Sie sind auf Seite 1von 21

ASECNA

AGENCY FOR AIR


NAVIGATION SAFETY IN
AFRICA & MADAGASCAR
AGENCY FOR AIR NAVIGATION
SAFETY IN AFRICA &
MADAGASCAR (ASECNA)
BENIN France
BURKINA-FASO GABON
CAMEROON MADAGASCAR
CENTRAL AFR REP MALI
CHAD MAURITANIA
CONGO BRAZZA NIGER
COTE D IVOIRE SENEGAL
EQUAT. GUINEA TOGO
ORGANIZATION

BOARD OF MINISTERS
CIV. AVIATION

AUDIT COMMISSION BOARD OF DCAs FINANCIAL AUDIT

OPERATIONS TECHNICAL HUMAN RESS. FINANCE ACCOUNTS DEPT


ASECNA 16 millions sq.km
6 FIRs /5 FIC
FIR FIR
FIR NIAMEY
DAKAR NDJAMENA

FIR
FIR BRAZZAVILLE
DAKAR OCEANIC

Agence pour la Scurit de la Navigation Arienne en Afrique et Madagascar


Sige Social : 32-38 Av. Jean Jaurs DAKAR B.P. 3144 Tl. :23.10.40 -
Fax :23.46.54
Bnin-Burkina-Cameroun-Centrafrique-Congo-CtedIvoire-France-Gabon-
Guine Equatoriale-Madagascar-Mali-Mauritanie-Niger-Sngal-Tchad-Togo FIR
ANTANANARIVO
SERVICES
ATS
COMMUNICATIONS (FIXE/MOBILE)
FLIGHT INSPECTION
FIRE FIGHTING
ENGINEERING
RESSOURCES
AERONAUTICAL FEES (LANDING &
EN ROUTE)
MEMBER STATES CONTRIBUTIONS
ON THEIR NAT L ACTIVITIES
ENTRUST TO ASECNA
LOANS
COMMUNICATIONS

VHF NETWORK EXTENSION FOR


MORE CONTROLLED AIRSPACE
SATCOM FOR AIR TRAFFIC CONTROL
AERONAUTICAL TELECOM
NETWORK (ATN)
HF / DL - SATELLITE BACK UP
NAVIGATION

GROUND BASED EQUIPMENTS IN


CONTRIBUTION TO LOCAL OR WIDE
AREA AUGMENTATION SYSTEMS
SURVEILLANCE
SSR /NDJAMENA/BRAZZAVILLE
AUTOMATIQUE DEPENDANTE
SURVEILLANCE (SITA / AIR AFRIQUE /
COLLINS/ANAM)
AIR SITUATION DISPLAY FOR NON
ADS FLIGHT
ADS/SSR
ADS-B
SURFACE MVT GUIDANCE
ATM 1/2
AUTOMATIC FLIGHT DATA
PROCESSING
CONFLICT DETECTION AND CLEAR
FLEXIBLE AIR ROUTES
(CONTINENTAL/OCEANIC ATL-
INDIAN)
DARPs
CPDLC
D-FIS
ATM 2/2
REDUCED UPPER AIRSPACE
AREA TRAFFIC FLOW MANAGEMENT
HARMONIZATION OF TERMINAL
AREA (TMAs) LIMITS
SUB REGIONAL ATM SYSTEMS
INTEGRATION
AVIONICS
AFI / LOW DENSITY TRAFFIC
FULL AUTONOMOUS AVIONICS ON
BOARD OVERSEAS INTL AIRLINES
LACK OF EQUIPMENT ON MAJOR
DOMESTIC OR REGIONAL OPERATORS
B-RNAV
FAIR COST CNS/ATM SYSTEMS
(DL/ADS/GNSS) VDL MODE
MODULAR BASIS
ASECNAS CNS/ATM
IMPLEMENTATION COST
ACQUISITION/INSTALLATION/OPERA
TION (2000/2010)
COMMUNICATION 50 millions US$
NAVIGATION 33
SURVEILLANCE 42
ATM 68
TRAINING 16
INFRASTRUCTURE 66
TOTAL 276
COST/BENEFITS ANALYSIS

1999/2005 INVEST. INCOMING


6 6
ASECNA 235. 10 US$ 259. 10 US$
AIRLINES 309. 106 US$ 341. 106 US$
FINANCING
ASECNAS CASE STUDY

DEVELOPMENTS/DEMONSTRATIONS
& TRIALS
STOCK FUNDS
OPERATIONS INFRASTRUCTURE
TRADITIONAL EUROPEAN & AFRICAN
FINANCIAL INSTITUTIONS
EXISTING
INFRASTRUCTURE
AFTN MODERNIZATION
INTERCONNECTION OF
COMMUNICATIONS NETWORK
VHF COVERAGE /DATA LINK X 25
PROTOCOL
SADIS IMPLEMENTATION
EXISTING
INFRASTRUCTURE
LADGPS TRIALS IN DAKAR
GPS /PRIMARY/SUP. MEAN
WGS 84
GNSS IMPLEMENTATION IN AFI
STUDY FOR EGNOS TEST BED
EGNOS/WAAS INTER OPERABILITY
TESTS
EXISTING
INFRASTRUCTURE

ADS IN AFI WITH RKA / COLLINS


/SITA
ENHANCEMENT TO FANS- /1/A
EXISTING
INFRASTRUCTURE

ATM INTEGRATION AND


HARMONIZATION / 40 YEARS
TRAINING
15 SEMINARS OF SENSIBILIZATION
TRAINAIR PROGRAMM