Sie sind auf Seite 1von 11

04/24/17 Security Level:Internal

www.huawei.com

Quick Loading of the GBTS Upgraded


Software
GTS Wireless Product Service Department

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Introduction

Customer Value and Scenarios

Version Mapping and Reference Material


Source

Application

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 2
Introduction 1/2
Quick loading of the BTS upgraded software: The original loading mechanism is modified
to extend paths for loading the BTS upgraded software. A scenarized loading mode
including common loading, quick loading (without services), and quick loading (with the
BCCH service retained) is then formed.

Common loading: using the OML Quick loading: preempting the


timeslots for loading RSL timeslots
Maximum bandwidth: 64 kbit/s Maximum bandwidth: 320 kbit/s

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 3
Introduction 2/2
The upgrade takes 60 minutes with the The upgrade takes 30 minutes with the
service interrupted for 5 minutes. service interrupted for 10 minutes.

Timeslots for loading the BTS upgraded software are extended with the
bandwidth of 320 kbit/s.
In the one-key upgrade, the board software is loaded on the basis of the
configuration.
The upgrade can be performed on the M2000 and LMT.

Simple, quick, and safe BTS upgrade scheme with high upgrade
efficiency
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Page 4
Customer Value, Scenarios, and Limitations
Customer Value
Reducing upgrade time and impact on services
The timeslots for loading the BTS upgraded software are extended with the bandwidth
extended by four times. In addition, the upgrade time is reduced to 30 minutes.
The software activation procedure is optimized and the service interruption time is
reduced, thus improving customer satisfaction.

Reducing requirements on engineering skills


The one-key batch operations simplify the procedure and operation, thus reducing skill
requirements for on-site engineers.

Reducing service cost


The BTS swapping downtime is reduced, thus avoiding penalty fine due to swapping
timeout.
The BTS upgrade time is reduced, thus improving the efficiency of upgrade and
maintenance.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 5
Customer Value, Scenarios, and Limitations

Scenarios

BTS deployment. BTS software version requires to be quickly upgraded in batches.


BTS maintenance. BTS software requires to be quickly loaded and activated to
reduce the impact on services.

Limitations

Only the RSL can be preempted, and the TCH cannot be preempted. If the number of
TRXs configured in the BTS is small, the extended bandwidth may be less than four
timeslots.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 6
Version Mapping and Reference Material Source
Version Mapping

NE Name Version
M2000 iManagerM2000V200R008C01B060SPC007 and later versions

BSC6000 BSC6000 V900R008C12B195 and later versions

3900 series base The BTS3000V100R008C11B133 or a later version is upgraded.


station

3012 series base The BTS3012V100R008C12B423 or a later version is upgraded.


station

Reference Material Source

http://support.huawei.com > Software > Version Software > Wireless Product Line > GSM-
BSS > GSM-BTS > XXX Version Upgrade Guide

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 7
Application
Site: China Mobile, Huangshi, Hubei Branch
Time: March, 2008

Note:
Only the GRFU uses the extended timeslot for quick loading. The GTMU uses the
common loading. If only the quick loading is used, the upgrade takes 23 minutes .

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 8
Working Time Record of Software Commissioning Acceptance of GSM BTS3900 V300R008C11 at Beta Pilot Office in Huangshi

Record of BTS Upgrade Time and Service Impact in China Mobile, Huangshi, Hubei Branch

BTS
BSC Version BSC6000V900R008C11B195 V100R008C11B008
Version

Target Version V100R008C11B133 Upgrade Time 20090317-20090319

Number of BTSs 158 sets Contact Person Shu Linfeng

BTS upgrade on the LMT, quick loading (without services) on the GRFU, common loading on the GTMU

Number of BTS GTMU Total


Abis Interface BTS GRFU Quick GTMU Activation Service Interruption
Site Name Transmission Common GRFU Activation Time Loading
Multiplexing Mode Configuration Loading Time Time
Ports Loading Time

27 minutes 13 6 minutes 3 minutes 4 minutes 33 minutes 7 minutes


Yaguang 3 S684
seconds 31 seconds 40 seconds 11 seconds 44 seconds 51 seconds

28 minutes 7 minutes 3 minutes 4 minutes 35 minutes 8 minutes


Xiejiyan 4 S666
19 seconds 40 seconds 54 seconds 9 seconds 59 seconds 3 seconds

Zhangjiawa 27 minutes 7 minutes 3 minutes 3 minutes 35 minutes 7 minutes


3 O6
n 51 seconds 16 seconds 2 seconds 58 seconds 7 seconds 0 seconds

Tieshan 29 minutes 7 minutes 3 minutes 3 minutes 36 minutes 7 minutes


3 S444
Station 11 seconds 42 seconds 56 seconds 54 seconds 53 seconds 50 seconds

2:1
Xialu
28 minutes 7 minutes 3 minutes 3 minutes 35 minutes 7 minutes
Business 4 S868
6 seconds 25 seconds 45 seconds 54 seconds 31 seconds 39 seconds
Hall

Area Party 28 minutes 6 minutes 3 minutes 4 minutes 34 minutes 7 minutes


3 S466
School 9 seconds 8 seconds 10 seconds 10 seconds 17 seconds 20 seconds

28 minutes 6 minutes 3 minutes 3 minutes 34 minutes 7 minutes


Big Bridge 3 S66
13 seconds 29 seconds 47 seconds 48 seconds 42 seconds 35 seconds

Average 35 minutes 7 minutes



Time 15 seconds 36 seconds

BTS upgrade on the LMT, common loading on all boards

Number of
Abis Interface GTMU
BTS BTS GRFU Common Service
Site Name Multiplexing Common GTMU Activation Time GRFU Activation Time Total Loading Time
Transmiss Configuration Loading Interruption Time
Mode Loading
ion Ports

27 minute 25 minutes 3 minutes 3 minutes 53 minutes 7 minutes


Red Flag Bridge 3 2:1 S886
56 seconds 36 seconds 27 seconds 46 seconds 32 seconds 13 seconds

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 9
Coordinator

Coordinator: Jiang Chao 32734

Email: jiangchao@huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Page 10
Thank you
www.huawei.com

Das könnte Ihnen auch gefallen