QH Talbros Pvt. Ltd.
DRONACHARYA COLLEGE OF
ENGINEERING
PRESENTED BY:
: 8
TRAINING PERIOD: 4 Weeks
2. Declaration
3. Acknowledgement
4. Company profile
5. People
6. Customers
8. Q.A. Department
T h e Tal b r o s G r o u p c o m p a n i e s a r e TS 1 6 9 4 9 a n d I S O
14001 certified. Our team takes the quest for quality
v e r y s e r i o u s l y. F o r e v e r y p i e c e t h a t i s m a n u f a c t u r e d ,
quality standards are strictly adhered to and industry
benchmarks oPen set.
1. R & D DEPARTMENT
2. QUALITY DEPARTMENT
3. PRODUCTION DEPARTMENT
4. I.E DEPARTMENT
Q.A.DEPARTMENT
Receipt inspection
In process inspection
Final inspection
Supplier quality
assurance {SQA}
Total line on the shop floor
Blankin
g
Flatteni
ng Out
lining
Punching
Reactiva
These are
tionthe operation which
are use Corrugat
in the gaskets
according
ionto the die changes.
Standard
room
Calibration:- finding the errors of the
measuring inst. with the help of the
masters.
Layout inspection:- Dimensional
inspection or complete insp. of any
parts.
Revalidation:- To check the parts
which is ok or not ok as the last
part.
Controlling and Monitoring of
equipment:- As per the requirement
the inst is purchase first it is
transfer to the S/R aPer that they will
generate a specific no. and they will
issue to the concern dept.
MEASURING
INSTRUMENT IN
STANDARD ROOM
CMM
PROFILE
PROJECTOR
STANDARD PINS
PROFILE TRACER
VERNIER CALIPER
MICROMETER
HEIGHT GAUGE
CMM:-CORDINATE
MEASURING
MACHINE
Material Handling
Means Providing-
1.Reduce manufacturing
cycle time.
6.Control inventory.
Production Department
1.Internal elements
2.External elements