Beruflich Dokumente
Kultur Dokumente
w w w. d a r - e n g i n e e r i n g . co m
1
POWER SYSTEM INTERCONNECTION AND
RELIABILITY
2
CONTENTS
1) Reliability
2) System Planning Criteria
3) Power Transmission Technologies
4) System Studies
5) Transmission System Improvement
6) Advanced Transmission Technologies
7) Planning Methodology
8
HIGHLIGHTS
9
RELIABILITY
IMPORTANCE OF RELIABILITY
10
SYSTEM PLANNING CRITERIA
GENERATION
TRANSMISSION
11
POWER TRANSMISSION TECHNOLOGY
AC
HVDC
12
POWER TRANSMISSION TECHNOLOGY
AC
HVDC
13
POWER SYSTEM
STUDIES
3/16/2018 14
POWER SYSTEM STUDIES
PERFORMED - 312
GENERAL STUDIES (LOAD FLOW, SHORT CIRCUIT,
160
MOTOR STARTING) - 45 GS
140
POWER PLANT STUDY & INTERCONNECTION STUDY
(TRANSIENT STABILITY, LOAD SHEDDING, GENERATOIN
120 REJECTION, ISLANDING, BUS TRANSFER ETC)
-9 PPI
100
RELAY SETTING & COORDINATION STUDY - 61 RCS
HARMONIC MEASUREMENT & ANALYSIS -10 HAS
No. of Projects
80
PF IMPROVEMENT STUDY - 4 PFCS
60
SWITCHING & INSULATION COORDINATION STUDY - 146 ICS
40
NEUTRAL GROUNDING EQUIPMENT STUDY - 20 NGR
20
TRANSIENT RECOVERY VOLTAGE - 5 TRV
INDUCED VOLTAGE ON PIPE LINE - 1 IVS
0 RENEWABLE SOLAR PV-1 RSP
GS PPI RCS HAS PFCS ICS NGR TRV IVS RSP EEFA PMOA STATS
No. 45 9 61 10 4 146 20 5 1 1 4 5 1 ELECTRICAL EQUIPMENT FAILURE ANALYSIS-4 EEFA
PROTECTION MIS-OPERATION ANALYSIS-5 PMOA
STATCOM STUDY -1 STATS
3/16/2018 15
NATIONAL
GRID CODE
REQUIREMENT
STUDY
GENERATION
OPERATION GENERATOR
STUDIES AUXILLARY
SYSTEM
STUDY
GENERATION
SEGMENT
EQUIPMENT EQUIPMENT
DATA SIZING
VALIDATION
RENEWABLES
/SPECIAL
STUDIES
16
FEASIBILITY NETWORK
PLANNING
STUDIES STUDIES
LINE AND
T&D CABLE
SEGMENT PARAMETER
CALCULATION
RENEWABLE OPERATIONAL
INTEGRATION STUDIES
17
EQUIPMENT
STUDIES
BASIC STUDIES
REINFORCEMENT
STUDIES
SAFETY STUDIES
GRID CODE
UTILITY STUDIES REQUIREMENT
18
Key/Significant/Major Power System Studies for Integration of Power
Generation with SEC Transmission Network
Complete Power System Studies of JAZAN power plant (EPC-4) package including
integration to SEC system.
Feasibility Study for 100MW solar plant interconnection with SEC grid in Tabuk Area
Power System Studies for interconnection of 4x730 MW Rabigh-II Power Plant to SEC grid
Conducted Load flow, short circuit, and transient stability studies using PSS/E
software.
Power System interconnection studies for Ras Al Khair Power and Desalination Plant-
Phase1
Conducted Load flow, short circuit, Motor starting, transient stability, and Bus
Transfer studies using ETAP software.
Transient stability, Load Flow, Short circuit, Motor starting, Relay setting studies.
Power system studies for Saudi Electricity Co, Sharurah Power Plant.
22
Transient stability, Load Flow, Short circuit, Motor starting, Relay setting studies.
Key /Significant/Major Power System Studies for Transmission Network
Consulting services: Defining out-of-step relay setting on 380kV connection
in WOA, COA and SOA – Transmission Systems.
Involves nation wide interconnected SEC network operation and
analysis is done using PSS/E software. Recommended settings already
implemented by SEC.
Technical investigations and ferro resonance study for Saudi Aramco Abqaiq
substation
23
KEY Projects
Details_Executed
SYSTEM STUDIES
4.Power System Studies for interconnection of 4x730 MW Rabigh-II Power
Plant to SEC grid
Job Details
Power System modeling using PSS/E software of the Power
Plant & SEC network for the year 2014 & 2016.
Load flow studies for the system intact condition under Peak
load and Off-peak load operating scenarios.
Contingency analysis to ensure system security under N-1 &
N-2 conditions.
Short circuit study to ensure the adequacy of the circuit
breakers.
Transient stability studies for different operating scenarios,
system disturbance conditions and contingency conditions.
Verification of PSS, Governor, Exciter and Generator
parameters.
Studies Performed
Load Flow
Short Circuit
Transient Stability
PSS Tuning
30
Dynamic Stability study for Rabigh-II Power Plant
Figure 3
Power System Studies for interconnection
of 4x730 MW Rabigh-II Power Plant to SEC
grid
31
Dynamic Stability study for Rabigh-II Power Plant- (PSS Tuning & Parameter Validation)
32
Dynamic Stability study for Rabigh-II Power Plant
33
5.Consulting services: Power System Studies for 2400 MW Combined Cycle
Power Plant & Desalination Plant
Job Details
Assessment of the impact of 2400 MW power plant operation along with
Ma’aden aluminium smelter in Grid Islanded mode by conducting Potline
startup and Potline re-start studies.
Studies to assess the response of power plant with variation in smelter
load and water production (Load shedding and generation rejection).
Assessment of response of power plant to grid disturbances.
Equipment Validation for 380kV substation and 13.8kV MV network of
Power plant, desalination plant and pumping station.
Motor starting
Automatic bus transfer studies.
Studies Performed
Load flow, short circuit, Transient stability, motor starting studies, bus
change-over studies, Insulation co-ordination, Ferro-resonance, transfer
surge analysis and circuit breaker TRV studies.
34
Generation Rejection Studies for Ras Al Khair Power Plant
35
Generation Rejection Studies for Ras Al Khair Power Plant
• SEC 1000 MW load with 1200 MW Smelter Load Rejection (Voltage)
A nalog Graph
V OLT 31302 [RA Z A L KHA IR380.00]
1.0450
1.0400
1.0350
1.0300
Voltage (pu)
1.0250
1.0200
1.0150
1.0100
1.0050
1.0000
V OLT 31290 [MA A DEN 380.00]
1.050
1.040
1.030
Voltage (pu)
1.020
1.010
1.000
0.990
x 0.0 2.0 4.0 6.0 8.0 10.0 ...
...
...
A nalog Graph
V OLT 31302 [RA Z A L KHA IR380.00]
1.060
1.040
1.020
1.000
Voltage (pu)
0.980
0.960
0.940
0.920
0.900
V OLT 31290 [MA A DEN 380.00]
1.060
1.040
1.020
1.000
Voltage (pu)
0.980
0.960
0.940
0.920
0.900
x 0.0 2.0 4.0 6.0 8.0 10.0 ...
...
...
36
10. Feasibility Study for interconnection of 100 MW PV Solar Plant in Tabuk
Area
Job Details
Preliminary environmental assessment studies
Identifying constraints regarding local municipality approval
highlighting the safety regulations of KSA for setting-up the
PV plant.
Identification of nearest existing grid station (115kV or
380kV) and assessment of available transformation capacity
for evacuation for Power Evacuation
o Assessing the possibility of reinforcement/strengthening
of the existing station to evacuate the power from the
proposed PV solar plant.
o Developing preliminary power evacuation plan for
interconnection of PV solar plant to SEC grid.
o Assessment of approximate route length of the
transmission line from the interconnection substation
of the SEC grid substation.
Preparation of broad cost estimation for the proposed
interconnection substation, transmission line and
reinforcement of SEC/NG-SA grid station.
41
100 MW SOLAR FEASIBILITY STUDY
42
15.Defining out-of step relay setting on 380kV connection in WOA, COA and
SOA – Transmission Systems.
Job Details
SEC network model analysis using PSS/E software
Performed Loss of synchronism study between interconnected power system for
power system contingencies (Power system faults, Loss of Generation & Line
switching).
Performed Loss of synchronism study between generators and rest of the utility
system for power system contingencies (Power system faults, Loss of Generation
& Line switching).
Identified Out of step situation.
Provided Relay setting for Identified Out of step situation.
Power system Transient performance validation after Out of step operation and
system spilt by performing Transient stability studies.
Studies Performed
Load flow
short circuit,
Transient stability and
Voltage stability study
OOS protection setting calculations.
47
OOS for complete SEC Network
49
OOS for complete SEC Network
Response at Region 3 end in the event of 3 PH fault on the Response at Region 2 end in the event of 3 PH fault
region3 line on the region3 line
OSS Protection
Disabled
OSS Protection
Disabled
Response at Region 3 end in the event of 3 PH fault Response at Region 2 end in the event of 3 PH
on the region3 line fault on the region3 line
OSS Protection
Enabled
OSS Protection
Enabled
50
OOS for complete SEC Network (System Response)
OSS Protection
OSS Protection Disabled
Disabled
51
Projects
On going
SYSTEM STUDIES
2. JAZAN IGCC POWER PLANT: ELECTRICAL POWER DISTRIBUTION AND INTERCONNECTION
• DAR Solution: DAR’s signature are present on complete facility right from power plant to power
evacuation and grid connection
The scope included:
Power system studies like Load flow, Short Circuit , motor starting, harmonic analysis , relay
coordination study and Arc Flash Analysis.
PSS/E model development and Transient stability with plant grid-connected and islanded
modes
Insulation Coordination and TRV studies for 380kV, 230kV and 132kV voltage levels connected
to the IGCC
Integration of all the EPC packages with the EPC-4 package.
Black start study.
Generator PSS tuning.
54
POWER SYSTME SIMULATION SOFTWARE
•Load Flow, Short Circuit, , Motor Starting Study, Transient Stability, Harmonic Analysis, Relay-setting
ETAP Calculation and Arc Flash Studies.
• Electro Magnetic Transient Analysis Studies like Switching, Lightning, Ferro-Resonance, TRV & VFTO.
PSCAD
• Electro Magnetic Transient Analysis Studies like Switching, Lightning, Ferro-Resonance, TRV & VFTO.
EMTP-
RV
• Complex studies like Planning Studies, Transient Stability Study, Out-of-step Study and PV-QV Analysis for
PSSE wide networks.
68
Quality Policy and Certification
3/16/2018 69
SELECTED CLIENTELE ACROSS THE MARKET SECTORS
70
Thank you
71