AGENDA Basic course on

Power system
Protection & Control
ABB Group Processes - 1
Basic course on Power system Protection & Control

Material used for the course

ABBs Protection application hand book


CBIP manual on Protection of Generators,
generator transformers and 220kV and 400 kV
networks
CBIP Manual on Reliable fault clearance and
back-up protection of EHV and UHV transmission
networks
ABB Group Processes Ltd - 2 -
ABBs Protection application hand book

The book covers most aspects of protection


application based on extensive experience of ABB

Selection of protection relays for different types of objects


Dimensioning of CTs and VTs matching protection
requirements
Design of protection panels including DC and AC
supervision, terminal numbering etc
Setting of protection relays to achieve selectivity
Principles of subdivisions of the protection systems for
higher voltages
ABB Group Processes Ltd - 3 -
ABBs Protection application hand book

List of Contents

1 Network General
2 Fault calculation
3 Network earthing
4 Protection General
5 Protection Line
6 Protection Transformer
ABB Group Processes Ltd - 4 -

7 Protection Reactors
8 Protection Capacitors
ABBs Protection application hand book
List of Contents
9 Protection Bus and Breaker
10 Earth fault protection
11 Current Transformers
12 Voltage Transformers
13 Requirement on current transformers
14 Control System structure
15 Protection Settings
16 Subdivided systems
ABB Group Processes Ltd - 5 -
CBIP Manual-1

Manual on Protection
of Generators, Generator
Transformers and 220 kV and 400kV Networks

Recommendations contained herein for protection of E.H.V system of


220 kV and 400 kV are intended to be used by utilities in India as a
guide for minimum provisions at different voltage levels.
ABB Group Processes Ltd - 6 -

The manual also contains a section on Generators and Generator


Transformer protection.
CBIP Manual-1

1.0 Contents

Generator and Generator Transformer protection


Line protection
Autoreclosing
Transformer protection
Reactor protection
Bus bar protection
Breaker fail protection
Disturbance recorder and Fault location equipment
Guide lines for protection engineering
Location of CTs and VTs
ABB Group Processes Ltd - 7 -

Commissioning tests and maintenance recommendations


Test equipment
CBIP Manual-2

Details of the WG

WG formed in 2003
Members from
Utilities,Manufacturers &
Academic institutes in India
Report released during
CIGRE colloquium of
B4 + Meeting of CIGRE
Administrative Council in
ABB Group Processes Ltd - 8 -

Bangalore India
17-24 Sep 2005
CBIP Manual-2

Aim of the manual

Gives recommendations to Utilities in India

Fine tune some practices


Management of Protection Systems in EHV
&UHV systems
Enhance dependability of fault clearance system
ABB Group Processes Ltd - 9 -
CBIP Manual-2

Fault clearance system


Fault Clearance System

Protection System

CT Circuit Breaker

Circuit
Protection Breaker
VT Trip
Equipment Mecha-
Coil
nism
TE
ABB Group Processes Ltd - 10 -

DC-System
CBIP Manual-2

Dependability of fault clearance


system
Second main protection increases the availability
and dependability
Back-up protection that is independent of the main
protection enhances this .
Decisions for provision of additional protection and
back-up protection should be considering the
ABB Group Processes Ltd - 11 -

disturbance costs due to uncleared faults.


CBIP Manual-2

Disturbance costs
Risk of injury to people and damage to third party
property
Risk of damage to power lines and other power
apparatus
Customer outages
Voltage disturbances
Customers complaints and ill will
ABB Group Processes Ltd - 12 -
CBIP Manual-2

Continuous improvement

Utilities should have a system of measuring and


keeping record of the performance indices for
Protection devices and Switching devices
Dependability
Security
Helps taking decisions regarding maintenance,
ABB Group Processes Ltd - 13 -

modernizing and retrofitting of switching and


protection system
CBIP Manual-2

Usefulness to utilities
The manual will help the protection engineers of
various utilities in India in managing the availability
and reliability of the fault clearance system in
transmission networks in the voltage range from 132
kV to 765 kV.
ABB Group Processes Ltd - 14 -
CBIP Manual-2

List of contents
Chapter 1 : Introduction
Chapter 2: Fundamentals
Chapter 3 : Requirements
Chapter 4 : Performance Indices
Chapter 5 : Lines and Cables
Chapter 6 : Power Transformers
Chapter 7 : Shunt Reactors
Chapter 8 : Bus bars
Chapter 9 : DC auxiliary Supply Systems
ABB Group Processes Ltd - 15 -

Chapter 10 : Switching Devices


Chapter 11 : Communication Systems
Chapter12 : References
AGENDA- COURSE ON PROTECTION APPLICATION

Day-1 ( Morning session 09:00-13:00)


Protection General
Protection Line
Network General

Day-1 ( Afternoon session 14:00-18:00)


Protection Transformer
Fault calculation
Network earthing
ABB Group Processes Ltd - 16 -
AGENDA- COURSE ON PROTECTION APPLICATION

Day-2 ( Morning session 09:00-13:00)


Protection Reactors
Protection Capacitors
Subdivided Systems
Protections in breaker and half bus configuration

Day-2 ( Afternoon session 14:00-18:00)


Protection Bus and Breaker
Control System structure
ABB Group Processes Ltd - 17 -

Protection of SC lines
Overview of PTSY-R products
AGENDA- COURSE ON PROTECTION APPLICATION

Day-3 ( Morning session 09:00-13:00)


Control Circuits , Interlocking
Earth fault protection
Current transformer

Day-3 ( Afternoon session 14:00-18:00)


CT requirements
Voltage transformer
Protection Settings
ABB Group Processes Ltd - 18 -
ABB Group Processes - 19

Exercise
Test
Test

Go through the questions carefully

Write answer when point is explained during the


presentation.
ABB Group Processes Ltd - 20 -
ABB Group Processes Ltd - 21 -