• ANY BUILDING IN WHICH THE CONSTRUCTION OF ATM HAS
BEEN PERMITTED MUST HAVE BEEN MADE BY FOLLOWING
THE BYE LAWS FOR THAT BUILDING.
• THE PROCEDURE FOR THE PERMISION OF CONSRUCTION OF
ATM WILL BE SAME AS PER THE SPECIAL PERMISSION
PROCEDURE SPECIFIED IN ZONING REGULATION.
15
REQUIREMENTS FOR SHOPPING MALL
19
REQUIREMENTS FOR AUDITORIUM OR
CONVENTION CENTRE
CONSTRUCTION OF AUDITORIUM WILL ONLY BE
PERMITTED UNDER THE MASTER PLAN ZONING
REGULATION.
MIN. WIDH OF ROAD MUST BE 24 M. I ALREADY
DEVELOPED AREAS AND 30 M. IN DEVELOPING
OR NEWLY DEVELOPED AREAS.
FOR COVENTION CENTRE PROPOSED IN AREA
LESS THAN 10 ACRES F.A.R. IS 2.0 ALTHOUGH
FOR 10 ACRES OR MORE THAN THAT IT IS 3.0
20
• SET BACK,PARKING AND OTHR REQUIREMENTS WILL BE
ACCORDING TO THE BUILDING BYE LAWS.`