WORKPLACE
ASSIGNMENT
Hazards at DTY-2 Texturizing Machine
of Recron (M) Sdn.Bhd
INDEKS NO : NS 12224
NAMA : NAGARAJAN A/L PALANYSAMY
INTRODUCTION
I. Recron Malaysia is the largest integrated polyester and
textile company in Malaysia with manufacturing facilities in
Nilai and Melaka.
II. Its products include polyester polymer, nylon polymer, and
various types of yarn including POY, DTY, FDY (Full Drawn
Yarn), HTY (High Twist Yarn) as well as PET (Polyethylene
Terephthlate) bottle grade resins. Over 90 percent of the
companys products are exported worldwide throughout
Asia, Europe, Middle East and the United States.
INTRODUCTION
1) The usual job for workers at Texturizing machine area
is to push yarn trolleys from warehouse to machine.
INTRODUCTION
2) Climb on the mobile ladder to install the POY yarn
bobbin
INTRODUCTION
The main tasks carried out at the Texturizing Machine
areas are:
Pushing
Damaged Floor( Trolley handling training.
yarn Trolley path installed
holes on the Falling of trolley and To patch holes on the
trolleys 3 2 6 with metal plate on
2 floor) cause physical injury. floor.
from the floor.
(Safety Hazard) Warning signboards.
warehouse
to
Texturizing
machine Unbalance Trolley handling training.
arrangement of Supervision
area. Falling of trolley and Standard Operation
3 bobbin on the 3 2 6 5 minute toolbox
trolley) (Safety cause physical injury. Procedure and Safe
Do and Dont Posters
Hazard) Work procedure
Lifting
Unsafe Mobile Falling from mobile Standard Operation Design new mobile
heavy Ladder ladder with heavy Procedure and Safe 3 3 9 ladder with safety
5
(22KG) (Safety Hazard) load.(22Kg) Work procedure features.
yarn
bobbin
and climb Noise Exposure
on the Monitoring
mobile Audiometry Test Recommended
6 ladder (6 High Noise area Signboards Hearing Protection
Hearing Impairment 2 3 6
(Health Hazard) Hearing protection devices with higher
Feet
devices NRR (33dB)
height) (NRR 29 dB)
and hang
the
bobbin on Bobbin not
installed Standard Operation
to the Bobbin fall on the Bobbin stopper with
properly on the Procedure 2 3 6
7 operator. lock.
winder machine.
machine (Safety Hazard)
holder.
Lifting heavy
Job Rotation
load repeatedly
Cross Training Motorize Bobbin
and climb Joint and muscle pain 3 3 9
8 Standard Operation Lifter
ladder.
Procedure
(Health Hazard)
RISK ASSESSMENT
LIKELIHOOD DETAILS RATING
The most likely result of the hazard / event being realized 5
Most likely
(daily/weekly)
Conceivable
Might be occur at sometimes in future (yearly) 3
3
Serious Non-fatal injury, permanent disability
SEVERITY
LIKELIHOOD
1 2 3 4 5
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
RISK MAGNITUDE FORMULA
RISK DESCRIPTION ACTION
Elimination
Removing Mobile Ladder from texturizing machine area is not possible and it is very costly.
Substitution
Substitution of the mobile ladder is not necessary and it is very costly.
Isolation
Isolating the operators from the hazards of using the mobile ladder is not feasible too.
Engineering Controls
The Mobile Trolley redesigned with improved safety features.
Administrative Controls
The Safe work procedure can be revised. Every trolley distance need to be more than 3 meters from
each other.
Appoint a traffic controller to control the passage of trolley. The traffic controller also responsible to
give warnings to other worker of incoming trolley.
HAND
RAIL
WIDER
STEPS
BRAKE
AFTER BEFORE
IMPROVEMENT
BEFORE AFTER
IMPROVEMENT
BEFORE AFTER
CONTROL MEASURE RECOMMENDATIONS
For the most critical health hazard identified at Texturizing Machine Area, the
repetitive movement of worker to carry the bobbin and climb
on the mobile ladder.
Elimination
The mobile ladder climbing job cannot be eliminated as the machine designed is
such.
Substitution
Substitution of the mobile ladder is very costly.
Isolation
solating the operators from the hazards is not feasible as that is the main activity
I
of the process.
Engineering Control
Engineering control is very costly.
Administrative Controls
Implement Job Rotation System. (cross training, Safe work procedure,
5Minutes Tool Box meetings)