Sie sind auf Seite 1von 3

Honesty & Integrity

Recommendations for Cardanes Inspection with


Hammer Process Good Corporate Citizen

Phil Downey Open Communication

6/2/2017 Continuous Improvement

2016 Dana Limited. This presentation contains copyrighted and confidential information of Dana Incorporated and/or its subsidiaries. Those having access to this work
Danamay
2016
not copy it, use it, or disclose the information contained within it without written authorization of Dana Incorporated. Unauthorized use may result in prosecution.
Constant and Variable Shaft Yoke Ears
Hammer Blow

On the ear that the cross gets pounded


into, the edge of the cross hole must be
inspected for chips and burrs, whether
attached or loose.
On the ear that the cross gets pounded
into, inspect the broach surface for
damage, chips, and burrs, whether
attached or loose. No raised material
permitted.
Mark ear to certify the inspection took
place and was acceptable.

Dana 2016
Cross

Hammer Blow

Inspect Leading Edge of the


Cross Journal for Raised
Material, Loose, or Attached
Burrs None Are Permitted

Mark trunnion to certify


the inspection took
place and was
acceptable.

Leading Edge
Of Cross Journal
Pounded In
Dana 2016

Das könnte Ihnen auch gefallen