STRUCTURES
-PROJECT-
REFERENCES
i.
ii.
v.
vi.
vii. Proiectarea structurilor de beton dup SR EN 1992-1-1, Traian One, Zoltan Kiss,
2008
PROJECT FORMAT
i.
ii.
REINFORCED CONCRETE
STRUCTURES
-PROJECT-
Group no:
Student:
3401
IONESCU CONSTANTIN
- YEAR
Project theme
Height level: G + 3F
Placement:
Area 1 Iai
Area 2 Cluj Napoca
Area 3 Bucureti
Area 4 Focani
Area 5 Timioara
Area 6 Ploieti
Area 7 Suceava
Area 8 Bacu
Area 9 Piatra Neam
Area 10 Alba Iulia,
Area 11 Trgu Jiu
Area 12 Constana
Project theme
Floor height: 4 m
Floor dimensions: for ground, 1st and 2nd floor: 3 spans (S)
3 bays (B)
at the 3rd floor:
S = 6 + 0.3A [m]
B = 4 + 0.05n [m]
where n personal number
A area number
1 span (3S)
3 bays (B)
Project theme
Ground, 1st and 2nd floor elements sketch
Project theme
Roof elements sketch
Hydroinsulation weight
ghi = 0.65
[kN/m2]
gsf = hsfrc
[kN/m2]
hsf = 0.07
[m]
rc = 25
[kN/m3]
[m]
bgrt = 0.4
[m]
10
11
[kN/m]
hgr = 3S/20
[m]
Attic weight
ga = baharc
[kN/m]
ha = hgr+0.7
[m]
ba = 0.15 [m]
12
[kN/m2]
gpw = 1
[kN/m2]
Slab weight
gs = hsrc [kN/m2]
hs = 0.12
13
Girders weight
gg = bghgrc
bg = 0.3
Beams weight
Plaster weight
[kN/m]
[m]
gb = bbhbrc
[kN/m]
hb = B/15
bb = 0.2
[m]
gp = hpm
hp = 0.03
[kN/m2]
[m]