Sie sind auf Seite 1von 34

Kraft Information Systems

Stability Studies
Overview, Setup, Setup, Creation,
Special Scenarios and Opportunities

August 2009

1
Kraft Information Systems

Agenda

• Definition & Process


• Roles & Responsibilities
Overview • Transaction view

• Stability Study
• Begin, Record Results, Finish
End to End
Scenarios • Cancel

• Material Master
• Inspection Plan
• Strategy
Master
Data Setup • Linkages
• Building Blocks

• BI
• ECC
Reports

2
Kraft Information Systems

Background

Stability Study:
• The objective of a stability study is to determine the shelf-life, the
time period of storage at a specified condition within which the
product still meets its established specifications.

The business need for stability studies:


– Consumer Products Industry
• Expiry date determination
• Keeping quality tests of daily production batches
• Retest samples (in case of complaints)

3
Kraft Information Systems

Stability Study
Roles & Responsibilities
Catalyst
ADT/Deployment Initial Setup
Team

Stability Study Plant Lab


Creation Team

Maintenance QM Master
Data
Steward

4
Kraft Information Systems

Setup Stability Study


Overview

Create Create
Material
Inspection Strategy Linkages Building
Master
Plan Block

5
Kraft Information Systems

Setup Stability Study


Transactions
SAP
Plant Competency Plant
Center

Create Inspection
Plan CBWBQM
•MM02 Insp Types: QP01
•16, 1601, 1602,
•Insp Plan,
Z89NA006
•Strategy (Header)
•Maint. Package
(Operation)
QST09
MM02 Strategy IP11
Create Building Block

6
Kraft Information Systems

Setup Stability Study Steps

1. MM02
1. Inspection Types – 16, 1601, 1602, Z89NA006
2. QP02 – Create Inspection Plan
3. IP11 – Strategy
4. CWBQM – Inspection Plan, Strategy (Header), Maint. Package
(Operation)
5. QST09 – Create Building Block

7
Kraft Information Systems

Material Master
MM02
Inspection type setup for stability studies in the material master:
16, 1601, 1602, Z8NA006

8
Kraft Information Systems

Create Insp Plan


QP01
Task list for Stability Study
Inspection Plan Group Y* for
Stability Studies

Naming convention:
Y+plant+XXX where XXX is the
shelf life padded by leading 0.

9
Kraft Information Systems

Strategy
IP11

10
Kraft Information Systems

Strategy
IP11

11
Kraft Information Systems

Create Linkages
CWBQM

12
Kraft Information Systems

Building Blocks
QST09

13
Kraft Information Systems

Material Master

14
Kraft Information Systems

Create Stability Study

The end user process for day to day creation of stability studies.

Create Create Initial Create Initial


Notification Sample Inspection (Opt)

• [Notes] • [Notes] • [Notes]

15
Kraft Information Systems

Create Stability Study


Transaction QM01

Type QM01 and enter or


Select from Favorites
Kraft Information Systems

Enter QT.
Press enter.
Kraft Information Systems

1. Select the Stability Study


BB. This is the shelf
life/SLED of the sample:
- Y90
- Y95
- Y100

2. Enter:
• Cycle Start (Day sample
was produced)
• Material number
• Plant number

3. Click check
mark/enter
Kraft Information Systems

1. Enter batch number

2. Enter Description
3. Enter
• Room temp
• Meat temp
• Type of sample
(routine, ext
runs, etc)
Kraft Information Systems

1. Click on create
initial sample

2. Notification/ Lab
number can be
viewed
Kraft Information Systems

CLICK on Initial
Test Inspection Lot
Creates an inspection lot
for immediate results recording

1. Click on
specify storage
conditions

2. Click on
perform test
scheduling
Kraft Information Systems

1. Click on start
study

If the printout does not work, write the


Batch# on the box with a marker.
Kraft Information Systems

Hit the save button


Kraft Information Systems

Other Scenarios
Cancel
• When you want to stop a study
– Method one:
– Inspection lot with results, reject, defect, cancel study
– Method two:
– Cancel without results

24
Kraft Information Systems

Cancel
Method 2: No results ever recorded
• Only use this method if no inspection lots were created yet for
the study
• If cancelling after initial inspection lot, do it from usage decision
of initial inspection lot.
• If results have been entered on an initial lot or more use the
previous method to do so with a usage decision - there is a
special UD for cancelling which will record the reason why the
study was canceled.

25
Kraft Information Systems

QM02 – Cancel Stability Study

Type in QM02 and Enter, or


Select from Favorites
Kraft Information Systems

Type in Notification
number

NOTE: To view Notification number go to: QM11


transaction, fill in Notification Date, Notification
type and Material # (if known), then click execute
to view Notifications
Kraft Information Systems

Click on Notification box


Kraft Information Systems

Under Action
box, click on
Cancel Study
Kraft Information Systems

1. Click Yes
Kraft Information Systems

1. Click on the Save icon

2. The Study status is now


indicated as canceled as
displayed next to the blue
exclamation mark.
Kraft Information Systems

Other Scenarios
Age Based Dynamic Specifications
• 8333 Kirksville Example
• Different specifications based on age of sample

32
Kraft Information Systems

Reports

BI Reports
• X
• X

ECC Reports
• X
• X

33
Kraft Information Systems

Suggested Improvements

• X

34

Das könnte Ihnen auch gefallen