Beruflich Dokumente
Kultur Dokumente
Gozar
DESIGN AGAINST THE ELEMENTS
EDUCATION REGISTRATION
June 1989 – March 1994 PRC License no. 0012936
Arch. Dale Jose C. Gozar
B.S in Architecture UAP Member
Introduction University of Santo Tomas Makati Chapter (In-active)
I am Building Architect at Chiyoda Philippines - a Japanese Petrochemical (Oil & Gas)
Engineering company. Basically I am task to do building projects with high level of strength,
quality, safety standards and precautionary measures (such as Safe-Haven, Blast Resistant
and Modular Buildings). AIR FIRE
Current Project involved • Typhoons/Cyclones • Fire
• Tornado • Heat Wave
Ichthys LNG in Darwin, Australia • Sand Storms • Wild Fire
Previous Project s involved • Gas Leak • Lightning
• Chemical Attack
Sakhalin LNG in Sakhalin, Russia
QatarGas II (QGX) in Qatar
RasGas (RGX) in Qatar
Al-Khaleej Gas (AKG) in Qatar
Pearl GTL (QPG) in Qatar WATER EARTH
• Heavy Rain/Flood • Quakes
PNG LNG in Papua New Guniea • Storm Surge • Landslide
TMP Project in Malaysia • Tidal Wave • Erosion
• Hale Storm • Sink Hole
In 2009 my family also was victim of
Typhoon Ondoy wherein I almost
died trying to rescue my wife & kids
Preliminary Judging & Exhibit at
QUEZON CITY HALL – December 2010
Renzo Michael
(Consultant) Sean Matthew
(Researcher)
Ma. Theresa
(Secretary) Ma. Theresa
(Secretary) Renzo Michael
Sean Matthew
(Researcher) (Consultant)
by Arch. Dale Jose C. Gozar
by Arch. Dale Jose C. Gozar
by Arch. Dale Jose C. Gozar
by Arch. Dale Jose C. Gozar
by Arch. Dale Jose C. Gozar
by Arch. Dale Jose C. Gozar COMMUNICATION
To avoid panic, looting & chaos–it is necessary to convey
messages/instructions BEFORE, DURING and AFTER any
disaster. It is also vital to receive/transmit information &
news in the community in times of crisis. And to warn
occupants of impending danger. Hence, the following items
are highly recommended:
PA/GA System - allows emergency page or
Community Alert / Warning System announcements via any speaker-equipped street light.
(Blue, Yellow, Red & all Clear) Alarm or Siren - warning device incase of Flooding,
The aim is to warn the community of Storm Surge, Tidal Wave, Fire and Earthquake.
danger and provide safety advice at Satellite Phone & Radio Base Station–enables local
various stages during the approach of: officials (mayors/governors) to communicate with our
Tropical Cyclone national government.
Heavy Flooding
Storm Surge / Tsunami
Notification System
via public/barangay bulletins
via media (AM/FM Radio, TV,
Newspaper, etc.)
via web/NETizen/social media
via SMS or Texting
by Arch. Dale Jose C. Gozar STRUCTURAL MATERIAL
Reinforced Concrete is preferred material for Column,
Beam, Slab, Foundation, Road Paver and pavements
because of the following advantages:
From book Design of Reinforced Concrete
“It has considerable compressive strength and are very
rigid against strong WINDS & EARTHQUAKE. It also
has great resistance to FIRE & WATER and in fact is the
BUILD BACK BETTER RIGHT best material available for situations where water is
INVEST 1st on FIRMATAS - never present.
reduce/undersize/substitute on It is a Low Maintenance material and has very Long
the ff: Service Life. Strength of Concrete does not decrease w/
• Foundation & Footing
time actually increases over long period (years) due to
• Column, Beam & Slab
• Reinforcement Bars
the lengthy process of the solidification of the cement
• Spacing/Lapping of Re-Bars paste.
• 50-75mm. It is usually the only economical material available
Conc. Cover because of the inexpensive indigenous materials (sand,
gravel, and water) and requires relatively small amounts
of cement and reinforcing steel.
In addition, a lower grade skilled labor is only required for
construction."
(see my suggestion for NHA Proposal)
by Arch. Dale Jose C. Gozar GRADING FOR ECONOMY
To keep Finished Grade as closed to Natural Grade as possible.
The amount of CUT & FILL is targeted to be balanced over the
site except for the 2m Elevated Road & Community Center 3m.
- Earthquake
- Volcanic Eruption
- Cyclone/Typhoon
- Tornado
- Flooding
- Storm Surge Cyclone
- Landslide
"A leader is best when people barely know he exists, when his
work is done, his aim fulfilled, they will say: we did it ourselves."
- Lao Tzu