Beruflich Dokumente
Kultur Dokumente
PREPARED BY :
1. AMIRA AMIZA BINTI AMINUDIN (2015429658)
2. NUR FARINA BINTI MOHAMAD SILAN (2015263522)
3. MOHD FAIZ BIN SAIBOL (2015409194)
4. AMAR BIN MOHD MAAROF (2015429558)
OF EH2206a
CHAPTER 1 INTRODUCTION
Reactor 5 developed a
leak in the vessel shell
and had to be removed
for repair
Failure of 20-in
Temporary bypass releases
Formed vapour
bypass assembly An expansion cyclohexane
cloud that
was fabricated to bellow failed vapour
ignited
bridge the gap 30 tons of
cyclohexane vapor
were released to
the air
Depiction of vapour release
CHAPTER 2 Analysis of rupture
20-inch Hypothesis