Nov. 2017
Lites des scenarios
210
Type Mode Frequency Band (MHz) CPRI Rate Data Nombre de Ports
(Gbit/s) connecte a lAntenne
JOUR 1 Verifier et identifier les equipements existants and le scenario du Site DEBUT 09 : 00
JOUR 1 preparation des nouveaux supports, des nouvelles antennes + Jumper
JOUR 1 Pre-installer les nouveaux cables d'energie and les fibres CPRI pour tous les RRU
JOUR 1
Pre-installer les nouveaux Feeders FIN 17:00
Actions principales:
Actions principales:
Actions principales:
Actions principales:
Remplace de l'antenne existante en hexabande antenne
Installation du RRU3281 (L2600) sur la tour
Remplacement des cartes (WBBP/UBBPd6) par les nouvelles cartes (UBBPe4).
Remplacerment of GRFU1800 by MRFU1800
Connexion des RET sur le RRU de LTE2600 et labeliser toutes les technologies par
secteur (GSM/DCS/U2100/L800/L2600)
Actions principales:
Actions principales:
Actions principales:
Use an M6 inner hexagon screwdriver to loosen the four hex Install the removed main bracket on one side of the
Install the first RRU onto the main bracket, as shown
socket screws from the main bracket and pole mounting kit on first main bracket, as shown in Figure 3.
in Figure 1. For details, see Installing a Single RRU.
the second set of mounting kits, and remove the main bracket,
Figure 1 Installing the first RRU onto the main
as shown in Figure 2.
bracket
Figure 2 Removing the RRU main bracket NOTICE:
The second main bracket must be installed, with the
open ends of U-shaped slots on both sides facing
downwards.
Figure 3 Installing the second main bracket
(1) Main bracket (2) Pole mounting (1) Removed main bracket
kit
NOTE: Install the second RRU onto the main bracket, as Securing the captive screw into the connection hole
The main mounting bracket for installing a blade RRU can shown in Figure 5.
connect to the main mounting bracket for installing a Figure 5 Installing the second RRU onto the main Install the sheet metal tab for fixing the neighboring
common RRU in the scenarios of Ajoutering RRUs, as shown bracket RRUs, as shown in Figure 7.
in Figure 4.
Figure 7 Installing the sheet metal tab
Figure 4 Connecting to the main mounting bracket for
installing a common RRU
RRU
R1 GSM900 RRU3008
U2100 /MRFU900
R2 LTE800 RRU3936
DCS1800 Y1 U2100 RRU3826
LTE2600
Y2 DCS1800 MRFU1800
Y3
LTE2600 RRU3281
GSM900 LTE800 Y4
ANT_TX/RXD Y4 / +45 11
ANT_TX/RXB Y4 / -45 12
ANT_TX/RXA R2 / +45 3
ANT_RXB R2 / -45 4
LTE800
HUAWEI TECHNOLOGIES CO., LTD. Page 22
BBU connexion **
1-4-0 1-4-1 1-4-2 1-4-3 1-4-4 1-4-5
MRFUd MRFUd MRFUd MRFUd MRFUd MRFUd
GU 900 GO 1800 GU 900 GO 1800 GU 900 GO 1800
SECTEUR1SECTEUR1SECTEUR2SECTEUR2SECTEUR3SECTEUR3
UBBPe4
UBBPd2 UO GTMUb GO
UBBPe4 LO UPEUc
WBBPd2 UO UMPTb2 UL
BBU3900-0-0