PARTIAL DISCHARGE

When high voltage insulating material


breaks down Partial Discharges are
created, measured in units of charge
known as pico-Coulombs or millivolts.
IQ Services

WHAT IS PARTIAL
DISCHARGE?
• Electrical discharges occurring inside medium and
high voltage insulation (flaws, cracks, voids,
irregularities).

• These imperfections create voltage stresses and


cause eventual failure of the insulation.

• Insulation failures begin with and are characterized


by small but detectable releases of energy or Partial
Discharge.
IQ PARTIAL DISCHARGE
Services

TESTING USED FOR QUALITY


ASSURANCE
• For many years partial discharge testing has been
an IEEE/ANSI standard to identify insulation
problems in electrical apparatus before it leaves
the factory floor.
• Many U.S. and International standards have been
developed for partial discharge testing.
• Until recently Partial Discharge testing was
limited to testing at manufacturer’s laboratories.
• Now computers and sophisticated equipment can
isolate and detect Partial Discharge occurrences in
the field.
IQ Services
IQ Services

NO OUTAGE EVALUATION
These proven technologies exist today to evaluate medium or
high voltage systems while the system is energized.

1. Oil testing/DGA – limited to oil transformers


2. Infrared testing – visible loose connections only
3. Visual inspections – problems may not be visible
4. Power Quality – cannot detect insulation failures
5. Vibration – limited to motors and transformers
6. Partial Discharge Testing – single best all-around test
IQ Services
PARTIAL DISCHARGE
VS. INFRARED

How are Partial Discharge Inspections


different from Infrared Inspections?
• Infrared identifies electrical current problems (loose
connections) that result in heat. The specimen must be
visible to the naked eye for the infrared camera to detect a
problem.

• Partial Discharge identifies voltage problems that result in


insulation breakdown and generation of Partial Discharges.
The specimen does not need to be visible for Partial
Discharges to be detected.
IQ Services
IQ Services
IQ Services
IQ Services
IQ Services

INSULATION BREAKDOWN

Why should we be concerned with insulation


breakdown and Partial Discharges?
IQ Services

INSULATION BREAKDOWN

• NFPA 70B states that insulation breakdown


is the number one cause of electrical
failures.

• In medium and high voltage equipment,


partial discharges are the first indication of
insulation breakdown.
IQ Services

Total Failures due to Insulation


Breakdown
Component Percentage of insulation failure

Transformers 84%
Circuit Breakers 21%
Disconnect Switches 15%
Insulated Switchgear Bus 95%
Bus duct 90%
Cable 89%
Cable Joints (splices) 91%
Cable Terminations 87%

Based on IEEE Gold Book Table 36


IQ Services

WHAT TYPE OF FACILITES


ARE AFFECTED?
• INDUSTRIAL - Large Manufacturing,
Cogeneration
• COMMERCIAL - Research Parks, High Rises
• INSTITUTIONAL - Campuses, Hospitals
• GOVERNMENTAL - Military Bases, Large
Office Complexes
• UTILITY - Investor Owned, Municipalities
IQ Services

WHERE DO PARTIAL
DISCHARGES OCCUR?
• Electrical Systems > 600V (2.4KV, 4.16 KV,
12KV, etc.)
• Types of Equipment Subject to Partial
Discharge
-Cables -Transformers
-Circuit Breakers - Instrument Transformers
-Switchgear (CT’s, PT’s)
-Insulators - Bushings
-Generators - Motors
-Surge Arrestors - Capacitors
IQ Services

ADVANTAGES OF PARTIAL
DISCHARGE SURVEYS
• PREDICTIVE - failures can be prevented.
• NO OUTAGE NECESSARY - does not interrupt
operations.
• NON-DESTRUCTIVE - no damage to electrical
system.
• TRENDING - comparison to previous tests
possible
• PRIORITIZE MAINTENANCE ACTIVITIES -
determine which equipment to service first.
• PLANNING - allows time to schedule repairs.
• FINANCIAL CONTROL – repairs can be budgeted.
IQ Services

TYPICAL MEDIUM VOLTAGE


POWER CABLE
CONSTRUCTION
IQ Services

TYPICAL HIGH VOLTAGE


UNDERGROUND CABLE
SYSTEM
Source Load
Switchgear Unit Substation

Visible Cable Visible Cable


Terminations Terminations

Ground Level

Underground Cable in Conduit (not visible)


IQ Services

3 STAGES OF CABLE
INSULATION FAILURE
IQ Services

STAGE 1
No problems, minor voids therefore minor partial discharges

Jacket, Shield, Semi-conducting shield

INSULATION Imperfections
and voids

/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
voids
INSULATION

Jacket, Shield, Semi-conducting shield


IQ Services

STAGE 2
Tracking begins

Jacket, Shield, Semi-conducting shield

INSULATION

/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

INSULATION

Jacket, Shield, Semi-conducting shield


IQ Services

STAGE 3
CABLE FAILURE!

Jacket, Shield, Semi-conducting shield

INSULATION Blow-up
Phase-to-ground
/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

INSULATION

Jacket, Shield, Semi-conducting shield


IQ Services

HOW CAN PARTIAL


DISCHARGES BE DETECTED?
Discharges are detected by special signal processing equipment designed to
eliminate outside interference.
Capacitive Methods - For Unshielded Components
- Dry Type Transformers
- Instrument Transformers
- Switchgear
Inductive Methods - metal enclosed components
- Shielded Cables and Components
- Oil Filled Transformers
- Rotating Apparatus
Acoustic Emission Methods
- Dry & Oil Transformers
- Switchgear
- Unshielded Cables
IQ Services

Test Equipment & Sensors


IQ Services

Partial Discharge detection of a flaw


in a dry type transformer using
capacitive coupling

Transformer Coil

flaw
Detector

Capacitive
sensor
IQ Services

Propagation of Transient Earth


Voltages (TEV) in Switchgear
High Voltage Bus

Metallic Switchgear
Partial discharge cover (signal detected
site (inside) outside)
IQ Services

Measurements
using
Capacitive PD
sensors
IQ Services
Switchgear failure due to internal tracking
IQ Services

Tracking on epoxy resin busbar


IQ Services

Start of tracking on insulation


IQ Services

Failed Switchgear Insulation


IQ Services

Detecting PD Using Airborne


Acoustic (Ultrasonic) Sensors

Busbar

Sensor
Insulator
IQ Services

Airborne Acoustic Sensor


IQ Services

Insulator Failure Prevented


IQ Services

Partial Discharge detection of a void in a


shielded cable using inductive coupling.
Insulation
Conductor

Shield (grounded)
Void

+
Detector

Inductive Sensor
IQ Services
IQ Services

High Frequency Current Transformer Used to Test Cable in


High Voltage Substation
IQ Services
Failing Terminations
IQ Services

Molded Cable Accessory Failure


IQ Services

Splice Void
IQ Services

Shield Delamination Causing


Partial Discharge
IQ Services

Poor Workmanship Causing


Partial Discharge
IQ Services
Case Study

Testing 15kV cables

On-line testing of cables PD damage to termination


IQ Services

Identifying & Prioritising Circuits Most at Risk


Using On-Line PD Survey

L IV E L IN E P A R T IA L D IS C H A R G E S U R V E Y R E S U L T S
O F 629 HV FE E D E RS
1000

900

800

700
m V D i s c h a rg e

600

500

400

300

A C TIO N
200

100 CONCE RN

0
105

126

147

168

190

211

232

253

274

295

316

337

358

379

400

421

442

463

484

505

526

547

568

589

610
21

42

63

84
1

FEEDERS
IQ Services

PD Survey - Worst 30 Results


IQ Services

PERFORMING A PARTIAL
DISCHARGE SURVEY
• Analyze the single line drawing to develop plan
• Onsite Measurement
– Removal of equipment covers.
– Record field data.
– Obtain signatures of atypical components.
• Offsite Data Analysis
– Correlate measurements to single line drawing.
– Compare atypical results to like insulation from database.
– Analyze signatures.
– Trend Results.
• Report Generation
– Recognize immediate failure possibilities.
– Recommend possible repairs.
– Recommend possible resurvey frequency.
IQ Services

SUMMARY
• Electric Insulation will fail.
• Predicting failures is now possible through
Partial Discharge Analysis.
• No outage is required to survey the
equipment.
• Results can be prioritized and trended.
• Partial Discharge Surveys should be
performed annually.
IQ Services

We apologize to every electrical professional for taking 252 years


to prevent your failures.

Benjamin Franklin discovered electricity


in 1752. This year we launched an easy
to use, cost effective “no-outage” electrical
inspection technology that detects
medium and high voltage equipment
problems before they fail!

Das könnte Ihnen auch gefallen