OptiX RTN 900

Pre-configuration Tool
Operation

www.huawei.com

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved.


Foreword
 This slides describe the application scenarios and operation
procedures of USB flash drive commissioning.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page2
Objectives
 Upon completion of this course, you will be able to:
 Understand pre-configuration principle

 Outline pre-configuration application scenario

 Perform the pre-configuration operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page2
Contents
1. USB Commissioning principle

2. Site deployment flowchart

3. Pre-configuration

4. On site operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page3
Contents
1. USB Commissioning principle

2. Site deployment flowchart

3. Pre-configuration

4. On site operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page4
USB Commissioning Principle

Site
Deployment

Board
Restoration
replacement
USB flash drive
Commissioning
Software
Backup
Upgrade

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page5
Contents
1. USB Commissioning principle

2. Site deployment flowchart

3. Pre-configuration

4. On site operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page6
Site Deployment Flow Chart

Offline Generate
Configuration Script files Copy to USB On site operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved.


Contents
1. USB Commissioning principle

2. Site deployment flowchart

3. Pre-configuration

4. On site operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page8
Pre-configuration files
 Authentication file
 The RTN.CER file stores the administrator-level
user names and MD5/SHA256/PBKDF2-encrypted
passwords of these users.

 Configuration script
 The usbcfg.cmd stores the NE basic configuration
data and service configuration data.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page9
Generating Configuration Script File
 Flow chart
Create pre-
configuration files

Convert pre-configuration
files into scrip file.

Generate the
scrip file

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page10
Create pre-configuration files(1)
 Open the pre-configuration sample files.
 There are two pre-configuration samples:
NEBasic&DCN Sample.xls is necessary

Ethernet Service Sampl.xls is optional

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page11
Create pre-configuration files(2)
 Configure the NE basic parameters.
 Open the 1-NEBasic&DCN Sample.xls. Select NE Basic Info
sheet and configure the NE Basic parameters according to the
network planning.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page12
Create pre-configuration files (3)
 Configure slots and boards parameters
 Select Board Info sheet > click Generate Board Info From
Sheet[NE BasicInfo] and configure the Boards for each NE
and slot.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page13
Create pre-configuration files(4)
 Configure MW Link parameters
 Select Link Info (Non-XPIC) sheet > click Generate Link Info
From [Board Info] and configure the Link parameters for each
NE and slot.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page14
Create pre-configuration files(5)
 Configure MW Link parameters(cont.)
 Step3(cont.): Configure the Link parameters for IF board.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page15
Create pre-configuration files(6)
 Configure DCN parameters (Optional)
 Select DCN sheet and fill in the parameters according to the
network planning.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page16
Convert pre-configuration files into
scrip file
 Flow Chart

Start pre-configuration Tool

Import Excel file

Export
script

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page17
Convert pre-configuration files into
scrip file
 Start Pre-configuration Tool
 Open the Pre-configuration Tool program by clicking
ConvertorEx.exe

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page18
Convert pre-configuration files into
scrip file
 Import pre-configuration excel file into Convert tool

 Click choose excel file path Icon. Click Browse button to choose pre-
configuration excel templates and click Import.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page19
Convert pre-configuration files into
scrip file
 Perform convertor tool to generate pre-configuration script

 Choose NEs and click Export scripts Icon > Choose USB in the
Application Scene tab, and click Export button to Generate Scripts.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page20
Generate Authentication file
 Perform Pre-configuration Tool to generate Authentication file

 Click Generate Certificate icon and specify User Name, Password


and Algorithm values. Click Browse to select the Output Path for
the authentication file.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page21
Contents
1. USB Commissioning principle

2. Site deployment flowchart

3. Pre-configuration

4. On site operation

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page22
Copy pre-configuration file to USB
flash drive
 USB flash drive must meet the following requirements:

 Capacity: not less than 1 GB.

 Model: 4 GB Netac U208 is recommended.

 Format: FAT32

 Others: The USB flash drive must not have additional functions
(include but not limited to: encryption, antivirus, automatic guide,
and smart phone.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page23
Copy pre-configuration file to USB
flash drive (cont.)
 Copy Authentication file & Script file to the root
directory of USB flash drive.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page24
On site configuration
 After the USB flash drive is prepared, insert the USB flash
drive into the USB port to perform the NE initialization.

Positions of the USB port and the USB indicator on the OptiX RTN 900

USB Indicator on the NE Commissioning Status Operation


Blinking yellow at a 300 ms The data in the USB flash drive is Wait for the end of commissioning.
interval being checked or being processed.
Steady green (more than 10s) The commissioning succeeds. Plug out the USB flash drive to end the
commissioning.
Steady red (more than 10s) The commissioning fails. Plug out the USB flash drive to perform
troubleshooting.
Blinking red at a 300 ms interval Hardware fault occurs and USB Plug out the USB flash drive to perform
flash drive initiating fails. troubleshooting.
Off (less than 5 minutes) The NE is restarting. Wait for the end of commissioning.
Off (more than 5 minutes) Hardware fault occurs and the USB Plug out the USB flash drive to perform
flash drive cannot be detected. troubleshooting.
Status of the USB indicator on the NE

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page25
Questions
 Please outline the site deployment flow chart.

 What is the procedure of pre-configuration?

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page26
Summary
 Introduce the typical application scenario of RTN900 pre-
configuration.

 Describe the procedures of the RTN900 pre-configuration.

Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved. Page27
Thank you
www.huawei.com