This paper presents,

a software tool which is helped to


protect the power line and the same
time the related vegetation system.

How to reduces the electricity


breakdowns & tripping due to
wayleaves in distribution system.

How to increase the efficiency and


the Quality of Service (QOS) of
national power system.
Objective of Wayleaves
Monitoring System
Ensure Public Safety
Objective of Wayleaves
Monitoring System
Ensure Public Safety

Minimizing Vegetation related


interruptions to maintain continuous
electricity supply
Objective of Wayleaves
Monitoring System
Ensure Public Safety

Minimizing Vegetation related


interruptions
to maintain continuous electricity
supply

Reducing the risk of fire ignition


Objective of Wayleaves
Monitoring System
Ensure Public Safety

Minimizing Vegetation related


interruptions
to maintain continuous electricity
supply

Reducing the risk of fire ignition

A balance of electrical safety, reliability


of the electricity system and
community costs
Objective of Wayleaves
Monitoring System
Ensure Public Safety

Minimizing Vegetation related


interruptions
to maintain continuous electricity
supply

Reducing the risk of fire ignition

A balance of electrical safety, reliability


of the electricity system and
community costs

Ecological and conservation values


Why a Wayleaves Monitoring
System?

For;
Easy collecting vegetation data
Easy inspection of way leaves.
Predictions
Efficient selections of sites
Acknowledge the landowners earlier.
Maintain a database of Distribution System.
What we propose.?
Hardware tool

Mini USB & Bluetooth Interface GPS Module


Software Tool

Building Vegetation
Data Data

Customer
Data Span Data
Software
Manager

Customer
Line
Analysis
Report
Profile

Vegetation
Analysis
Report
Methodologies used to develop the
System
CEB clearance limitation for MV line
Methodologies used to develop the
System
Growth Rate of each tree
How to process Wayleaves
Monitoring System
Making Span Profile
Adding Details to the Span Profile
With our system your are able to

Maintaining vegetation and building data base.


With our system your are able to

Monitor the existing Power line vegetation system of a particular


span.
Side View
With our system your are able to

Plain View
With our system your are able to

Predictions & alerts


With our system your are able to

Predictions & alerts


With our system your are able to

Predictions & alerts


With our system your are able to

Predictions & alerts


With our system your are able to

Predictions & alerts


With our system your are able to

Predictions & alerts


With our system your are able to

Predictions & alerts


With our system your are able to

Analyzing reports

Vegetation Analyze Report


Wayleaves Guideline - Acts

Entry into Any Land or Premises Item 8 of Schedule II of the Electricity Act No. 20
of 2009

Where a licensee Wishes to enter a land or premises for the purpose of installing an electric
line/plant, minimum of three (3) days notice (specimen notice: appendix l) stating the nature
and extent of the work intended to be carried out, has to be given to the occupier if the land is
occupied and to the owner if it is not occupied.

Abstract from Granting of necessary wayleaves for electricity


networks in Sri lanka-2010 report
With our system your are able to

Analyzing reports

Customer Analyze Report


Results

Minimize wayleaves interruption.


Save inspection time.
Save money by reducing labour cost ,material
cost and etc..
Maintain a good Quality Of Service (QOS) to
consumer.
Further improvements

3 D view
Transmission line design
& many more.
Thank You
Department Of Electrical & Electronic Engineering
University Of Peradeniya

Das könnte Ihnen auch gefallen