The new Generation of


Fault location systems
Centrix
The new Fault Locating System

Central and flexible as the name,


this system combines all our available technologies in one cube.

With on single hand, you control the complete Fault location


Everything with left
Or right
Whatever you prefer.
No unnecessary switches and controls.

Fast, simple and without compromise!

Centrix 2
The central operating element
of the Centrix !

Centrix 3
Concept

Development of a new Concept based on the experiences


with the existing Compact and Vario

Re-design of the Teleflex with a simultaneous improvement


of the performance

Implementation of all essential Seba KMT Technologies


and fault location methods.

A flexible software concept, wich is open for future ideas ,


improvements, technologies and especially for
customer requirements.

Centrix 4
The new Centrix system concept

Modular For each method an own package is available

Measuring data transfer via USB interface and Memory Stick

We can start with very small and attactive solutions

Softwareupdate via USB Interface or CD ROM

Free positionable Control Console

Automatic Fault location

Side USB Connectors for Data Transfer

Very Fast Fault location!

Centrix 5
The new Centrix system concept

Divided
display
At the top
display of
the data

Lower part
Operation

Centralised with the


essential information

Centrix 6
The new Centrix operating concept

Ergonomic Handling with free placable control console

The System Thinks ahead. The next step is always prepared

Central Control via Jogdial

Large Display

Direct optical Feedback

Direct help and manual in the display

Storage of the measuremnets as


PDF file (Print to PDF)

Centrix 7
The new Centrix operating concept
Quick Select Phase select

Help

History

Centrix 8
What is important for the user ?
We have very different users

In Germany, central Europe and some special countries


The experienced technicians and engineers

Im most countries
Less experience and training

In many countries
No training and experience

Thissituation requires some very different


argumentations, approaches and handling

Centrix 9
Das System is clear and open

The whole operation happens only


at the Control Panel

The user can focus on the fault


location procedure only

Wrong operations are prevented


by the Centrix and its safety system

Especially for utilities with a lot of


fluctuation of the operating personel
and personal on call this technology
is of high efficiency

Centrix 11
The Operator Think positive

He finds the faults faster Less trained users


Time is money
He finds the faults even faster The service provider
The system will never replace the expertise of an experienced technician

The well experienced technician


Less overtime His Boss, but also technicians

Safety is very important.


Our test vans have the highest safety standard Compared to Competition

The system is certainly not slower than manually operated systems!

But here the technician sits and waits


while he is busy with all the gears the in the manually operated system

Centrix 12
Advantages of the automatism

The re-energizing happens faster The system is simply faster

No measurement is lost History

The user has more time to focus on the evaluation Quality

The system is safer no wrong operation, less hectic

Better overview Everything on one display

Automatic measurement The user corrects and does the fine tuning

User guidance Specially for service on duty a great help

Centrix 13
Prelocation Methods
DECAY 80 kV DECAY Conventional Travelling Wave Decoupling

ARM 32 kV ARM The approved ARM Technology for short distances

ARM Plus 32 kV ARM Plus Arc Reflection Prelocation for larger Distances

DECAY Plus 80 kV DECAY Plus The only Arc Reflection Prelocation up to 80 kV

ICE 32 kV ICE Current decoupling with Surge and DC Impulse Prelocation

3 Ph ICE 32 kV 3 Phased ICE Special Development for Teed MV and LV Networks

ARM Arc The approved ARM Arc reflection burn technology is back
Reflection Burning Burn take over from 20 kV

Why are Decay or ICE innovative prelocation methods ?


Because the are conciderably improved, for example with automatic fault
location with Marker and Cursor, with subtraction of the test leads!...

Centrix 14
Remote Support
The Centrix offers several possibilities to transfer measurement data.
Preferred medium is the USB stick

Printing
Normal USB Printer (app. 500 Printers are available)
Export and Print as PDF
Anybody can read and handle this format
Winkis Export
With the Winkis software a further filing and data management is possible
Export of the complete measuring data files
by this method, everybody which has the demo software installed on his PC,
can import these files and handle them there like in the real test van system.
This permits evaluating, printing or transmitting as PDF.

Even the Demo Software provides a very efficient tool for the
handling of measured data.

Centrix 15
Upgrade for existing Vario KMT Systems

The Frontend, - Industrial PC,


Display and Control Unit can
also be used to replace the
existing Control unit on
Vario KMT Test Van systems.

Centrix 16
Remote Control
Functions at the GSM Phone
All Modes Mode Sheath testing
HV Off No Emergency OFF ! Continous
Test time restart Interval
Duty cycle
Mode Pinpointing
Single shot Mode burning
Automatic Continous
Stop (at auto) Interval
Surge (at auto) Burn time restart
Surge rate in sec. Burn time in Minutes

Centrix 17
Options
VLF

VLF 40 5 F testable capacity


VLF 54 5 F testable capacity
VLF 80 1,3 F testable capacity

OWTS

Integrated Audio frequency transmitter 200 W

Integrated three phased ICE

Power Burning

Centrix 18
Options
Burning
Burn Take over
Power Burning DC with U/I Diagram
from 20 kV
20 kV 40 V, I max. 40 A
Steps 600, 250, 100, 40 V
ARM Arc Reflection burning (Option)

Power Burning AC with U/I Diagram


AC Burning 440V 7,5 A / 180 V 16 A / 75 V 40 A / 30 V 70 A

Thyratron pulsed, Ratio 1:3,


max. 5 kV / 10 A (Option)

Continous operation, Short circuit operation


63 kg, 5 kVA

Centrix 19
General Data
Testing up to 8 kV Ishort 650 mA In 200 mA
40 kV Ishort 300 mA In 70 mA
80 kV Ishort 180 mA In 15 mA

Surging up to 16 / 32 kV 1280 J Base

Option 4 / 8 kV 1200 J With only 14


kg more
almost
or 4 / 8 kV 1750 J + 7 kg
50 % more
16 / 32 kV 1750 J + 7 kg Surge energy
Option 4 / 8 kV 2400 J + 30 kg at identical
16 / 32 kV 2560 J + 30 kg volume
2 KV 1200 J

Centrix 20
Features

ARM - Considerably better resolution in the close range

Power Booster 20 kV 40A DC / 70A AC

Arc Reflection Burning

Automatic storage of all processes nothing gets lost,

LINUX . Only what is really needed is part of the operating system.

Automatic - setting of all parameters for the measurement


- End detection
- Fault location and marking (Also for transient methods)
- Testruns from Iso test to the final pinpointing (coming soon)

IFL Mode 1 Mann can detect the faulty branch.

Centrix 21
Advantages
Replacement SF6 H006 by small oil switches

1750 J without volume increase

ARM and ARM Plus,


Both with identical reference and fault trace

Integrated 200 W AF Generator

Installation in 3,5 t vehicle

Very small, simple 40 kV base version


With possibilities for upgrading.

Interface 32 or 80 kV for the connection and


control of external HV equipment

Operation is still possible in the case that


A phase or phase selection switch has failed.

Centrix 22
Systemoptions
System Voltage Surge levels Prelocation Cable drums

Base system Module 2 kV 1200 J DECAY 80 kV Economy


Centrix 40 kV
In = 70 mA 4/8 kV 1200 J ARM 32 kV Comfort
Three phased Is = 300 mA
Consisting of: 4/8 kV 1750 J ARM Plus 32 kV Pro
Control Panel with Module
Jogdial VLF 40 4/8 kV 2400 J DECAY Plus 80 kV 3 phased
Teleflex MX
15 TFT Monitor
Module 16/32 kV 1280 J ICE 32 kV Teleflex
Insulation test
Sheath test 80 kV
Safety system In = 15 mA 16/32 kV 1750 J 3 ph ICE 32 kV Safety
Is = 180 mA
Preparation and
Wiring for Module 16/32 kV 2560 J
all options VLF 54
VLF 80 Power Burning ARM Burning
50 A DC
Ext. HV 70 A AC Thyratron
Language versions Intefaces Remote Control

Centrix 23
Examples for the three phased Centrix Versions
Price
All systems with full furnishing, FLE 10, Digiphone
Pro
1324 kg

Caculation based on 1250 kg payload


2 kV 1200 J
with 100 kg Reserve = 1150 kg payload
Comfort
1193 kg
4,8 kV 2400 J

16, 32 kV 2560 J

Base
1002 kg 4,8 kV 1750 J
DECAY

16, 32 kV 1750 J 80 kV Decay Plus

ARM
4,8 kV 1200 J
Econom 80 kV Decay Plus
ARM Plus
16, 32 kV 1280 J ARM / ARM Plus
ykg
965
80 kV Decay Plus VLF 54 kV
ICE
Power Burning
16, 32 kV 1280 J ARM Plus ICE VLF 54
40 kV Decay
ICE 200 W Transmitter 200 W Transmitter
ARM
HV Cable Drum LC HV Cable Drum MC HV Cable Drum HC
HV Cable Drum LC
Everything
LV Cable Drum LCfree selectable,
LV Cable Drum LC almostLVany combination
Cable Drum MC isDrum
LV Cable possible
MC

Centrix 24
System Options VLF
40 54

40 kV 80 kV
4/8 kV 4/8 kV
Decay
1200 J 2400 J

ARM
Brennen 4/8 kV
1750 J
Centrix
Decay Plus ARM Plus MFO Safety TDR
Basis
Basis1/3
3
1 16/32 kV
ISO 1750 J
ICE

16/32 kV 16/32 kV
3 ph ICE 1280 J 2560 J
Brennen
ARM AC / DC
Ext. HV
Burning Burn- 2 kV
Units
Thyratron Take over AF 1200 J

Centrix 25
The Centrix Versions
The Centrix is available as single and tree phased version.
Possible outfits and options are depending on the selected vehicle.
Single phased
Centrix 1-40
Output max. 40 kV. No oil or Gas insulation required
Centrix 1-80
Output max. 80 kV. Oil insulated HV switching

Three phased
Centrix 3-40
Output max. 40 kV. No oil or Gas insulation required
Centrix 3-80
Output max. 80 kV. Oil insulated HV switching

Centrix 26
Field tests
From the many field tests two lines are shown here as representative
example

The first cable was a 63 kV cable with 8 km length


The results show all available technologies. It shows that all
measurement and prelocation methods perform also with an
8 km high voltage cable.

The second cable was a 20 kV cable with 750 m length


This cable was a branced medium voltage distribution network.
Also here all applicable methods including 3 phased ICE were
used and applied.

Centrix 27
Field tests

Reflection-
Measurement
at 8 km Cable

Centrix 28
Field tests

Decay Travelling ave


decoupling am 8 km Cable

with Marker and Cursor


or
Shift technlogy

Centrix 29
Field tests

ICE Current decoupling


at 8 km Cable

Centrix 30
Field tests

ARM at
8 km Cable

Centrix 31
Field tests

ARM Plus
at
8 km Cable

Centrix 32
Field tests

Three phased reflection


measurement at 20 kV Cable

Centrix 33
Field tests

ARM at 740 m Cable

Centrix 34
Field tests

ARM Plus at 740 m Cable

Centrix 35
Field tests

ICE
Automatic
Fault location

Centrix 36
Field tests

ICE
Automatic
Fault location
and the manual
correction

Centrix 37
Field tests

Three phased current decoupling


with different setting

Centrix 38
The new IFL Mode

IFL Mode
Verification of a defined position.
This can be done by on single person.

Centrix 39
The advantages of the IFL Mode

One person can verify the faulty branch.

User can stay on the net (Without supply, but with fuses inserted,
removal of fuses is always a very time consuming procedure.)

Good and faulty phases can imediately be detected.

Also behind full short circuits the signal is still visible,


since the impedance change is much more enhanced by
IFL than by a normal reflection measurement.

This can be used to verify all phases.

Centrix 40
Mehr Infos unter www.sebakmt.com