Seminar on Practical Training
at
NLC BARSINGSAR
nted by:
Prese GHI N
I K A N T S
RAV
th sem
EE, 7
MOTIVATION
I wanted to see And Understand the
Electricity Generation Process and power
plant closely that how giant machineries
are Installed And How They Functions
LOCATION OF NLC BARSINGSAR THERMAL
PLANT
NLC BARSINGSAR PLANT is another branch of
“Neyveli Lignite Corporation Limited”. It is situated
at 24 km south-west from Bikaner city.
INTRODUCTION
1 SH RH CONDENSOR
LP
HP IPT
T
COAL T CEP
2
SOR DEARATOR
- MI
LIME STONE FURNACE
3 LPH
NO
DRAFT
ECO
OIL
4 BF
P
HOT AIR
APH FD FAN HPH
ID FAN
To chimney
COAL HANDELING PLANT
1 2
BUNKER
CONVEYER
3 4
stacker
COAL STORAGE
BOILER
The boiler is also termed as, ‘steam generator’
It is one of the major components of the thermal
power plant.
Two categories of boiler
I. Fire tube boiler
II. Water tube boiler
CFBC BOILER
ECONOMIZERS
TURBINE
The steam turbine it self is a device to convert the heat in steam to
mechanical power.
1. HIGH PRESSURE
2. INTERMEDIATE PRESSURE
3. LOW PRESSURE
L.P
I.P
H.P
S.HEATER
R.H.
GENERATOR
Cooling Tower
•Cooling towers are
heat removal devices.
•Capacity of cooling
tower in BARSINGSAR
PLANT is 2000 mΛ3.
SWITCH YARD
Switch Yard consists of two generating transformers (GT) of 250
MVA each.
BIKANER
NAGAUR
KHINWESAR
FALAUDI
CONCLUSION
This Power plant provided me the Learning
Environment and Opportunity that I could make
my training Successful and I could make my
concepts more sharp.
The End