STAGE -
REQUIREMENTS INCLUDE:
Facility would need to be air conditioned and humidity controlled
Facility would need to be clean and dust free
A large freezer would be required to store material to -18
5 x 2ft x 6ft laminating benches
2 x 3ft x 6ft Material cutting benches. CNC material cutting machine
Sealed trimming area with dust extraction
IT equipment with internet connection.
Compressed air supply and dryer to feed Autoclave and run small air tools 1000-2000lt air receiver
Autoclave ( Crosby Composites to consider supply)
415/240v supply for Autoclave/Compressor/AC/Lights/Extraction
COMPOSITE STAGES
STAGE 010
DESCRIPTION CAD
MOULDED/VISUAL FACE
DESCRIPTION CNC
CNC PROCESS
DESCRIPTION TOOLING
NESTING SOFTWARE
COMPLETE KIT
CUTTING PROCESS
COMPOSITE STAGES
STAGE 050
DESCRIPTION LAMINATING
MOULD TOOL
VACUUM BAGGING
DESCRIPTION TRIM