Tnb Distribution
9TH March 2015 31 may 2015
Self introduction
Company profile
Training activity
SELF INTRODUCTION
To provide the students to the world of work so that they can relate theoretical
knowledge with application in industry
To build and increase creative and positive thinking when overcoming engineering
problems.
To improve my soft skills such as communication, management and team-work.
Enhancing the potential of the student to with the situation that they encounter.
Company profile
To achieve the above objectives, the company owns and operates power plants and the National Grid and
installed for this purpose, customer service center, call management center, substations and administrative
offices throughout Peninsular Malaysia. TNB`s core activities are in generation, transmission and
distribution of electricity which are being handled by its subsidiaries:
TNB Vision: To be among the leading corporation in energy and related business globally.
PROJECT PLANNING
09/03/2015
- PLANNING 28 CABLE EN NORAZMI BIN ARIFFIN
05/04/2015 &
CONSTRUCTION SUBSTATION
OVER HEAD
06/04/2015 METER
- METERING 28 EN MOHD FADZLI BIN
03/05/2015 SERVICE MOHD TAHIR
04/05/2015 SUBSTATION
-
28/05/2015 OPERATION 28 OVER HEAD EN. AZLI HILMI BIN
& FAUDZI@MD RAWI
MAINTENANCE CABLE
FAULT FINDER
consturction department
Apart from that, TNB also responsible to shut down the substation that involved in the
construction before the contractor start doing their job to avoid accident from happening.
The important work in construction job is joining cable to make sure that the new
substation will get the supply to operate . Furthermore joining cable is done when there is
breakdown which happened because the cable is damaged.
Type of cable
25 90 150 320
70 160 240 400
120 230 500 550
185 290
300 380 Cable
Joining cable
Advantages of Aluminum :
cheaper than copper
lighter and easier to handle
less scraper value, not prone to theft
Disadvantages of Aluminum :
softer than copper and required careful handling
oxidizes easily making connections more difficult
Conductor rating
Four types of poles are used in the TNB : The standard lengths are:
Wood Poles 10 meter - for HT cable (HV)
Pre-stressed Spun Concrete poles 9 meter - for overhead mains (LV)
Reinforced Concrete Poles
The 11kV supply that feeds into switchgear comes in the XLPE cable (HV cable).
In one cable, have three cores (R, Y, B) which is connected to the three terminals
of incoming feeder of the switchgear.
From the switchgear, the supply goes to the HV side of the transformer through
XLPE cable
Estimation of substation project involves working out the cost of the following
Land
Salaries
Materials
Contract
Transport
Overhead
SITE VISIT
Site visits are essential before planning starts. The following can be obtained from site visits.
a) Sources of supply
b) Types of loads
c) Site information on:
Trees
Ground conditions and terrain
Other services on site such as telephone lines and water mains.
Drains, stream, ponds etc
MAKING A Site visit
Metering unit