Activities Involved
Pipe Rack Planning/Area Planning
Pipe Routing/modeling
Interference check
Discrepancy check
Visual walk through of plant model
Preparation of piping isometric drawings
Preparation of Piping composite drawings
Inputs Required
Plot Plan
G.A. drawing of building or specific area
Equipment GA drawings
3 D Models
Civil/ Structural drawings
Piping and Instrumentation Diagrams (P&IDs)
Terminal Point Details
In Line Component details
Instrument installation drawings or guide line.
Design Criteria document
Piping Design Tables (PDTs)
Piping Layout Considerations:
Operation
Maintenance
Constructability
Economics
Safety
Aesthetics
A
B C
Pipe racks and Pipe Trenches
Piping outside process units shall be supported on
sleepers, at ground level in Pipe racks or below ground
level in Pipe Trenches.
The choice between Pipe tracks and Pipe trenches is
dictated by technical and economic considerations.
The distance between sleepers in pipe tracks and in pipe
trenches shall be based on maximum allowed free span of
the majority of pipes.
Elevation of sleepers shall be such that there is access for
maintenance and for operation of valves, drains and
instrumentation.
Flanged connection shall not be installed in trenches.
Concrete trenches shall be adequately drained.
The Headroom normally provided
is as below.
Sr. Description Headroom
No. (mm)
1. Clear head room under 2200
Structures/pipe lines
inside operating area.
2. Head room over rail 7000
(from top of rails)
3. Clear headroom above 7000
crest of road for crane
movement.
4. Clear headroom above 6000
crest of road for truck
movement.
5. Clear headroom above 4500
crest of road between
Flexibility
Flexibility
General Piping layout Guidelines
Shall be done in line with process requirement.
Bottom of lines should be on same elevation.
Avoid pipe in Trenches.
Avoid valves in vertical run
Proper accessibility of inline components
Pipe to pipe spacing shall be as recommended
Distance between pipes shall allow for turning of spectacle
blind, if present.
Piping shall be supported properly.
Standard and easily available pipe fittings to be used.
For large dia buried pipe line air release valves, manholes
to be provided.
Slopes to be provided in pipeline as per the process
requirement.
General Piping Layout Guidelines
For cold lines with stretch beyond 80 meter, expansion loop
shall be provided.
Installation of valves.
Strainers
Pressure relief