MHV CHECK LIST VENTILATION LAYOUT
DUCTS ARE NOT CLASHING WITH WALLS(PARALLEL) OTHER THAN WHERE THERE ARE
PERPENDICULAR PENETRATIONS.
DUCTS SHALL BE UNDER SLAB AND WITH 100mm CLEARANCE IN ORDER TO PROVIDE SPACE
FOR INSTALLATION.
DUCT WIDTH IN SPACE B/W SLAB &
mm DUCT IN mm
150 450 50
500 1200 100
1250 1800 150
1800 - 2400 300
2400 & Above 400
SHAFT DUCT INLET AND OUTLETS ARE MATCHING WITH SHAFT DUCT POSITION,
IN ORDER TO INSTALL VIBRATION ISOLATORS MIN 300mm GAP IS LEFT BETWEEN TOP OF
THE CEILING MOUNTED EQUIPMENT AND CEILING/BEAM WHICHEVER IS CLOSER TO
EQUIPMENT.
DUCTS ARE MODELLED TO HAVE MIN 50mm CLEARANCE TO ANY OTHER SERVICES AT
ALL FD SHALL HAVE PERMANENT ACCESS DOOR IN DUCT AS WELL AS IN FALSE CEILING.
TEMPORARY ACCESS DOOR IN THE FALSE CEILING(PoP) FOR VOLUME CONTROL DAMPERS
(DURING COMMISSIOING).
AUXILIARY DRAIN PAN IS MODELLED BELOW CEILING TYPE FCU/BCU/CRAC IN IT & ELECTRICAL
ROOMS
ANY SERVICES WHICH IS PASSING THE DOOR SHALL BE 300MM ABOVE THE DOORS AND
400MM AWAY FROM SIDE OF THE DOORS TO AVOID CLASH WITH LINTEL.
REFERENCE DIMENSION W.R.T NEAREST GRID OR COLOUMN IS GIVEN FOR THE DUCTS
DOOR GRILL OR DOOR UNDERCUT AVAILABILITY IN TOILET .
SUPPLY & RETURN AIR TERMINAL LOCATION TO AVOID SHORT CIRCUIT OF AIR
MD,MFD, MSFD AND SENSOR ELECTRICAL CONNECTION AND BMS/FIRE SYSTEM INTEGRATION.
UPE DUCT OPENING AND LOCATION COORDINATION WITH CIVIL MODEL (12 Nos. WITH AREA
0.40m2 EACH)
OTE DUCT TO HAVE 24 NOS. OPENINGS AT 0.80m2 EACH (TYPICAL DIMENSION OF 895 mm x
DUCT LINER INSULATION (25 mm THICKNESS FIBER BOARD, DENSITY 48 kg/m OR APPROVED
MATERIAL/THICKNESS) MAX UP TO 3 M FROM THE AHU/FAHU
THE DUCTWORK SHALL BE SIZED TO ALLOW FOR THE THICKNESS OF THE DUCT LINING
ROOF AND PLANT ROOM DUCT TO BE CLADDED WITH APPROVED MATERIAL (LENZING
JACKETING) BIM / SITE
ENSURE THE ROOF DUCT ENTERING INTO SHAFT SLOPED UPWARDS IN ORDER TO PREVENT
THE RAIN WATER STAGNATION
FIRE RATED DUCT SUPPORT DISTANCE SHOULD NOT EXCEED MORE THAN 1500mm
MSFD TO BE PROVIDED IN BOH TO FOH CROSSING DUCT IF IT IS NOT FIRE RATED DUCT
EQUIPMENT TAGS SHOULD BE FOLLOWED AS PER WP DESIGN ANY MISSING TAGS SHALL BE
SEPARATELY TAGGED.
MHV CHECK LIST CHILLED WATER LAYOUT
COMMISSIONING VALVES ARE LOCATED AT EACH MAIN BRANCH AND CONNECTION TO EACH
PLANT ROOM.
DRAIN VALVE LOCATED AT THE BOTTOM OF RISER WITH SHUT OFF VALVE ALONG WITH DRAIN
PIPE CONNECTED TO NEAREST DRAIN POINT.
LEAVE 2D STRAIGHT PIPE BEFORE BALACING VALVE/ORIFICE PLATE AND 5D STRAIGHT PIPE
AFTER
SHAFT PIPE INLET AND OUTLETS ARE MATCHING WITH SHAFT PIPE POSITION, PIPE POSITION
INSIDE THE SHAFT IN ABOVE AND BELOW LEVEL.
PIPES ARE NOT PENETRATING THE WALL WHILE PARALLEL TO WALL. THEY JUST CROSS THE
WALL BY PENETRATING IT PERPENDICULAR
MHV CHECK LIST CHILLED WATER LAYOUT
AUTOMATIC AIR VENTS ARE PROVIDED AT HIGHEST POINTS OF PIPE LINE WHERE REQ IN MECH
EQUIPMENT ROOMS AND UTILITY ROOMS, MANUAL AIR VENTS ARE PROVIDED AT HIGHEST
POINTS OF PIPE LINE WHERE REQ IN OTHER PLACES
DRAIN PIPES ARE INDIRECTLY (WITH FUNNEL FLOOR DRAIN) CONNECTED TO DRAINAGE
SYSTEM FOR AHU/FAHU
CONDENSATE PIPING DROP LOCATION TO BE VERIFIED WITH DRAINGE MODELS IN WHICH THE
LOCATION OF THE FLOOR DRAIN IS VERIFIED.
MHV CHECK LIST CHILLED WATER LAYOUT
LEVEL OF ALL CHW SUPPLY/RETURN & REFRIGERANT PIPE WITH FLOW RATE SHOULD BE
PROVIDED.
REFERENCE DIMENSION W.R.T NEAREST GRID OR COLOUMN IS GIVEN FOR THE PIPES
AIR HANDLING UNIT ( AHU, FCU,FAHU,CRAC) UNIT COIL CONNECTION AS PER STANDARD
DRAWING.
SUPPORT FOR HORIZONTAL & VERTICAL PIPES AS PER STANDARD DETAIL DRAWING
REDUCER IN ALL VERTICAL PIPE WORK SHALL BE CONCENTRIC & FOR OTHER POSITION
ECENTRIC.
CHW PIPE UPTO 50 MM WILL HAVE SCREW CONNECTION AND 65MM AND ABOVE WILL HAVE
FLANGE/GROOVED CONNECTION.