt Team Meeting

Agenda:
Intro
Delivery Update
Hotspots
Gains
12.C2
13.C1

17

GW
HB
RM
AA
DC
AG

2011 IBM Corporation

Status Date: 06/08/12

Atlas 13.C1 Pre-Blueprint Plan on a Page


August 2012

Jul 12
30/07

01 Pre Funding Approval

01

06/08

13/08

20/08

September 2012
27/08

03/09

10/09

17/09

24/09

03/08 - Comp

02 Requirements Clarification
02.01 Requirement Clarification Workshops
02.02 Baseline Requirements
02.03 IA Clarifications

02

17/08

02.04 Prioritisation

03 Business Change Impact Assessment


03

31/08

04 Technical Impact Assessment (WRICEF)


04.01 Draft WRICEF Catalogue & IA
04.02 Review and baseline
04

07/09

05 Project Plan
05

31/08

06 Full Cost Model


06.01 IBM Quote
06.02 RWEIT Estimate
06.03 Business Cost Model

07 Next Phase Funding

06

06/09

06

06/09

06

06/09

07.01 Write and submit scheme paper


07.01 Scheme paper approved

08 Next Phase Mobilisation

18

07

07/09

25/09
08
29/09
09

2011 IBM Corporation

Atlas 13.C1 Pre-Blueprint Scope


Sr
No.

Capability

Bulk job creation


1

Linking of dual fuel jobs


2

Consents - data access & privacy


3

BSCP Remote Reading Settlement


4

Discontinuing pedestrian meter readings


5

Interoperability
6
19

Capability description

Owner

Develop the capability to process a bulk load file of metering jobs and book
these jobs in the system. Booking of the job includes communications with
industry agents, management of the JBB interface implications and triggering
of appointment correspondent
Develop the capability to link dual fuel jobs within the Atlas system. This will
allow for identification of related jobs (e.g. electricity smart meter install and
gas smart meter install) which will be completed by a meter worker in a single
visit to the
Enhance the current consent capability delivered by 12.C2 to meet the known
regulatory requirements for managing the capture and maintenance of
customer consent for the use of smart metering data.
Baseline requirements are documented in '13C1 Requirement
Amend the existing 12.C2 capability for providing reads retrieved remotely from
smart meters to the DC for inclusion in settlement. To comply with BSCP 504,
remotely obtained meter readings must be provided to the DC at least every 90
days
Develop the capability to set up electricity smart metering installations on a
Data Processing (DP) contract rather than a Data Collector (DC) contract and
to suppress the appointment of a Meter Reading Agent (MRA) for gas smart
metering installations.
Develop the capability to allow npower to operate compliant smart meters that
have been installed by other suppliers and gained by npower as smart meters.
There should be no difference in capability for an npower deployed smart meter
and a gained smart me

IBM

IBM

IBM

IBM

IBM

IBM

2011 IBM Corporation

Atlas 13.C1 Pre-Blueprint Scope

Sr
No.

Capability

Credit vetting
7

Complex metering
8

2012 - ITPRO - Ecommerce : Improved Sales


& Online Account Management Applications
9

Product proposal
10

ecommerce Enhanced Mobile Capability 250k


11

20

Capability description

Owner

Develop the capability to support sharing of customer data with Experian for
the purposes of supporting credit scoring capability (CAIS and predelinquency) and develop the capability to handle security deposits obtained
from customers within the Atlas
npower has c. 50k Complex Metering sites which are currently supported in
the IB billing system. Due to the structure of the tariffs and on-site metering
set-up it is not currently possible to support these customers in the current
Atlas release

IBM

IBM

Develop the capability to support the gains, product change and direct debit
sign up journeys online through npower.com.
Baseline requirements are documented in 'Project HECTOR Requirements
V1.0'.
Develop the capability to enable product proposal to support compliant and
consistent journey and experience across existing serviced and future self
serve channels, with express reference to the synergies to be achieved with
Project Hector. 13.C1 will f

RWE IT

RWE IT

Develop a suite of capabilities to support the provision of npower.com through


the mobile channel.
The best available view of requirements is documented in 'RE Re Mobile.rtf'.

RWE IT

2011 IBM Corporation