Sie sind auf Seite 1von 30

Composite Construction

Composite beam
• A composite beam is one whose cross-section consists of two or
more elements of different materials, acting together while
carrying some or all of the loads
• Composite prestressed concrete consists of precast prestressed
beams and cast insitu concrete.
• The insitu portion is not usually prestressed and therefore,
often consists of lower grade concrete provided with ordinary
reinforcement.
• After the insitu concrete has hardened, the two elements
perform as one.
• Depending on the stiffness, the precast member can be
designed to carry the weight of the in situ concrete or can be
propped, so that it carries only its self-weight during casting.

1/20/2018 SPK-PSG College of Technology 2


• In latter case, the props are removed when the concrete has
hardened and the weight of insitu topping is then carried by
the composite action.

1/20/2018 SPK-PSG College of Technology 3


1/20/2018 SPK-PSG College of Technology 4
Advantages….
• Economical
• Less time consuming
• Reduction in the false work and shoring cost
• No need of formwork and scaffoldings
• CIPC slab provides continuity at the ends of elements over
adjacent spans
• Provides stability to girders

1/20/2018 SPK-PSG College of Technology 5


Types of composite
construction
 Propped Construction
 The dead load stress developed in the precast prestressed
units can be minimized by propping them while casting the
concrete in situ.
 Unpropped Construction
 If the precast units are not propped while placing the in situ
concrete, stresses are developed in the unit due to the self-
weight of the member and the dead weight of the in situ
concrete.

1/20/2018 SPK-PSG College of Technology 6


1/20/2018 SPK-PSG College of Technology 7
Analysis and Design…….
• Analysis Problem
– Given data
• Sectional properties
• Length of the member
• Load conditions
– Result
• Internal stresses or forces
• Design problem
– Given data
• Length of the member
• Load conditions
• Forces or stresses
– Result
• Sections to be checked for its adequacy

1/20/2018 SPK-PSG College of Technology 8


Analysis of composite sections for
concrete stresses
• The flexural stresses are calculated using elastic analysis.
• Let the flexural stress be denoted as f, the bending moment M
and section modulus or elastic modulus Z, then
M
f  
Z
• Bending moment is computed from the self weight of the
precast unit and the weight of wet cast in situ slab concrete in
case of unpropped construction.
• On the other hand, in propped construction, the weight of
concrete is not considered as the propping of the beam relieves
the weight of the wet concrete in the situ slab.

1/20/2018 SPK-PSG College of Technology 9


Problem-1
• A precast pretensioned beam of rectangular section has a
breadth of 100 mm and a depth of 200 mm. the beam with an
effective span of 5 m is prestressed by tendons with their
centroids coinciding with the bottom kern. The initial force in
the tendons is 150 kN. The loss of prestress may be assumed to
be 15 percent. The beam is incorporated in a composite T –
beam by casting a top flange of breadth 400 mm and thickness
40 mm. if the composite beam supports a live load of 8 kN/m2.
Calculate the resultant stresses developed in the precast and
insitu concrete assuming the pretensioned beam as: (a)
Unpropped, (b) propped during the casting of the slab. Assume
the same modulus of elasticity for concrete in precast beam
and insitu cast slab.

1/20/2018 SPK-PSG College of Technology 10


1/20/2018 SPK-PSG College of Technology 11
1/20/2018 SPK-PSG College of Technology 12
1/20/2018 SPK-PSG College of Technology 13
1/20/2018 SPK-PSG College of Technology 14
Differential Shrinkage
• In composite construction, the precast prestressed beams are resisting
the applied loads along with the cast In situ slab.
• Precast elements were placed earlier, creep and shrinkage would
have already taken place.
• The wet concrete of slab is laid over the precast unit, and the
shrinkage and creep continues.
• The magnitude of the tensile force is computed as
Nsh=ξcs Ec Ai
where Nsh = Magnitude
ξcs = Shrinkage strain
Ec = Modulus of elasticity of insitu concrete
Ai = Cross sectional area

1/20/2018 SPK-PSG College of Technology 15


• This tensile force is balanced by a compressive force applied at
the centriod of equal magnitude.
• The force applied at the cast in situ slab causes a direct force
acting at the centriod of the composite section together with a
bending moment.

1/20/2018 SPK-PSG College of Technology 16


• The formulae to compute the stresses due to differential
shrinkage are as follows
Ps M
Stress at the top fibre of the slab   f
Ac Zt

Ps M
Stress at the bottom fibre of the slab   f
Ac Zb

Ps M
Stress at the top fibre of the beam  
Ac Z J

Ps M
Stress at the bottom fibre of the beam  
Ac Zb

1/20/2018 SPK-PSG College of Technology 17


Where,

Direct compressive force and bending


Ps M moment

Uniform tensile stress at centre of the


f
slab

section moduli at top, junction and bottom


Zb Z t Z J of the precast beam

Ac Area of composite beam

1/20/2018 SPK-PSG College of Technology 18


Problem-2
A composite beam of rectangular section is made of inverted T-beam
having a slab thickness of 150 mm and width of 1000 mm. the rib size
in 150 mm x 850 mm. The in situ concrete slab has EC = 30kN/m2 and
the thickness of cast in situ slab is 1000 mm. If the differential
shrinkage in 100 x 10-6 units, estimate the shrinkage stress developed
in the precast and cast in situ units.

1/20/2018 SPK-PSG College of Technology 19


1/20/2018 SPK-PSG College of Technology 20
Deflections of composite
beams
• The estimation of deflections at service loads essentially
depends on two factors i.e, the stages of loading and the
difference in modulus of elasticity of precast concrete unit
and the cast in situ slab.
• Unpropped Construction- Deflections are computed using
sectional properties and modulus of elasticity of the precast
unit. Loads are due to prestress, self weight of beam and the
weight of the cast in situ slab.
• Propped Construction- The composite beam section properties
are used to determine the deflections due to live load and self
weight of the cast in situ slab.
Note- If different grades of concrete are used in cast in situ slab
and precast beam, then equivalent second moment of area is to
be used in computations.
1/20/2018 SPK-PSG College of Technology 21
Design of composite beams of precast
unit and cast in situ slab
 In design of composite beams, the moment of resistance of
precast prestressed unit is increased by the addition of cast in
situ slab.
 Two possibilities are
 A prestressed beam of known size is to be added with a cast in situ
slab.
 A prestressed section is to be designed for a composite section of
known size.
Section modulus of composite action

 Z b M1 
Zbc   
 Zb f ct  ftw   M  M min  

1/20/2018 SPK-PSG College of Technology 22


Section modulus of composite action

 Z b M1 
Zbc   
 Zb f ct  ftw   M  M min  
Where,
Zbc= section modulus at the bottom fiber of composite section
Zb= section modulus at the bottom fiber of precast beam
M1= moment acting on composite beam
M= moment acting on precast beam
Mmin= minimum moment
η= loss ratio
fct,ftw= compressive stress at transfer and tensile stress at
working load.

1/20/2018 SPK-PSG College of Technology 23


Also
 ftw M M   M min 
finf     fsup   ftt  
  Zb Zbc   Zt 
The minimum prestressing force P is computed from the following expression

P

A f int Z b  f supZ t 
Zt  Zb 
and the eccentricity of the prestressing force is

e
 
Zt Zb fint  fsup
finf,fsup =stress in concrete at the
bottom and top of section
A fintZb  fsupZt  respectively
Zt,Zb = section moduli at the top
and bottom of section
respectively
1/20/2018 SPK-PSG College of Technology 24
Problem-3
Design a composite slab for the bridge deck using a standard invested T
section. The top flange is 250 mm wide and 100 mm thick. The bottom
flange is 500 mm wide and 250 mm thick. The web thickness is 100 mm
and the overall depth of the inverted T-section is 655 mm. The bridge
deck has to support a characteristic imposed load of 50 kN/m2over an
effective span of 12 m. Grade 40 concrete is specified for the precast
pretensioned T section with a compressive strength at transfer of 36
N/mm2. Concrete of grade 30 is used for the insitu part. Determine the
minimum prestress necessary and check for safety under serviceability
limit state. Section properties: Area = 180500 mm2, position of
centroid = 220 mm from the soffit.I = 81.1 x 108 mm4, Zt = 18.7 x 106
mm3, Zb = 37 x 106 mm3. Loss ratio = 0.8, Mmin = 0.

1/20/2018 SPK-PSG College of Technology 25


1/20/2018 SPK-PSG College of Technology 26
1/20/2018 SPK-PSG College of Technology 27
1/20/2018 SPK-PSG College of Technology 28
References

• Prestressed concrete-K.U.Muthu, Azmi Ibrahim,


Maganti Janardhana and M.Vijayanad (Based on IS
1343-2012)
• Design of prestressed concrete structures- T.Y.Lin and
NED.H.Burns.
• Fundamentals of Prestressed Concrete –N.C.Sinha and
S.K.Roy
• Prestressed concrete –N.Rajagopalan
• Prestressed Concrete- N.Krishna Raju
• Reinforced concrete –Limit State Design-Ashok K Jain
• IS 1343-2012-Prestressed Concrete Code of Practice
1/20/2018 SPK-PSG College of Technology 29
Thanks for listening
All the best

1/20/2018 SPK-PSG College of Technology 30

Das könnte Ihnen auch gefallen