FILLING PROCESS
Filling Process is a step filling product (Liquid) to a
packaging
1. Flow
Process

2. Quality
TOPICS
4. Suggestion
for Parameters
Improvement and testing

3.
Production
Capacity
1. Carton erector CONTROL POINT

1. Flow 1. Bottom Sealer (OK), box not dented and crack.


Process 2. Bag Inserter by Human
2. Ensure no crease at plastics in the box, and ensure
there is crease at plastics outside of the box. And
then ensure bottom sealer plastics (OK), and no
3. Filling Machine foreign materials in plastics.`

4. Top Sealing 3. Filling temperature (OK), and not watery. No dirt


stuck on filler nozle.

4. Seal time, seal temperature, and transportation


time has been appropriate.
No
5. Check
Weigher 5. Gross Weight has been appropriate.
Reject
Yes

6. Inkjet Print (production code) has been


6. Inkjet Print appropriate according to our standard.

7. Carton Sealer 7. Carton sealer (OK), there’s no gap.

8. Metal Detector has worked well. Make sure daily


No test with use test piece before running MD.
8. M. D

F. G Reject
2. Quality
Parameters
and testing

1. Leak pressure test 2. Penetration test 3. Nitrogen (N2) Verification


3. Production
Capacity

CAPACITY
NO LINE PRODUCT
(TON/Day)
1. 1 Lauric 72

2. 2 Palmatic 84

3. 3 Lauric 120

4. 1A BIB 38.4 – 72

Note : Capacity with assumption that 24 hour production


No. SUGGESTION PICTURE