GAME 1

GAME OF SURVIVAL
WHOSE TEAM WILL SURVIVE?

RULES OF THE GAME


FORM 6 TEAMS WITH 7 MEMBERS EACH. (PICK A TEAM
NAME AND SOUND)
EACH MEMBER OF THE TEAM HAS 3 LIVES.
THE HOST WILL ASK QUESTION AND THE TEAMS WILL
USE FLASH AND THEIR SOUND TO ANSWER.
THE FIRST GROUP WHO ANSWERED RIGHT CAN CHOOSE
A SQUARE.
A B C D E F G H I J
1 LEGEND
2 TAKE 1
= LIFE
3
TAKE 2
4 = LIVES
5 PICKER
6 = LOSE 1
LIFE
7
PICKERS
8 = TEAM LOSE
1 LIFE
9
ADDS 1
10 = LIFE
QUESTION NO. 1

It indicates quantity.
a. Testing c. Drawings
b. Specifications d. None
QUESTION NO. 2
A combination of words properly describing the
quality of a product, its method of manufacture,
its installation into a project, and in some cases, a
description of the final result or appearance.

a. Closed Specifications c. Specifications


b. Open Specifications d. None
QUESTION NO. 3
A type of specification that is either
closed or open specs.
a. Commercial c. Performance
Specifications Specifications
b. Streamlined d. Preliminary
Specifications Specifications
QUESTION NO. 4
A standardized system of
arrangement for specification writing.
a. Specification c. Catalogs
b. Master Format d. None
QUESTION NO. 5
How many divisions are
contained in the format?
a. 20 c. 10
b. 15 d. 16
QUESTION NO. 6
What is Division No. 7?
a. Woods and Plastics c. Equipment
b. Thermal and d. Doors, Windows
Moisture and Glasses
Protection
QUESTION NO. 7
What is Division No. is
Special Construction?
a. Division 5 c. Division 13
b. Division 10 d. Division 6
QUESTION NO. 8
A type of specification where it
is used as a final specification.
a. Preliminary c. Tabulation
b. Federal d. Final
Specification
QUESTION NO. 9
It allows competition to the supplier or
product but within broad limits of
equality.
a. Open c. Performance
Specification Specification
b. Commercial d. Open
Specification Specification
QUESTION NO. 10
What is NOT the major part
of Uniform System?
a. Filling System c. Specification Outline
b. General Requirements d. Cost Accounting
Guide
QUESTION NO. 11
Determining the forecast
cost to complete a project.
a. Approximate c. Estimating
b. Specifications d. None
QUESTION NO. 12
A type of estimate that includes everything
that needs to complete the project as well as
overhead and contractors profit.

a. Detail Estimate c. Organization


Estimate
b. Model Estimate d. None
QUESTION NO. 13
A type of estimate, wherein an
estimator uses equations to prepare
the estimate.
a. Approximate c. Lump-Sum
b. Parametric d. None
QUESTION NO. 14
A type of estimate that is prepared by
calculating building area and then
multiplying area by predefined unit cost.
a. Unit-Price c. Unit-Based
b. Unit-Area d. None
QUESTION NO. 15
Mostly used among partition
of walls.
a. Wood c. Board
b. Glass d. CHB
QUESTION NO. 16
Size of a 200mm by
400mm in inches.
a. 8 by 10 c. 8 by 16
b. 8 by 8 d. 8 by 6
QUESTION NO. 17
How many CHBs are there
in 1 sq. meter?
a. 12 c. 13
b. 8 d. 12.5
QUESTION NO. 18
How many CHBs are required
in an 8.1 sq. meter wall?
a. 105.3 c. 102
b. 106 d. 104.5
QUESTION NO. 19
Type of estimate that is done by
multiplying the square feet or square
meter to the cost per meter.
a. Project Comparison c. Unit Based
b. Model d. Approximate
QUESTION NO. 20
Type of estimate is prepared based on a
model project estimate which is
developed before.
a. Model c. Approximate
b. Project Model d. Unit Based
QUESTION NO. 21
A social unit, which has been deliberately
designed to achieve some specific goals.
a. Family c. Team
b. Organization d. Group
QUESTION NO. 22
The formal system of task and reporting
relationships that control, coordinates, and
motivates employees so that they cooperate to
achieve the organizations goal/s.
a. Main Structure c. Master Format
b. Organized d. Organizational
Structure Structure
QUESTION NO. 23
An agreement between two or
more people.
a. Deal c. Contract
b. Agreement d. None
QUESTION NO. 24
A type of contract wherein the
constructor finances without any support
to the owner.
a. Administration c. Management
b. Unit-Price d. Turnkey Project
QUESTION NO. 25
Covers any increase/decrease in
qualities of original work items in the
contract.
a. Variation Order c. Change Order
b. Extra Work Order d. None
QUESTION NO. 26
Damages agreed upon by the parties to
the contract, to be paid in case of breach
thereof.
a. Construction c. Emergency Damages
Damages
b. Liquidation Damages d. Liquidated Damages
QUESTION NO. 27
A contract wherein the constructor
will manage the affair while the
owner will pay.
a. Management c. Unit Price
b. Lumps Sum d. Administration
QUESTION NO. 28
Which is NOT part of the
Coordination Process?
a. Organize c. Unity of
Command
b. Span of Control d. Decentralization
QUESTION NO. 29
A request payment for project
implementation when 90% of work is
completed.

a. Initial Payment c. Final Payment


b. Progress Payment d. Ending Payment
QUESTION NO. 30
The initial forum in a bidding
process.
a. Open Forum c. Closed Forum
b. Pre-Bid d. Post-Bid
Conference Conference
VERY GOOD!!
SORRY!!!