Sie sind auf Seite 1von 6

External Interference Source

Verify
22 Aug 2013
External Interference source finding
process
1.Inform NOC team create IM number to request verify external
interference
2.Verify external interference by 3 step
– 2.1.Change remote tilt to verify external interference
– 2.2.Full load test for confirm hardware
– 2.3.Scan frequency for confirm external interference
After finish Please sent the result to Dtac RNO team
3.RNO owner region inform FO team to find source external
interference
4.FO team do report result after find external interference and
sent report to RNO team
5. RNO team escalate issue external interference to NBTC
E xternal Interference source verify
process
1.C hange remote tilt to verify external interference
• DS P R E TS UBUNIT =>Display ant. Tilt to show existing
• MOD R E TS UBUNIT=>Adjust tilt to verify external interference
source/and roll back tilt

Tilt Tilt Tilt


E xternal Interference source verify
process
2.F ull load test for confirm hardware
• LS T UC E LLHS DP A =>S how existing parameter
• DE A UC E LLHS DP A=>DE A HS UP A to S TR DLS IM
• S TR DLS IM: LOC E LL;
• S TP DLS IM: LOC E LL;
• AC T UC E LLHS DP =>R oll back
E xternal Interference source verify
process
3.S can frequency for confirm external interference
• DS P BR D:
• BLK BR D:
• UBL BR D
End of Document

Das könnte Ihnen auch gefallen