Status of Black spot treatment and

Road Safety Audit on Odisha Roads

Er. Rashmi Ranjan Bohidar, Superintending Engineer, ISAP


BLACK SPOT IDENTIFICATION (ASI)

Locations where the road accidents repeatedly take place or tend


to cluster together are commonly known as Accident Black Spots
or Black Spots.

Hazardous Spots are prioritized based on Accident Severity Index


(ASI) and Standard Deviation.

Hazardous spots with Accident Severity Index (ASI) more than


Threshold value (Average Severity + 1.5 times Standard Deviation)
is considered as Black Spots.
BLACK SPOT IDENTIFICATION (ASI)

Accident Severity Index (ASI):


In order to quantify the criticality of an accident site, a system of assigning scores has been
adopted based on the severity of accident.

The score termed as Accident Severity Index (ASI) is a dimensionless value indicating the
hazardousness of a spot on the road.

ASI = (Nf x Wf) + (Ng x Wg)


Nf = No. of fatal accidents at the spot;
Wf = Weightage assigned to fatal accident = 7;
Ng = No. of grievous accident;
Wg = Weightage assigned to grievous accident = 3.

{Note: minor injury & non-injury are not considered}.


Definition of Black Spots
With respect to Works Department OM No. R. Misc. /123/2016/14017 Dated 15.11.2016 on the basis of OM of
Govt. of India (Ref. RW/NH/15017/109/2015/P&M (RSCE) dated 28.10.2015 , the black spots on SHs and MDRs
have been defined as per following :

Road accident black spot is a stretch of about 500m in length in which,


Five road accidents involving fatalities/ grievous injuries took place during last
three consecutive calendar years
or
Ten fatalities took place during the last three calendar year
Identified Black spots based on accident data [ 2013-2015]
On State Highways : 64 Nos.
On MDR : 15 Nos.
On ODR : 9 Nos.
On ULB Road: 1 No.
Total = 89 Nos.
Short-term and Long-Term action Completed on 40 Nos. Black spot stretches.
Long-term actions on 41 black spots on SH-10 will be completed soon.
At the end of 31.12.2017 , 83 black spots shall be removed.
In 2018 March, Long-term actions on balance 6 Nos. will be completed.
Status on Action Taken on Black spot Stretches
No. of Black spots
Name of on State on Total Status as on Date Remarks
Sl. No. on MDRs
District Highways ODR+ULB
Date of
completion of
Short-Term
Long Term Action Taken Long-Term Action ongoing Long-term
Action Taken
actions on PPP
Road
1 Khorda 1 1 5 7 Yes - 7 Nos.
2 Nayagarh 0 1 0 1 Yes-1 No.
3 Dhenkanal 0 0 1 1 Yes- 1 No.
Balasore T-Junction Development -1 No. 31.03.2018
4 0 0 1 1
Jagatsinghpur Yes-5 Nos.
5 5 0 0 5
6 Sambalpur 4 0 0 4 Work is in progress On SH-10 : 4 Nos. 31.09.2017
7 Jharsuguda 2 0 0 2 Work is in progress On SH-10 : 2Nos. 31.09.2017
Bolangir Yes- 4 Nos. 2 Nos. T-Junctions Development- 1 location 31.12.2017
8 5 0 0 5

9 Sonepur 0 1 0 1 New Box Cell Culvert with wider approach 31.03.2018


Ganjam 4 1 1 6 Tata to PMEC- 1 Dhanghar square-1 ; Kharkhari Approach to Haldipadar Jn- NHAI 31.12.2017
; Kamapalli Fish Bridge approach-1 Nos. & Dura-
10 Market:1 No. Gangupathara Chhack-1 No.

Sundergarh 35 9 0 44 Yes - 7 Nos. PPP Work is in Progress On SH-10 :35Nos. 31.09.2017 31.03.2018
11 Additional 2 Nos on MDR shall be rectified
after completion of 4-Laning work
Keonjhar ODR- 1 Y-Junction Development and
12 1 0 1 2 No.(Kuajharan Railway Sidings- 1 No.
13 Rayagada 6 2 0 8 Ghat)
Yes-8 Nos.
14 Nabarangpur 0 0 1 1 Widening of Stretches 31.03.2018
15 Gajapati 1 0 1 Straightening of Ghat Road 31.03.2018
Total 64 15 10 89 36 4 49 41 8
Status of Road Safety Audit

Agencies SH (in KM) MDR (Km) Total (Km)

R&B Divisions , 2425 1786.4 4211.4


Independent Engineers,
EPC Works, OSRP, ICT
CRRI, New Delhi 1768 732 2500

Balance 0 301.6

Total Length 4193 2820 7013


Action Taken on Black spot :Khurda R&B Division
Action Taken on Black spot :Khurda R&B Division
Action Taken by Ganjam R&B Div. No.-I
Action Taken by Ganjam R&B Div. No.-I
Action Taken by Rayagada R&B Division No-I on Black spot on
Komtalapeta-Muniguda-Tumudibandha Road
Action Taken by Rayagada R&B Division No-I on Black spot on
Komtalapeta-Muniguda-Tumudibandha Road
Traffic calming measure taken at Kuajharan Ghat by
Ghatgaon (R&B) Division
Assessment of Accidents and Fatalities
In all 89 Black spot Black spot locations In 41 black spots located on SH-10 Road

No. of accidents No. of fatalities No. of accidents No. of Fatalities

865 438 341 232

-- Around 50 % accidents -- More than 50 % fatalities


are proven fatal. occurred
Accident Reduction Measures at Junctions

(b) A deceleration lane reducing risk of


(a) A good horizontal sight distance from side nose-to-tail accidents
road

(c) Combining elements in (a) & (b) restrict sight (d) Intersection places the waiting vehicle in
distance with a potential for right-angle accidents a position from which the driver can clearly
see all the approaching vehicles
Measures for taking action for addressing issues of Black Spots
- Short-term, Medium-term and Long-Term Road Safety Interventions
( As per MoRTH)

Short-Term : Immediate cautionary signs on Black spots, Markings, Delineations,


Sign Boards, Hazard Markers, Studs, Rumble Strips

Medium-Term : Widening of curves , super elevation, shoulders, curve


corrections, Sight Distance improvements , flaring of junctions, etc.

Long-Term : New By-pass, Widening/Reconstruction of Bridges, Flyover


construction, Realignment
Short-Term Actions (immediate cautionary measure )taken on 37 Nos. of
Black spots where accidents are due to non-engineering factors
Black Spot Number Name of (R&B) Divisions
responsible for rectification

A001, A203-A206 Khurda

A101 Nayagarh
A102 Bhubaneswar-I
A201-A202 Bhubaneswar-III
A206 Dhenkanal
A002- A006 Jagatsinghpur
A014 A017 Kantabanjhi
A021 Ganjam-II
A105- A106 Rourkela
A107-A113 Sundargarh
A058-A063, A114-A115 Rayagada

A208 Ghatgaon
Medium-term/ Long-Term actions on 52 Nos. of Black spots where
accidents are occurred due to engineering factors
Black spot No. Name of R&B Division responsible for removal/ Remarks : Action Taken/ Action Plan/ Status thereof
rectification

A207 Balasore T-Junction Development


A013 Bolangir 2 Nos. T-junction Development

A014 Sonepur New Box Cell with wider approach construction

A018, A301 Ganjam-I Widening completed


A019-A020, A104 Ganjam-II Median Gap Closing, Widening of approach to CD
Work

A057 Keonjhar Y-Junction Development & Railway Siding

A007 A012 Sambalpur -I


A022- A024 Rourkela Widening of Sambalpur-Rourkela Road

A025-A056 Sundergarh
A064 Paralakhemundi Straighaening of Ghat Portion

A209 Nabarangapur Widening of Stretches


Status of Road safety Audits on SHs/ MDRs
ROAD SAFETY AUDIT TRAFFIC CALMING TECHNIQUES (3)

PARTIALLY
OPERATIONAL / EXISTING ROAD NEW ROAD PROJECT
TOTAL LENGTH OF BLACK SPOT IMPLEMENTATION OF RECOMMENDATION PROJECT MORE THAN 10Cr.
ROAD

SH & MDR - 7013 Immediate cautionary Measures have 1. 22 Nos. of EPC Projects : Provision of Sign Boards ,
Km SH-64 Nos. & been taken up in all Black spots. Independent Road Safety Auditors have been Markings on junctions,
MDR : 15 Nos. Medium/ Long term measures have entrusted to conduct various stages of Road vulnerable places on
ODR- 9 Nos. & already been taken in 77 black spots . Safety Audits as per IRC: SP:88-2010. SHs/MDRs are being followed
ULB : 1No Only Balance 12 Nos. of black spots , 2.One PPP Project: by Divisions. Instructions were
Total : 89 Nos. medium/ Long-term measures are being Different stages of Audits are being conducted issued for construction of
taken. by CRRI, New Delhi. rumble strips and placement of
3. All other Projects costing more than Rs. 10 sign boards , road markings on
Cr. & Less than Rs. 50 Cr. minor road on different
Design, Construction and Operation stage junctions of State Highways
audits are being conducted by internal road meeting with MDR/ODR/Other
safety auditors of the concerned (R&B) Circle. roads.

2. Total 6700 Km completed. RSA of 2500 Km


completed by CRRI New Delhi.