Beruflich Dokumente
Kultur Dokumente
Beginners Guide
Mat Leaver
High Level Support Concept
Pre DR5 Commercial Deployments
Welcome Center
AR
Issues
** GPS **
Follow Up
AR
R&D
Outage
ER
Outage
Outage escalated within TEC if
Management needed
Customer
Pre DR5 FUTs
Pre DR5
Issues
Product
Issues TI&S
ARs
2 | Presentation Title | Month 2006 All Rights Reserved Alcatel-Lucent 2006, #####
GPS(TEC) Structure
Patch
Identify if possible GPS Project
workaround Management and
Customer Primes
Known issue filtering
Define SW component Who : GPS CE Engineer
impacted Objective :
Return fix plan to CoE / Verify and deliver emergency
customer patches released by GPS Level
4.
Produce quarterly roll up
maintenance load for all
Verified Patch & Maintenance Loads patches for all customers.
Sync with BSR test for test
improvement focus (i.e. how
do we catch it next time).
3 | Presentation Title | Month 2006 All Rights Reserved Alcatel-Lucent 2006, #####
GPS Scope
Note: NEs such as the Brick already have
GPS Support Coverage Scope a level 4 support team in place, so in
these cases GPS will focus more around
level 3 support and CE.
Operators Network
PSTN
IuCS MSC
BVG
IPC
IuCS + IuPS
BSG
BPG Router
FEMTO
IuPS SGSN GGSN
Brick
Internet
4 | Presentation Title | Month 2006 All Rights Reserved Alcatel-Lucent 2006, #####
So what is GPS?
Travel is expected to be very rare (if at all) given we can now attach a
GPS Femto to any customers network and use their core network to
reproduce issues.
Femto GPS is split between Swindon and Nanjing and will support up to 10
field trials and all commercial soft launches planned around the world.
For UTRAN GPS this is an entire organisation consisting of over 130
engineers covering all issues post GA.
5 | Presentation Title | Month 2006 All Rights Reserved Alcatel-Lucent 2006, #####