Sie sind auf Seite 1von 15

HOMEWORK 2

ADVISOR : Prof. LY HAV

STUDENT : VANN PISITH


HOMEWORK : WEEK 2

I. Presentation about your outline and planning.

II. Presentation about bibliographies.

III. Name your thesis topic.

IV. Presentation about site construction technologies in your topic.

1
I. Presentation about your outline and planning.

- Outline
1. Architecture
o Describe about building function from the basement to
the roof.

o Describe about building geometry. Section of structural


element.

2
1. Presentation about your outline and planning.

- Outline
2. Load ( EUROCODE : 1991 )
- Load on slab
- Load combination

3
1. Presentation about your outline and planning.

- Outline
3. Concept of design
- Using Euro code 2
- Concept of pre-stressed concrete
- Concept of designing slab
- Concept of Limit state

4
1. Presentation about your outline and planning.

- Outline
4. Design Post Tension Slab with band beam
- Material :
Concrete
Tendon
Rebar
- Allowable stress
- Pre-stressing Loses

5
1. Presentation about your outline and planning.

- Outline
4. Design Post Tension Slab with band beam
- Verify condition
- À la mis en tension
- Sous combination rare
- Sous combination quasi-permanent
- Verify in ultimate limit state
- Verify Punching shear

6
1. Presentation about your outline and planning.

- Outline
5. Result and Conclusion
- Planning
14-June-2018 : Must completely finish first draft of thesis. Here is the plan of 77 days !
* Now-KNY : Architecture & Loads
* 19-April => 30-April : Concept of Design
* 1-May => 31-May : Design PT Slab
** 1-May => 7-May : Model
** 8-May => 21-May : Verify SLS
** 22-May => 31-May : Verify ULS
** 1-Jun => 7-June : Verify punching shear
* 7-June => 14-June : Checking Works
6. Site technologies
7
3. Name your thesis topic.

Topic Name :

“ Étude de la dalle en béton précontrainte ”

“ កាសិក្សាក្សំរាលខណ្ឌបេតុងបរេក្សុងររំង ”

8
4. Presentation about site construction technologies of your
thesis topic.

The are 4 stages to complete a PT slab installation :

9
Tendon Installation Concreting

Stressing 10 Grouting
Lay 10mm rebar Duct and Strands work

Tendon Installation : After we prepared the


scaffoldings and formworks.
- we lay bottom rebar (∅10 or ∅12).
- Lay ducts in positon and push strands in.
- Set up stressing anchorage component

11
Cleaning

Concreting

Cure Concrete
12
Stressing Grouting

13
Bibliographies

Das könnte Ihnen auch gefallen