Sie sind auf Seite 1von 23

> Evo Controller 8000 Updates

> Introduction
Evo Controller 8000 Agenda

1. Evo Controller Roadmap


2. Evo Controller 8100 / BSC
3. Evo Controller 8200 / RNC
4. Evo Controller 8100 / Multi
5. Evo Controller 8200 / BSC
6. Evo Controller 8200 / Multi
7. FUTURE
>EVO Controller Roadmap
EVO Controller Roadmap
Evo Controller RNC 3820
8200 / RNC expansion with Evo Controller
20 Gbps* Evo Controller 8200 / RNC
W11B 8200 / RNC Higher capacity
RNC 3820 R1.1
5 Gbps* RNC 3820 R2 ATM support Evo Controller
W10B 8 Gbps*, W11B W12B WCDMA
8200 / RNC
30-50 Gbps*
Evo Controller Evo Controller New capabilities
8100 / Multi 8200 / Multi e.g. DPI and
G10B+W11B G12B+W11B Caching

Evo Controller GSM


Evo Controller Evo Controller Evo Controller
8200 / BSC 8200 / BSC
8100 / BSC 4095 TRX
8200 / BSC
4095 TRXs 8192 TRX Higher capacity
G12B
G10B
TDM support
G12B

11A 11B 12A 12B 13A Future

2011 2012 2013


Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Released Ready for Contract Indicative Candidate * Ericsson traffic model


>EVO Controller
8100/BSC
EVO Controller 8100/BSC Secure Your
GSM investment
> EVO controller 8200 /
RNC
EVO Controller 8200
A compact multi-standard controller
EVO Controller 8200 / RNC W11B
› Evo Controller 8200 › Capacity
– 20Gbps Iub throughput
› HW prepared for 50Gbps
› Connectivity
EPB (Evo – Up to 768 RBSs
EPB
– Up to 2304 cells
Processing Board) › HW prepared for 20000 cells
› Supported peak-rates
EPB Ethernet switches – 100 Mbps
(SCXB and CMXB) › HW prepared for >168 Mbps
› Power consumption
EPB – Less than 7.0kW for max config.
› Size
– 600x400x1800 [mm] WxDxH
Active patch panel › External interfaces
(APP) – 8x10 GE ports with APP
or Cabinet switch
(CAX)
EVO Controller 8200 / RNC W12B
› Evo Controller 8200 › Capacity
– 20Gbps Iub throughput
› HW prepared for 50Gbps
› Connectivity
EPB (Evo – Up to 6 000 RBSs
EPB
– Up to 20 000 cells
Processing Board)
› Supported peak-rates
EPB Ethernet switches – 100 Mbps
(SCXB and CMXB) › HW prepared for >168 Mbps
› Power consumption
EPB – Less than 7.0kW for max config.
› Size
– 600x400x1800 [mm] WxDxH
Active patch panel › External interfaces
(APP) – 8x10 GE ports with APP
or Cabinet switch – Optional: 8 ports STM-1 or 8 ports OC-3
per EvoET board
(CAX)
> EVO controller 8100 /
Multi
EVO Controller 8100
From 8100/BSC to 8100/Multi

RNC CMXB

BSC

BSC
BSC EPB magazine + CMXB BSC
boards

Evo Controller 8100 / BSC Evo Controller 8100 / Multi

Use empty magazine to add RNC


functionality in Evo Controller 8100 / BSC
>EVO Controller
8200/BSC
EVO Controller 8200/BSC status

› Ongoing
– BSC applications are running
on the multicore EPB1
– Verification started
› Next
– First integration of EVO-ET
› Availability
– FOA and GA in Q2-12
> EVO controller 8200/
Multi
EVO Controller 8200 /Multi
A Flexible controller

› Allows high flexibility


between GSM and
WCDMA on magazine
level
› More compact building
practice
› Optimized for All-IP
› One OSS
>EVO Controller
Future
EVO Controller 8200 / RNC W13 -W14
› Evo Controller 8200 › Capacity
– 100 - 150Gbps Iub throughput (EPB2)
– RNC in Pool step 1&2
› Connectivity/RNS
EPB (Evo – Up to 96 000 RBSs
EPB
– Up to 320 000 cells
Processing Board)
› Supported peak-rates
EPB Ethernet switches – > 168 Mbps
(SCXB and CMXB)
› Power consumption
EPB – Less than 10.0 kW per node
› Size
– Up to 16x 600x400x1800 [mm] WxDxH
Active patch panel › External interfaces
(APP) – 4x10 GE 3x40 GE ports with CAX
or Cabinet switch – Optional: 8 ports STM-1 or 8 ports OC-3
per Evo-ET board
(CAX)
RNC in pool Roadmap
Step 1 in W13A:
• Max no: supported node members is 2
(RNC 3820 & Evo Controller 8200/RNC)
• Increase the capacity within same RNS - avoid split of the RNS
• Redistribution of Iub links or cells between member nodes
supported by OSS-RC wizards

Step 2 in W14 - Increase RNS capacity:

• Max no: supported node members is 16


• Node redundancy
• Automatic distribution and re-distribution of Iub links over the node
cluster
• Load balancing between pool cluster members

Step 3 in W15 - Increase RNS capacity


• Max no: supported node members is 32
Evaluation

When clicking ”next” you will be directed to an


EriColl page.
It is important that you fill in the form and click
OK. This will register your successful attempt.
Finish by clicking on the “next” button.
Feedback

You are redirected to an


EriColl page.
Please wait!

Das könnte Ihnen auch gefallen