System Analysis and Design

MP4710
Design and Analysis of Renewable Energy System
Semester 2, 16/17
By
George Michael Samson
Graham Walwyn
Iftikhar Bokhari
Maha Saif M Alotibi
Paulina Iyaloo Nalitaandele Nuujoma
Project Plan_Meeting 1 : 3rd March
Medical centre was chosen
Bokhari, was chosen to lead the group and decided to do the project management.
Tasks were segregated

A detailed task description was given to individual.


Cont

Draft project plan was proposed.


We decided to look into
Solar thermal
Photovoltaic
Geo thermal
Ground source heat pump
Air source heat pumps
Wind turbines
Tidal power
Wave power
Battery storage systems
Back up/emergency generators
Project Plan_Meeting 2 : 5th March

By Inputs
- Building Size of 900m
Graham Walwyn - Assumed power consumption of 65W/m
- General details were bring gathered
Paulina Nuujoma - No information provided
- MoM
Iftikhar Bokhari
- Draft project plan
Maha Saif M Alotibi - Not available but information was shared
George Samson - No information provided
Basic Layout and Schematics

Source : http://www.nrel.gov/docs/legosti/fy98/25233.pdf
Project Plan_Meeting 3 : 10th March

By Inputs
Graham Walwyn - Same as last meeting
Paulina Nuujoma - Basic outline was produced

- Same as last meeting


Iftikhar Bokhari
- Abstract + Updated project plan
Maha Saif M Alotibi - Same as last meeting
George Samson - Basic outline was produced
Project Plan_Meeting 4 : 12th March

By Inputs
- Outline report with sufficient details, quality,
Graham Walwyn calculations and appropriate references. Added in
the draft report and is subject to minor amendments
Paulina Nuujoma - No update provided since the last meeting
- 3 Schematics and Reliability modelling included in
Iftikhar Bokhari
draft report
Maha Saif M Alotibi - No information provided
- Information produced was very broad and not
George Samson
detailed
Project Plan_Meeting 5 : 17th March

By Inputs
Graham Walwyn - Geo-thermal technology to be added

Paulina Nuujoma - Basic outline for feasibility submitted but needs


more details
Iftikhar Bokhari - Same as last meeting with redundancy modelling
Maha Saif M Alotibi - Same as last meeting

George Samson - Basic partly completed, but team felt more


information needed
Project Plan_Meeting 6 : 19th March

By Inputs
Graham Walwyn - Details discussed in last meeting was added
Paulina Nuujoma - Waiting for cost details from George
Iftikhar Bokhari - Same as last meeting
Maha Saif M Alotibi - Same as last meeting
George Samson - Not available but information was shared
As of Date