Legal Framework:

RA 10121
National Disaster Risk
Reduction and Comprehensive Land
Management Act (2010) Use Plan

Executive Legislative
Agenda
RA 9729
Climate Change Act (2009)
Responsible Offices:

RA 10121

Overseeing Implementing

NDRRMC OCD

RDRRMC OCD Regional Office

PDRRMC PDRRMO

C/MDRRMC C/MDRRMO

BDC BDRRMC
4 Thematic Areas

Recovery and
Rehabilitation

Prevention and
Mitigation
Response

Preparedness
Spiral Development of the 4 Thematic Areas

Recovery
and Rehab
Prevention
Response and
Mitigation

Preparedness

Prevention
Recovery and
and Rehab Mitigation Preparedness

Response
Prevention and Mitigation

Prevention – Outright elimination and avoidance of


adverse impacts of hazards through elimination of sources of
danger.

Mitigation – Put in place measures that would lessen or


limit adverse impacts of hazards.
Prevention and Mitigation

• PDRA • Evacuation Center


• Mangrove Planting • Solid Waste Management
• Artificial/Coral Reefs • Community-based DRRM
• Tree Planting • IEC Campaigns
• Embankments • Alternative livelihood
• Dikes
• Storm Drainage System
• Seawalls
• Wavebreakers
• Reinforced Concrete Columns
• Retaining Walls
Prevention and Mitigation

PDRA (Pre-Disaster Risk Analysis)-


is a process to evaluate a given hazard’s characteristics and its
possible impacts to the populace.

HAZARD

RISK
EXPOSURE VULNERABILITY
Prevention and Mitigation

Risk Assessment Formula

R – Risk
H – Hazard
R= H x V x E V – Vulnerability
E – Exposure
C C – Capability
Prevention and Mitigation

CDRRM Council BDRRM Committee


CDRRMO

Household Community-based Disaster Risk


Reduction
Preparedness

Build the capacities needed to efficiently manage all types of


emergencies and ensure orderly transitions from response to
sustained recovery.
Preparedness

CAPACITY
BUILDING

Skills Equipment
Development Procurement
Preparedness

• Contingency Planning
• Drills
• SAR Trainings
• Basic Life Support/First Aid Trainings
• Basic Firefighting
• Early Warning Systems
• Procurement of rescue equipment and vehicles
• Trainings on RDANA, PDNA, ICS etc.
Preparedness

Contingency Planning
“A forward planning process in a state of uncertainty in which:
• Scenarios and objectives are agreed,
• Managerial and technical actions defined,
• Potential response systems put in place
to prevent or better respond to an emergency

CP is a management process that:


• analyzes specific potential events in a state of uncertainty, and
• establishes response arrangements
Response

Provision of immediate emergency services and public


assistance during or immediately after a disaster in order to
save lives, reduce negative health impacts, ensure public
safety.
Response

• Incident Command System


• RDANA (Rapid Damage Assessment and Needs Analysis)
• Search and Rescue
• Search and Retrieval
• Relief Operations
• Evacuation
Response

Incident Command System

• One of the tools for


implementing the CP
• A standard, on-scene, all-
hazard incident management
concept.
Response

RDANA
An emergency response tool used during the early and
critical state after hazard impact

It identifies the magnitude of a hazard and coping


capacity of the affected area

It aims to determine the immediate relief and


response requirements

 “SNAPSHOT ”
Recovery and Rehabilitation

Rehabilitation – are measures that will ensure the ability


of affected communities and/or areas to restore their normal
level of functioning by rebuilding/rehabilitating damaged
infrastructures.

Post Disaster Recovery – the restoration and


improvement where appropriate, of facilities, livelihood and
living conditions of disaster-affected communities.
Recovery and Rehabilitation

PDNA (Post-Disaster Needs Analysis)


- is a multi-sectoral and multidisciplinary structured
approach for assessing disaster impacts and
prioritizing recovery and reconstruction needs.
- Serves as the basis for a Recovery and Rehab Plan
Recovery and Rehabilitation

Not just to BUILD BACK…