Manufacture
Installation
Maintenance
For What ??
Higher energy efficiency
Maintain appropriate comfort levels
Higher productivity
Internationally
CIBSE
ASHRAE
Locally
Pakistan Engineering Council
Institution of Engineers Pakistan
Concept Stage
The functional use of the building, owner and
occupant requirements, architectural concepts and
budget limitations are typically determined during
this phase. These requirements should be
documented in a statement of design intent for the
building systems, which is refined and updated as
the design progresses. If cold-air distribution is to
be considered for the project, it is best to advance
the option at this point, so the entire design can
be developed to best realize its benefits.
Preliminary
During this phase, building services engineer
coordinates the MEP systems with architectural
and structural systems to resolve potential
conflicts.
Building lighting calculations are refined
Building power calculations are refined, detail
load schedules are prepared
HVAC calculations are refined
Equipment sizes and capacities are selected,
System layouts are developed
Construction Phase
The design engineers responsibilities during
this phase typically include reviewing shop
drawings, observing construction, and
conducting or witnessing system performance
tests.
Contractors may require guidance to ensure
that they follow the project specifications
rather than their standard methods
thank you