14th November to 16th December 2016 ACTS Business Cases and Scenarios Implementation CONTENTS
Introduction Objective of Scenario Implementation Business Cases and Scenarios Implementation Outcome Conclusion Introduction
Phase A of the Pilot Testing
The ACTS Business Cases and Scenarios implementation exercise was the core activity of Phase A of the Pilot Stage. Designed to validate the overall system including procedures, processes, integration and inter- operability tests in all ACTS modules from departure, transit and destination offices. Objective of Business Cases and Scenarios Implementation
Scenarios were developed to reflect the
processes that would be needed to operate the ACTS system on a live basis. Ensure the procedures, processes and exchange of electronic messages as set out in the ACTS system can be effectively and efficiently applied from point of departure, through transit and arriving at a point of destination in a simulated live situation. Ensure the successful exchange of electronic messages, related procedures and processes as agreed by AMS. Business Cases and Scenarios Implemented
A total of 21 scenarios were
developed to test the system. These Scenarios were combined into 21 Business Cases to capture the majority of the possible variations of the processes and procedures in the ACTS. 4 weeks starting 14th of November 2016 and ending on 16th December 2016. Regional Orchestrator and the ACTS Implementation Team based in ASEC and coordinated by National Orchestrators based in the national capitals of participating AMS. Daily Log Reports. The log report captured the implementation process and highlighted any issues arising and weather the Business Case/s implemented for the day was completed successfully or otherwise. Business Cases and Scenarios Implemented These reports were shared with all and the National Orchestrators and team in ASEC to record the issues and resolve any outstanding issues immediately or after consultation with the relevant stakeholders. An outcome of this daily reporting is the Jira (software to track issues, and bugs related to software) report created to capture issues that needed to be addressed by ACTS Implementation team. Outcome
All the Business Cases (BC) and Business
Scenarios (BS) were implemented as planned. However due some technical challenges some BCs were not completed and this has been recorded in the Jira report to be addressed by implementation team. Main Outcomes Log Report on the Implementation of Business Cases; Validation of the processes and procedures; Identification of bugs in the system; Identification of process related issues at national level; Identification of capacity needs at the national level Outcome
Identification of possible network
communication issues; Addressing administrative issues including registration of traders and redesigning of related documents; Provided an avenue for participating AMS to familiarize their CA team on the actual exchange of electronic messages in the ACTS at the relevant points; Provided a platform for the participating AMS to test their hardware installed with the ACTS. Conclusion
The outcome and results of the exercise
will be the basis for immediate issue resolution, improvements and future long term enhancements to the ACTS. These exercises will be continued if there is a necessity to further validate the system before the parallel run and the proposed live rollout at a later stage. Phase A is completed and set the stage for Phase B Thank You