Beruflich Dokumente
Kultur Dokumente
Infinture Modulschulung CO
Essen, 22.03.17
Welcome
AGENDA Master Data
Planning Functionality
Planning Overview
Excel Integrated Planning / Manual Planning
Plan Allocations
Other Planning Functionality
Actual Functionality
Transactional Postings
Actual Allocations
Other Actual Functionality
Reporting
Master Data Reports
Line Item Reports
Important Standard Reports
1) Enter TC KS01
2) Enter of cost center
3) Enter Valid From (should be
beginning of 1st year in which CC
is used
4) Enter Valid To 31.12.9999
5) In case you would like to create
the cost cost center according to
settings of an existing cost center,
you can enter the reference cost
center. All fields will be defaulted
from reference CC.
6) Press Enter
1) Enter TC KS02
2) Enter Cost Center Number
3) Press ENTER
4) Change the fields that need to be
changed (some fields can only be
changes as long as no data was
posted to the cost center,
otherwise an error message will
appear)
5) Press Save
Remark:
KS03: Display Cost Center
KS04: Delete Cost Center
Country Level
Company Level
Function Level
Sub-Function Level
Cost Centers
Create: KSH1
Cost Centers Group Change: KSH2
Display: KSH3
Create: KOH1
Internal Order Group Change: KOH2
Display: KOH3
Create: KBH1
Statistical Key
Change: KBH2
Figures Group
Display: KBH3
Create: KAH1
Cost Element Group
Change: KAH2
Display: KAH3
Create: KLH1
Activity Types Group Change: KLH2
Display: KLH3
The order type contains all control parameters regarding settlement, number
ranges, visible fields, etc.
Order Types at GFKL:
Portfolios
Projects AG
Projects OpCo n
Naming Convention for order type:
1 0 1 A
A=Portfolio
Company ID B= Project
Number range:
Order Type Number from Number to E/I Remark
xxxA 1010000000 1010099999 I RM Portfolio No. is equal to SAP order number
xxxB 1019000000 1019099999 I System provides number from interval when order is saved
S 0 0 1 0
Constant
1) Enter TC KK01
2) Enter Key of Statistical Keyfigure
according naming convention
3) Press ENTER
4) Enter Description
5) Enter Unit (Mandays = ZMD ; Persons
= ZPR; all others use standard units)
6) Decide if KF is a fixed or Total value
KF
7) Press SAVE
Remark:
KK02 Change Keyfigure
KK03 Display Keyfigure
KK03DEL Delete KF
Remark:
KA02 Change Cost Element
KA03 Display Cost Element
KA04 Delete Cost Element
KA06 Create Second. CE
These Planning Areas are available in cost center accounting, in internla order
accounting only planning of (primary) costs, and planning of statistical
keyfigures is available.
SAP Terminology:
All these planning areas are available within a planner profile. The Planner Profile
for GFKL is ZGFKL and can be chosen with TC KP04.
Cost Planning
Activiy Output
Not applicable
Planning
Statistical Key
Figure Planning
1
Layouts Z-100 to Z-500 can be used for MS Excel integrated planing (Upload of plan data from a file.
6. Save the .xls file in format .txt (Tabs delimited) on your local drive)
Z-100_Primary
Costs
6. Save the .xls file in format .txt (Tabs delimited) on your local drive)
Z-300_Activity
Output
6. Save the .xls file in format .txt (Tabs delimited) on your local drive)
Z-300_ Stat
Keyfigures
6. Save the .xls file in format .txt (Tabs delimited) on your local drive)
Z-400_Orders_Pri
mary Cost
6. Save the .xls file in format .txt (Tabs delimited) on your local drive)
Z-500 Orders_Stat
Keyfigures
For some small changs in planning you might not want to upload a file, in this case, it is as well possible to do manual (non excel integrated planning in SAP.
Steps 1 & 2 in the previous slides remain unchanged
Selection Screen:
3.
Make sure you are in the planning layout that is not excel integrated. You can swich between layouts using the arrow buttons
4.
Enter Version 0, From Period, To Period, Cost Center (or order number) and account (intervall) (or activity type)
5.
Press F5 or the Overview button to get to the Overview Screen
7.
Press Execute when finished in order to upload the data
Overview Screen:
6.
In case planning data already exists, it is displayed
7.
You can enter a new plan value that is updated after saving or you can navigate to period view by marking a line at the left and pressing F6 or the period button
8.
Press F5 or the Overview button to get to the Overview Screen
7.
Press Execute when finished in order to upload the data
Plan allocations are used in order to automatically credit sender cost centers and
debit receiver cost centers based on a set of rules (percentages/rates) which are
defined in so called cycles. Plan Allocations are executed once a year for 12
periods
When you create a cycle you should stick to the following naming convention:
1 0 1 I A 1
Consecutive numbering
A=Actual; P=Plan
Company Code ID
Cycle Header:
Enter a speaking text in the cycle header and make sure the valid to date is far in the future.
By pressing Attach Segment you can enter the next sender / receiver combination with all rules that should be applied for that combination
Cycle Segment-Header:
Specifies
the rule with
which the Only
receivers relevant
should get when
debits receiver rule
is Var.
Portions
On this register you have to enter the sender cost center that you want to allocate, the cost elements that should be allocated from the sender and the
receiver cost centers (single value, range or group)
Here you can limit the selection of sender values to a version: At GFKL only plan / actual version 0 is used
On this screen you have to specify which account (interval or group) you want to base your allocation on in case of variable portion type cost or consumption
In case of variable portion type statistical key figure you have to specify the key of the key figure
Cycle Segment-Header:
Specifies
the rule with
which the
receivers
quantities
should be
dallocated
On this register you have to enter the sender cost center that you want to allocate, the activity type that should be allocated from the sender and the receiver
cost centers (single value, range or group)
On this screen you should not change the default (100 for Factor and 100 for activity). This makes shure, that in case of inversely calculated
sender values, the system calculates the figure directy as posted to the receiver.
On this screen you have to specify which account (interval or group) you want to base your allocation on in case of variable portion type cost or
consumption
In case of variable portion type statistical key figure you have to specify the key of the key figure
From the upcoming basic list you can see if the cycle run was successful. You
can only run cycles in production mode if maximum message category is
warning (warning messages are not unusual).
Press button Sender or Receiver in order to check what will be allocated.
When everything is correct, navigate back till you reach the cycle execution
screen, remove flag Testrun and press the execution button
If you need to reverse a cycle you can go to the execution screen of the cycle,
enter cycle + start date and navigate in the menu
Remark I:
The assignment of cost centers to
splitting structure Z1 is Fiscal
year dependent. This means,
that this step has to be done
befor every planning period
Remark II:
CC Legal, Internal Audit &
Controlling allocate with fixed
price and are not assigned to
the structure
Some cost centers activity prices are not calculated but set manually (Legal,
Internal Audit and Controlling & Risk Management)
Steps to set a price for these activities:
Type of
Transaction Description Usage
reposting
KB61 (enter) With reposting of line items it is possible to
Reposting of
KB63 (display) repost costs posted to a false CO object AG &
line items
KB64 (reverse) (cost center) OpCo
Usage: AG only
A correction of activity allocations from
timewriting could only be necessary in
exceptional cases.
SAP offers usage of transaction KB65
The recommendation is to cancel the
wrong document (KB24N) and
reupload a correct file in TC KB21N.
If reposting should be done with KB65,
the steps are as follows
1. Enter KB65
2. Select the items you want to repost by
doubleclick
3. Enter new receiver quantity and
receiver
4. Press SAVE
In the following slides only differences between actual and plan allocation will be figured out
Actual allocations are used in order to automatically credit sender cost centers
and debit receiver cost centers based on a set of rules (percentages/rates) which
are defined in so called cycles. Actual allocations are executed each month for
the closing period.
At GFKL 3 different types of allocations are used:
What can
Type of Transaction Description be Usage
Allocation
allocated?
KSV5 (Execute) All sender primary cost elements are
Distribution KSV1 (create) credited at the sender & debited to the Primary OpCo
KSV2 (change) receivers with the original primary cost costs
elements only
KSV3 (display)
KSU5 (Execute) All sender primary & secondary cost
Assessment KSU1 (create) elements are credited to the sender/ Primary & AG
debited to receivers with a secondary Seconda
KSU2 (change)
cost element ry costs
KSU3 (display)
KSC5 (Execute) All quantities provided by the sender are
Indirect KSC1 (create) allocated to receivers. With price Quantities AG
Activity calculation the quantities are valuated and
KSC2 (change)
Allocation debits / credits are posted with a
KSC3 (display) secondary cost element
86 berblick Geschftsmodell Strategie Die GFKL-Gruppe Finanzkennzahlen
Differences actual and planning cycles Field Version
Actuals:Timewriting
Only relevant for GFKL AG:
Whenever a cost center is performing
timewriting (specific monitoring of
activities and to which receivers these
activities have been provided) in
actuals, we will
1. Enter TC KSII
2. Flag "Cost Center Group
3. Enter Cost Center Group
4. Enter Period
5. Enter Fiscal Year
6. Do not flag "Execute in Background
7. Flag "Test Run & Detailed List
8. Do not flag "With fixed cost
predistribution
9. Press EXECUTE (F8) to start the test
run
10. Check if prices shown in column
"Total Price" are reasonable
11. Press SAVE or go back, remove test
run flag and reexecute
Report categories:
Master Data
Reports
Selection
Master Data Reports provide an
overview list of existing master data
according to a (pre-)defined selection
Selection
Line Item Reports give an overview on
all single line items to a specific
document selection
CO documents Transaction
Infinture Modulschulung CO
Essen, 22.03.17