Beruflich Dokumente
Kultur Dokumente
2
Customers want their pizza delivered fast!
Service
Design
Management
Purchase
IT
Quality
Depart.
HRM Finance
5
Statistical background
Tolerance
LSL USL
+/ - 3s
Target = m
+/ - 6s
Six-Sigma
6
Performance Standards
s PPM Yield
2 308537 69.1%
3 66807 93.3% Current standard
4 6210 99.38%
5 233 99.977%
6 3.4 99.9997% World Class
7
Financial Aspects
8
In a world at 3 Sigma In a world at 6 Sigma
The Police makes 7 false arrests There are fewer than 4 false arrests per
every 4 minutes month
9
Companies who have successfully adopted
Six Sigma strategies include:
10
An iterative process
(continuous improvement)
11
Phases of Six Sigma are:
Define specific goals/Problems to achieve
outcomes, consistent with
customers demand and business strategy
Measure data must be gathered to measure responsible
variable
Analyze Identify the root cause of defects, identify
defectives or significant measurement deviation,
whether in or out of specification
Improve process, reduce variability or eliminate the
cause of defects
Control With the desired improvements in place,
monitor the process to sustain the improvements 12
Reduce spend of consumables
Annual Spend $20,00,000
Target to reduce $2,50,000 in 6 months
13
14
15
16
17
18
19
7QC tools
Check Sheets (collect data to make improvements)
Pareto Charts( define problem and frequency)
Cause and effect diagram (Identify possible causes
to solve problem)
Histogram (Bar charts of accumulated data to
evaluate distribution of data)
Scatter diagram (plots many data points and pattern
between two variables)
Flow Chart (Identify unwanted steps)
Control charts (Control limits around mean value)
20
21
22
23
Improving performance through a precise quantitative
understanding of the customers requirements thereby
bringing in customer focus
Improving the effectiveness in upstream process of the
software development
life cycle by defect reduction (software defects reduced by
50%) and cycle time
reduction (rework in software down from 12% to 5%).
Waste elimination and increased productivity upto 35%.
Cost of failure avoidance (installation failures down from
4.5% to 1% in hardware business).
Tangible cost savings due to lower application development
cost for customer
24
Six Sigma is methodology used for:
Aligning key business processes to achieve those
requirements & to increase profitability
Utilizing rigorous data analysis to minimize data
variation in those processes.
Driving rapid and sustainable improvement to
product or business processes.
25
26
THANKS
27