Beruflich Dokumente
Kultur Dokumente
OF THE
PHILIPPINES (PD 1096)
and its IRR
EXEMPTIONS
REPAIR WORKS
EXEMPTIONS
REPAIR WORKS
ARCHITECTURAL DOCUMENTS
c. Plans and specific locations of all
accessibility facilities of scale of at least 1:100
ARCHITECTURAL DOCUMENTS
e. Fire Safety Documents
ARCHITECTURAL DOCUMENTS
general design and
types of construction
construction req. load
occupant
evaluates
req. of Fire Zones and Fire
structural design req. of opening
glazing
evaluates
building/structure
Resistive Regulation
excavation,foundations,
building/structure
documents as to
evaluates
architectural accessibility features
building
retaining projection over public streets
documents
compliance aswalls
to and ventilation
tolight
building/structure the
evaluates
compliance
prefab
technical access
to streets/roads
the
construction
requirements and alleys
documents as to
building/structure
evaluates
technical construction
architectural
requirements and of buildings/structure
interior design
for
compliance
protection Electrical
documents toas
building/structure
and the
to
safety
verifies lot plan
buildings and other ancillary
technical for Mechanical
Regulations
requirements
compliance
documentsclassifications
to the
requirements
as to and general req.
check
under
technical compliance
Regulations
the Sanitary
requirements to establish
structures within easements
compliance maximum
to
abatement/demolition the height
determines
Engineering
under the Lawgrades
parking
Plumbing
technical requirements (RA
cemeteries
and loading/unloading
and memorial space
parks re
Verifies
Law (RAthat plastics
1364)
atleast
1378)
corner one side
buildings withof chaflan
the
signs to a street or alley
lot has direct access
ISSUANCE OF BUILDING
PERMITS
suspended or abandoned at
anytime after it has commenced
for a period of 120 days
NON-ISSUANCE, SUSPENSION
AND REVOCATION
1.Errors found in plans and specifications
2.Incorrect or inaccurate data supplied
3.Non-compliance with the provisions of the
Code
4.Unauthorized change in plans & specifications
5.Failure to hire an architect or engineer to
inspect during construction & to keep logbook
Notice of non- issuance, suspension or revocation of
building permits shall always be made in writing,
stating the reason or grounds thereof
APPEAL
filing of an appeal shall be within 15 days
from the date of advice of the non-issuance,
suspension, revocation of permits
Yes! >:D