Sie sind auf Seite 1von 2

3G Roll-out Optimization

SHO Overhead Optimization Guideline


1. Cells with SHO OH
>50%
2. Cells with TP >
START ISD > 20%
3. Check cells DT
E tilt <
Y
Perform RET
(1) Maximum mechanical tilt based on height and
ISD
max
coverage
Check Y
Overshooti
N
MOD
ng cells
(3) 1BPS Y INTRARELTHDFOR1BP
>8 OR S =8
1APS >4 INTRARELTHDFOR1AP (2) Rule 1,2 and 3 can have exemption for case
N S=4 where target coverage is in conflict with the rules.
N
Antenna Re-azimuth (3) Modifying SHO parameters should make CCSR
Y
face to >=10 (3) Y PS and CCSR CS still pass the OSS KPI target.
Rule1 TRIGTIME1
MOD
face with difference with TRIGTIME1B=320
neighbor neighbor B>320 (4) This guideline applies for SHO overhead
optimization, bad spot coverage optimization
N N
(specially due to pilot pollution) will have to be
(1)M tilt < Y fixed first or in parallel.
Re-azimuth Perform mechanical (5) 3G new sites with site level SHO OH pass
Overlap Y max based
>=10 down tilt target, but with at least 1 sector having
Rule2 opposite ISD/height
difference with
neighbor
neighbor N Target SHO OH < Actual SHO OH <60%
Neighbor 43% < 55% < 60%
N overshooti Y Perform neighbor
ng
optimization AND already applied SHO OH guideline above, will
Azimuth ~PRACH
Y be considered for acceptance.
Rule3 between Re-azimuth > >20%
antenna 90 difference
<=90
Best Effort
Optimization * For non-RET(new site), E tilt and M tilt should go
together.
3G Multi-Sector
Re-Azimuth guideline

More than 10 Rule 1: Opposite Antenna can


not face to face, the minimum
angle of them should more than
10 degrees;

Overlap no opposite More than 10 Rule 2: The overlap can not


opposite, the minimum angle of
them should more than 10
degrees;

Angle between Antennas larger than 90 Rule 3: The angle between 65


antenna and split antenna should be
Less than 90
more than 90 more than 90 degrees between the
split antenna should be more than 100
degree

Das könnte Ihnen auch gefallen