METHODE KERJA

PROYEK PEMBANGUNAN GEDUNG BLOK D & E


DP II
RUMAH SAKIT UMUM DAERAH TARAKAN

ADHI KARYA
GENERAL ENGINEERING CONTRACTOR
DIVISI KONSTRUKSI I
OutletTelephone Installation

To IDFT / Key Telephone

Cable
Conduit

In bow dos
Outlet Telp
Cable
Telephone System Diagram

Extension Line

Public Telp. Coin


Junction Box Telkom IDFT Extension Line
Office

MDF IDFT Extension Line


Telephone Travel Agent - 1 Direct Line

IDFT
grounding Travel Agent - 2 Direct Line

Public Telp. Coin

Public Telp. Coin

Extension Cable

Direct line
Sound System Diagram

Ceilings Speaker 6 w
4 x for Waiting Hall
Passenger Building
POWER SUPPLY

Ceilings Speaker
4 x for Public Hall
Passenger Building

Main Equipments
Ceilings Speaker
AM / FM
4 x for Waiting Hall
Passenger Building
TAPE DECK MIXER

HornSpeaker 25 w
REMOTE MIC 2 x for Parking Area
POWER AMP

HornSpeaker 25 w
2 x for Queuing Area
SELECTOR

HornSpeaker 25 w
2 x for Moveable Bridge

grounding
Wash Waste Diagram
Guard House

Closed FD

Canteen Kitchen Sink

Grease Trap

Toilets

CO

Closed

Urinoir
Septic Tank

LV

FD

Gutter
Electrical Installation
Tray Cable Installation

Steel Structure

Hanger

Level adjustment

. .
Joint grounding cable (NYA 2,5 mm)

Step :
Marking tray cable & hanger position
Install hanger
Install tray cable
Install Cable NYA 2.5 mm for grounding junction
Fire Extinguisher Installation

Ramset / Dynabolt

Ramset / Dynabolt

150 cm
120 cm

Dry Chemical Fire Extinguisher CO2 Fire Extinguisher

1. Marking position of hanger


2. Install hanger
3. Place Fire Extinguisher at hanger
Exhaust Fan Installation

Ceiling
Exhaust Air flow
grille

Exhaust fan
Wall Mounted

Step :
1. Fabrication ducting & hanger
2. Install ducting
3. Install exhaust grille
4. Install exhaust Fan
5. Install fan grille
Electrical System Diagram
LVMDP / MVMDP
DB PTB DB TA 1 & 2
Lighting & Socket outlet
PLN DB CT 2 DB CT 1
Lighting & Socket outlet
House
DB TS DB OL 1
Lighting & Socket outlet
Lighting & Socket outlet
CTM DB EG
DB GH (Existing)
DB MB DB CTP
TRAVO
DB PT Lighting & Socket outlet DB HP

LVMDP DB LLSDP
DB CS

DB OL.1 Lighting & Socket outlet


DB OL 3
Panel Genset
DB PWR Lighting & Socket outlet
DB STP
DB ASDP
Generator Pump 2 x
set
DB PMP
DB LPM
DB DH
Lightning Protection Installation

Grounding position

Control Box
Of grounding system

Step :
1. Take a location for grounding system
2. Install casing pipe with Gip dia. 1.5
3. Install Copper rod inside Gip casing
Copper rod 4. Connect copper rod to BC Cable
from Lightning protection head

Mencapai muka air tanah +/- 6.00 m

Tahanan max 3 Ohm


Water Supply Diagram

Other Facilities
Exit Gate House Power House For Vessel
Elevated
Gate Valve Water
Tank
M Gate Valve Gate Valve
Meter air
Public Toilet Canteen Truck Scale Guard House
Gate Valve

Passenger Terminal Building

Gate Valve Gate Valve Gate Valve

Toilets Wudlu R. Toilet / Pantry

Ground
tank
Gate Valve
Foot
Valve
Tank Pump
Lorry Gate Valve
PDAM Pump Room

To Gutter
Electrical Installation
Generator Set Accessories Installation
1. Install Attenuator 6. Install Exhaust pipe
2. Install Flexible duct for attenuator 7. Install Tank Fuel
3. Install ducting for jointing atternuator with genset unit 8. Install Fuel pipe
4. Install Attenuator grille 9. Install pump & Valve
5. Install Silencer
Roof Genset room

Daily
Tank

Electric
pump
Manual
Pump

Monthly
Tank
Sanitary Installation

.
Squatting Closet Installation
Hanger pipe

Ceiling

Gip Installation

Hanger pipe

Clean Water

Faucet Faucet

Closet Closet
From other Closet & CO
CO

To Septic Tank Waste Water


To Septic Tank