Key tasks of the job

include
managing parts of construction projects
overseeing building work
undertaking surveys
setting out sites and organizing facilities
supervising contracted staff
ensuring projects meet agreed
specifications, budgets or timescales
liaisingwith clients, subcontractors and other
professional staff
checking and preparing site reports, designs
and drawings
providing technical advice
problem solving
ordering and negotiating the price of materials
ensuring site safety
Summarizes the site
engineer tasks are as
:follows

a review of executive maps for business


and assigned to be implemented .

thework of many multiple previews to


show the limits of its location.
good planning and division of work in site.
locating equipment , raw materials and
places the site administrators.
choose to work with all the team and
accuracy care .
setting the timetable for the completion of
the business .
check and review the measurement before
relying .
Part 2

At the site we was training how to take over


the concrete and steel bars and counting the
bars as the draw of building also he saw the
tests of concrete like slump test.
I have participated in the receipt of
the reinforcement works for
building foundations and to know
to what extent the reinforcement
matches with the approved
drawings and the receipt steps of
reinforcement works can be
mentioned as follows :
Ensure rebar is clean and non-existence of
rebar corrosion.

Review type, diameters, number and


length of the rebar.

Ensure the placement of reinforcement is


similar to the approved drawings.
Review location of dowels and check if it
tied with stirrups.

Review diameters, number and length of


columns dowels.

Make sure that the reinforcement is


interlinked
:Training steps
1- fixed the steel bars for columns :

At this stage the steel man cut the bars according


structural drawing .the bar length is 12 m. for
stirrups we used 8 mm bar diameter.

2- Isolated the ground beams :

By using 2 layers from bitumen we can make


complete isolated for ground beams.
3- Pouring bottom slab for septic
tank

The slab thickness is 10 cm and we used 12 m3


from concrete type (SRC)

4- Close 4 sides for columns :

At this stage the carpenter cut the wood according


structural drawing.
5- Check for columns support :

We must put steel support around the column to keep


the dimension of columns .

6- Pouring concrete for ground floor


columns :

At this stage the carpenter pouring concrete for


columns by using pump the total height for pump is 45
meter.
7- Remove wood from wall :

After 3 days we removed the wood from wall


and columns and start curing for concrete.

8- Curing for columns :

At this stage we spray water 3times every day


to keep the water in concrete mix.

9- Start work at ceiling slab :
At this step in the first we distributed the wood in both
directions.

10- Curing the water tank


We submerged tank by water to keep it from
shrinkage cracks.

11- Finishing work for slab


We are finished all work for ceiling like the
reinforcement and block.