Beruflich Dokumente
Kultur Dokumente
Introduction
[RL20] RA4133-20A
OSS discussion and PM evaluation
Module 2
Iub/Iu transmission
BTS level
Cell level
SGSN MGW
MSC/HLR
SABC SGSN
PLMN level
Mobility Management Radio, transmission monitoring S1
Entity (MME)
S1
S1/X2 S1
eNB level S1
Group
SAE GW
8xxx M 8000
M 8006
M 8001
MME M 8007
M 8004
M 8011 M 8008
M 8012 Access/drop
M 8018 S1 signalling
Load
measurements
eNB
eNB
cell
cell
cell M 8015 X2/RAN HO
for each adjacency
eRAB Access
M 8006 Gateway RAB setup/release/drop
X2
cell
cell
cell
LTE_5218A
LTE_5017a E-RAB Setup Success Ratio
LTE_5017a
LTE_5025a
LTE_5018a E-RAB Setup Failure Distribution Ratio RNL
Result Time
LTE_5021a E-RAB Setup Failure Distribution Ratio OTH
CSSR [%]
CSTR [%]
LTE_22 Service Drop Rate
10.18.2010 Network 29 100 48,76 45,94 48,7552 2,32
10.19.2010 Network 40 97,56 48,93 43,652 47,6113 2,32
LTE_5023 E-RAB Normal Release Ratio EPC initiated 10.20.2010 Network 25 99,7 45,48 48,558 45,3502 2,32
10.21.2010 Network 21 100 42,32 53,144 42,32 2,32
10.22.2010 Network 24 100 34,34 64,737 34,3413 2,79
LTE_5024 E-RAB Normal Release Ratio eNB initiated 10.23.2010 Network 24 100 36,98 64,673 36,9816 2,64
10.24.2010 Network 24 100 33,78 65,549 33,7778 2,85
10.25.2010 Network 30 100 33,58 66,638 33,5784 2,84
LTE_5025 E-RAB Drop Ratio 10.26.2010 Network 21 100 29,56 69,316 29,5604 3,33
10.27.2010 Network 24 100 37,26 61,189 37,2583 2,59
10.28.2010 Network 21 100 37,92 66,043 37,9182 2,44
E-RAB Drop Distribution Ratio RNL 10.29.2010 Network 18 100 39,34 66,351 39,3421 2,35
LTE_5026
10.30.2010 Network 18 100 46,4 64,76 46,4023 2,01
10.31.2010 Network 18 100 42,86 63,861 42,8571 2,15
12 Nokia Siemens Networks RA4133 EN20GLA0
11.01.2010 Network 36 100 45,39 61,449 45,3925 1,98
OSS Monitoring Example
LTE_5218A
LTE_5017a
LTE_5025a
LTE EPS Bearer measurement (M8006)
CSSR [%]
CSTR [%]
10.18.2010 Network 29 100 48,76 45,94 48,7552 2,32
10.19.2010 Network 40 97,56 48,93 43,652 47,6113 2,32
10.20.2010 Network 25 99,7 45,48 48,558 45,3502 2,32
10.21.2010 Network 21 100 42,32 53,144 42,32 2,32
10.22.2010 Network 24 100 34,34 64,737 34,3413 2,79
10.23.2010 Network 24 100 36,98 64,673 36,9816 2,64
10.24.2010 Network 24 100 33,78 65,549 33,7778 2,85
10.25.2010 Network 30 100 33,58 66,638 33,5784 2,84
10.26.2010 Network 21 100 29,56 69,316 29,5604 3,33
10.27.2010 Network 24 100 37,26 61,189 37,2583 2,59
10.28.2010 Network 21 100 37,92 66,043 37,9182 2,44
10.29.2010 Network 18 100 39,34 66,351 39,3421 2,35
10.30.2010 Network 18 100 46,4 64,76 46,4023 2,01
10.31.2010 Network 18 100 42,86 63,861 42,8571 2,15
11.01.2010 Network 36 100 45,39 61,449 45,3925 1,98
11.02.2010 Network 18 100 44,72 61,768 44,7167 1,99
11.03.2010 Network 27 100 38,58 63,514 38,5827 2,46
11.04.2010 Network 24 99,86 34,72 71,402 34,5491 2,69
11.05.2010 Network 24 99,41 30,59 79,487 30,3915 3,18
11.06.2010 Network 24 99,08 41,05 72,597 40,4132 2,1
PM files structure
merged
interval all measurement type
files are merged into a single
PM-report file which is
uploaded to NMS Measurement type Y