PARK
The development is designed to comply with
National building codes (NBC) and standards.
Floor loading- 400 kg/sqm with designated
areas strengthened to 1000 kg/sqm
Floor to floor- 4,05 mts
Floor screeding- Average 65 mm thick ips flooring
shall be provided in all office areas
Column grid- 10.8x10.8 c/c
Power- The development has a 66 kv substation
which recieves power supply from dual feeders
Power backup 100% power backup
through through DG sets
HVAC- The development is designed to have
centralized air conditioning system through
a combination of air cooled chillers and
water cooled chillers designed to provide an
ambient temperature of 22degree celcius+/-
2 degree celcius
Severage system The development shall
have an underground sewage treatment
plant and the treated water shall be used for
cooling ,landscaping and flushing purpose
Fire fighting and supression system- A
sper local fire regulations comprising of
sprinkler system ,fire hydrants, hose reels,
Faade Building faade shall be a
combination of double glazing ACP stone
cladding and masonry with plastering and
textured paints
Toilet finishes
Flooring vitrified tiles
Dadoing- combination of ceramic tiles
Ceiling- metallic grid fall ceiling
Common area finishes
Lobbies granite / artificial marble
Main staircase kotah stone/ granite
Rainwater harvesting- Provision for the
same has been made as per MOEF clearance
There are three building for workspaces
There is one MLCP
There is a common basement to all three
buildings
Ground coverage
Valence-3382
Velocity-3149
Vector-3149
MLCP-3382
Built Open-50:50
Entry/Exit to basement-4
900 cars Can be accomodated in MLCP
The office space can be modified as per
the occupant
Every floor may have a pantry or cafetaria
as wished by the occupant
1. Organizational principle
. Clustered organization
. 3 buildings for the workspaces and MLCP
clustered in the site
2. Built mass strategy
. Single building mass
3. Public Private distribution
. Layered with gradation from public to
private
. The entry to the campus is semipublic.Not
everyone can visit .Only staff people with
permission can enter.
. In the office building only ground floor is
assesible as common space or lobby for
And semi public within the occupants
4. Access/ approach
(pedestrian)
Multiple access cleanly defined
5. Vehicular entry and
circulation
Same entry and exit
Combined with pedestrian
One main entry/exit and 2 other entry/ exit
Approximately 300 people can
accommodate per floor
Area per person 7.4 mtsq/ person
There are 30 luxurious villas that are
BHIKAJI CAMA